| 2006-10-19 15:39:56 | UNSAT |
| | REFERENCE: FBC-2004 FUEL GAS AND FBC-2004 CHAPTER 1. |
| | |
| | THE FOLLOWING INFORMATION IS REQUIRED FOR GAS PLAN |
| | REVIEW: |
| | |
| | 1. FBC-2004 CHAPTER 1,SECTION 106.3.4.2: |
| | THE PERSON RESPONSIBLE FOR THE DESIGN OF |
| | THE DRAWING SHALL CLEARLY PRINT AND SIGN |
| | NAME, AND ALSO DATE DRAWING. PLEASE DO |
| | THIS PRIOR TO RESUBMITTING. |
| | |
| | 2. SUBMIT MANUFACTURE SHEETS FOR ALL GAS |
| | EQUIPMENT (1ST AND 2ND STAGE REGULATORS) TO VERIFY |
| | COMPLIANCE WITH |
| | STANDARDS NFPA 54, NFPA 58, AND THE |
| | FBC-2004 FUEL GAS CODE SEC 402.2 |
| | |
| | 3. PLEASE SUBMIT MANUFACTURER CUT SHEETS AND |
| | INSTALLATION INSTRUCTIONS OF GENERATOR THAT VERIFY BTU |
| | LOAD AND RECOMMENDATION OF MINIMUM CLEARENCES TO |
| | STRUCTURES. |
| | |
| | 4. CLEARLY SHOW THE LOCATION AND CAP- |
| | ACITY OF LP TANK(S), TYPE OF TANK (DOT |
| | OR ASME), THE DISTANCE OF THE TANK FROM |
| | THE BUILDING AND ADJACENT PROPERTY LINES ON TWO COPIES |
| | OF SURVEY. |
| | THE DISTANCE OF THE TANK FROM ALL SOUR- |
| | CES OF IGNITION, OTHER CONTAINERS, BUILD |
| | INGS, AND THE LOCATION OF ANY BUILDING |
| | OPENINGS BELOW THE RELIEF VALVE OF THE |
| | TANK PER NFPA 58, TABLE 3-2.2.2. |
| | |
| | 5. PROVIDE NOTICE OF COMMENCEMENT RECORDED WITH THE |
| | CLERK OF COURT BEFORE A PERMIT CAN BE ISSUED. |
| | |
| | END OF COMMENTS: |
| | |