2006-12-18 15:53:26DENIED BY BUILDING
  
 1)A RECORDED COPY OF THE NOTICE OF
 COMMENCEMENT MUST BE SUBMITTED BEFORE A
 PERMIT CAN BE ISSUED.
  
 2) PROJECT IS LOCATED IN AN 'A8' FLOOD
 ZONE AN ELEVATION CERTIFICATE WILL BE
 REQUIRED. EQUIPMENT IS REQUIRED TO BE
 LOCATED 6" ABOVE BASE FLOOD ELEVATION.
  
 3)AN INTERNAL PRESSURE COEFFICENT OF + / - 0.18 IS
 SPECIFIED ON THE PLANS. THIS INDICATES THAT THIS IS AN
 ENCLOSED STRUCTURE, WHICH IT IS NOT. PLEASE CORRECT.
 SEE FBC 1603.1.4 AND ASCE 7-02.
  
 4) SUBMIT THE MANUFACTURES SPECIFICATIONS INDICATING
 THE ATTACHMENTS OF THE EQUIPMENT TO THE CONCRETE PAD.
 FBC 1609.1.3.
  
 5) SEE COMMENTS OF OTHER TRADES.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714