2007-02-02 08:07:46***** UNSAT 2ND REVIEW*******
  
 **** IMPORTANT****
  
 ** PLEASE SEE THE NOTES BELOW ARE TAKEN DIRECTLY FROM
 THE PREVIOUS REVIEW WITH A *NO*, *OK* OR *NO/OK*.
  
 A) A, NO WILL CONTAIN A FURTHER EXPLANATION AS TO WHY
 THE COMMENT MAY NOT HAVE BEEN FULLY ADDRESSED WITH THE
 PREVIOUS REVIEW NOTE BELOW WITH **PREVIOUS REVIEW NOTE
 #1**
  
 B) A, OK, WILL HAVE NO COMMENTS EXCEPT PERHAPS A
 REFERENCE TO SEE ** NEW NOTES*. THE PREVIOUS REVIEW
 NOTE WILL BE REMOVED.
  
 C) A, NO/OK, WILL HAVE FURTHER EXPLANATION AS PART OF
 THE COMMENT MAY HAVE BEEN ADDRESSED, HOWEVER NOT ALL.
 THE PREVIOUS REVIEW NOTE WILL BE NOTED **PREVIOUS
 REVIEW NOTE #1**
  
 D) NEW NOTES WILL BE ADDED TO THE END AND LABELED **
 NEW NOTES **.
  
  
  
 1) NOTE: NO, PLEASE SEE PLANS DO NOT CONTAIN ANY CODE
 INFORMATION AS REQUIRED.
 FBC 106.1.2, 106.5.3.1.2 ETC.
  
 ** PREVIOUS REVIEW NOTE REVIEW #1**
 PLEASE SUBMIT PLANS WHICH REFLECT THE 2002 NFPA-70
 (NEC), THE 2002
 NFPA-110, 2004 FBC.
  
 2) NOTE: OK/NO, PLEASE SEE THE SPECS FOR THE UNIT ARE
 OK, HOWEVER PLEASE SEE THE ENGINEERING SUBMITTED FOR
 THE SLAB CONTAINS A RAISED SEAL OVER A COLOR
 PHOTO-COPIED SIGNATURE WHICH IS NOT PERMITTED UNDER FS
 471.025.
 PLEASE SEE THE STRUCTURAL CONNECTION WITH THE USE OF 4-
 2 1/4 INCH TAPCONS DO NOT SEEM SUFFICIENT, PLEASE SEE
 BUILDING REVIEW COMMENTS.
  
 ** PREVIOUS REVIEW NOTE FROM REVIEW #1**
 PLEASE CORRELATE SLAB DETAIL AND SPECS FROM
 MANUFACTURE. PLEASE SEE SIZE INDICATED FOR THIS 80KW
 UNIT DOES NOT EXIST ON SHEETS FROM THIS MANUFACTURE AND
 HAS NOT BEEN LOCATED ON THEIR WEBSITE.
 PLEASE SEE NFPA-110 CHAPTER 7 FOR MOUNTING AND
 LOCATIONS OF GEN..
 FBC CHAPTER 27. 2004.
 ** PLEASE SEE BUILDING REVIEW COMMENTS AS UNIT IS BEING
 PROPOSED IN A FLOOD ZONE "A", WHICH WILL REQUIRE UNIT
 AT A MIN OF 6" ABOVE BFE. PLEASE KNOW, ENGINEERING ON
 SLAB, FOUNDATION AND MOUNTING IS NEEDED AS THE
 INFORMATION SUBMITTED IS NOT SUFFICIENT.
 FBC 106.1.2
  
 3) NOTE:NO, SAME COMMENT, PLEASE PROVIDE LOAD
 CALCULATIONS FOR THE EXISTING SERVICE.
 220.35, 215.5, ETC. PLEASE SEE THE SEC AND FEEDERS TO
 EXISTING PANEL.
  
 ** PREVIOUS REVIEW NOTE REVIEW #1**
 PLEASE SEE RISER SUBMITTED IS SHOWING SEC'S AND FEEDERS
 WHICH ARE NOT LARGE ENOUGH FOR THE GENERATOR FEEDERS OR
 THE 600A SERVICE BEING SHOWN.
 PLEASE SEE 240.4, 310.16 AND ADJUST.
  
 4) NOTE: NO, SAME COMMENT, NO EGC IS TO BE INSTALLED
 FROM METER TO FIRST MEANS OF DISCONNECT, THIS IS
 PARALLELING THE NEUTRAL.
  
 ** PREVIOUS REVIEW NOTE REVIEW #1**
 PLEASE SEE RISER IS SHOWING AN "EQUIPMENT GROUNDING
 CONDUCTOR" FROM METER TO MAIN/FIRST MEANS OF DISCONNECT
 WHICH WILL CREATE OBJECTIONABLE CURRENTS. 250.6,
 250.24B
  
 5) NOTE: NO, PLEASE SEE THE SITE PLAN SUBMITTED IN NOT
 SUFFICIENT WITH COMPLETE DETAILS LAYOUTS ETC. THIS MUST
 SHOW ALL IN DETAIL, NO WHITE OUT, OR HAND DRAWN CHANGES
 WHICH DEFER FROM EACH SHEET. PLEASE SEE FBC 106.1.3 FOR
 MINIMUM REQUIRED DETAILS.
  
 ** PREVIOUS REVIEW NOTE REVIEW #1**
 PLEASE BE SURE UNIT IS BEING SHOWN ON SITE/SURVEY PLANS
 SHOWING THE EXACT LOCATIONS AND SETBACKS FROM ALL
 SURROUNDING STRUCTURAL WALLS, FENCES ETC.
 PLEASE OBTAIN INFORMATION FROM GENERATOR MANUFACTURE
 WHICH SPECIFIES THE MINIMUM CLEARANCES. PLEASE KNOW, AS
 THE SPEC FOR THE GEN WAS NOT SUBMITTED, IT IS BEING
 ASSUMED THIS UNIT IS A GENERAC UNIT, AND THE
 INFORMATION OBTAINED FROM THIS OFFICE IS THAT THEY
 REQUIRE A MIN OF 5FT FOR THE LARGER LIQUID COOLED
 UNITS.
 110.3, 90.7
  
 6) NOTE: NO, THIS WAS STILL NOT SUBMITTED IN PACKAGE
 AND WILL BE REQUIRED AT STATED.
  
 ** PREVIOUS REVIEW NOTE REVIEW #1**
 PLEASE KNOW AS TO DATE THE SUBMITTED GENERATOR
 PACKAGE MUST CONTAIN THE GAS INFORMATION RISER ETC,
 PLEASE SEE PLUMB REVIEW COMMENTS.
  
 7) NOTE: NO, THE PARTIAL LAYOUT ON ONE SHEET IN THE
 PACKAGE DOES NOT PROVIDE THE DETAIL REQUESTED. PLEASE
 SEE THE MANUFACTURE SPEC/CUT SHEETS DO NOT INDICATE ANY
 LISTING FROM A NRTL.
 PLEASE SEE MODEL, UNIT, VOLTAGE, TYPE OF UNIT IS NOT
 HIGHLIGHTED ON SPECS.
 110.3, 90.7.
 FBC 106.1.2
  
 **PREVIOUS REVIEW NOTE REVIEW #1**
 PLEASE PROVIDE A LAYOUT/OVERVIEW ON PLANS WHICH SHOWS
 THE LOCATIONS OF ALL SERVICE EQUIPMENT AS SHOWN ON
 RISER DIAGRAM.
 PLEASE SEE SPECS FOR ATS DO NOT SEEM TO INDICATE THE
 NEMA RATING IF THE ATS IS OUTSIDE.
 PLEASE ALSO HIGH-LIGHT UNIT.
 FBC 106.1.2, 110.3
  
 8) NOTE: NO/OK, THIS SEEMS TO BE OK, HOWEVER PLEASE
 KNOW AT THIS TIME AS THE LISTING ON EQUIPMENT CAN NOT
 VERIFIED BASED ON THE DOCUMENTATION SUBMITTED THIS
 COMMENT REMAINS.
  
 ** PREVIOUS REVIEW NOTE REVIEW #1**
 PLEASE SEE NO DISCONNECT GROUPED WITH THE EXISTING MAIN
 COULD BE LOCATED ON PLANS OR ON RISER. PLEASE SEE
 225.31-225.39, 230.72.
 PLEASE KNOW THE BREAKER LOCATED INSIDE THE GENERATOR IS
 NOT ACCEPTABLE FOR THIS.
 PLEASE KNOW THE ATS AS SUBMITTED DOES NOT CONTAIN A
 MAIN DISCONNECT RATED FOR THE LOAD SERVED AS REQUIRED
 FOR THE FEEDERS COMING FROM THE GENERATOR. THIS TYPE
 UNIT MAY ONLY CONTAIN "TOGGLE" TYPE DEVICE WHICH IS NOT
 RATED.
  
 9) NOTE: NO, SEE NOTE #3 ABOVE. PLEASE ALSO SEE NOT
 LOAD CALCULATIONS ARE SUBMITTED AT THIS TIME.
  
 ** PREVIOUS REVIEW NOTE REVIEW #1**
 PLEASE SUBMIT COMPLETE ELECTRICAL LOAD CALCULATIONS FOR
 THIS COMMERCIAL BUILDING. PLEASE SEE THE LOAD CALCS
 SUBMITTED ARE FOR A RESIDENTIAL HOUSE WHEN THIS IS A
 COMM BLDG.???? 220.3, 220.10, 220.11, 220.13, ETC
 CONTINUOUS LOADS AT 125% 215.3, 230.42 ETC.
  
 10) NOTE: OK, HOWEVER THIS COMMENT WILL REMAIN AS ANY
 NEW SHEETS SHOULD CONTAIN THE SAME.
  
 ** PREVIOUS REVIEW NOTE REVIEW #1**
 WHEN SUBMITTING PLANS/DESIGNS WHICH ARE NOT DONE BY AN
 ENGINEER, PLEASE SEE THAT ALL PLANS/DESIGNS MUST
 CONTAIN THE PRINTED NAME AND SIGNATURE OF THE PERSON
 RESPONSIBLE FOR PLANS AND DESIGNS.
 FBC 106.1.2
  
  
 **** NEW NOTES****
  
 11) NOTE: PLEASE SEE THE NOTICE OF COMMENCEMENT HAS
 EXPIRED SINCE ITS RECORDING IN AUGUST. PLEASE SEE THAT
 THE NOC WILL ONLY NEED TO BE RE-RECORDED BEFORE PICKING
 UP THE PERMIT. FS 713.13(2).
  
 12) NOTE: PLEASE SEE AS THE SCOPE OF WORK AND EQUIPMENT
 HAS INCREASED SO THE VALUE FOR COMPELTE SCOPE OF WORK
 NEEDS TO BE INCREASED.
 FBC 108.3
  
 13) NOTE: PLEASE SEE 553.80(2)(B) WITH RESPECT TO
 REPEAT COMMENTS FOR CODE COMPLIANCE. THIS IS ONLY A
 NOTICE AT THIS TIME.
  
 ** IMPORTANT**
 ONCE ALL REVIEWS ARE DONE AND PLANS ARE
 PICKED UP FOR CORRECTIONS, PLEASE BE
 SURE TO COMPLETELY REMOVE ALL OLD/VOIDED
 SHEETS AND ONLY INSERT NEW REVISED
 SHEETS INTO TWO COMPLETE SETS FOR REVIEW
 AND STAMPING. DO NOT LEAVE ANY
 OLD/VOIDED SHEETS IN SETS.
 PLEASE KNOW ONLY ONE SET OF THE
 OLD/VOIDED SHEETS SHOULD BE SUBMITTED
 FOR REFERENCE.
 THIS WILL HELP IN THE REVIEW PROCESS AND
 AVOID ANY DELAYS.
  
 ** PLEASE BE SURE TO CALL IF THERE ARE ANY QUESTIONS OR
 COMMENTS WITH RESPECT TO THE TYPED COMMENTS ABOVE. IF
 THERE ARE ANY COMMENTS WHICH ARE NOT CLEAR IN ANY WAY,
 NOT UNDERSTOOD OR NOT TYPED IN A CLEAR MANOR, PLEASE DO
 NOT HESITATE IN CONTACTING THIS OFFICE AND THIS
 REVIEWER.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 CONSTRUCTION SERVICES DEPT.
 CITY OF WEST PALM BEACH
 561-805-6717
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved