| Date |
Text |
| 2007-02-20 11:46:34 | DENIED |
| | REFERENCE: FBC-2004 FUEL GAS AND CITY OF WEST PALM |
| | BEACH GAS PERMIT APPLICATION REQUIREMENTS: |
| | |
| | ** PLEASE SEE SOME NOTES FROM PREVIOUS REVIEW ARE STILL |
| | IN NEED OF ADDRESSING ALONG WITH SOME NEW COMMENTS, |
| | SOME BASED ON PLANS NOW SUBMITTED, NEW DOCUMENTS BEING |
| | REVIEWED FOR THE FIRST TIME AND SOME NEW COMMENTS NOT |
| | MADE ON PREVIOUS REVIEWS. |
| | |
| | ** PLEASE SEE THE NOTES BELOW ARE TAKEN DIRECTLY FROM |
| | PREVIOUS REVIEW WITH A NO, OK OR A NO/OK. |
| | THESE WILL BE FOR THE EXACT NUMERICAL NOTATION OF THE |
| | PREVIOUS REVIEW NOTES. |
| | |
| | A NO IS IF THE COMMENT WAS NOT FULLY ADDRESSED AND/OR |
| | FURTHER EXPLANATION OR CHANGES IN PLANS OR DOCUMENTS |
| | ARE STILL NEEDED. THIS REVIEWER WILL TRY TO BETTER |
| | EXPLAIN NOTE ABOVE PREVIOUS REVIEW COMMENT. |
| | |
| | AN OK WILL BE LABELED AS SUCH ON THE SAME NUMERICAL |
| | COMMENT AND WILL HAVE OLD NOTE REMOVED FROM COMMENTS. |
| | |
| | A NO/OK MEANS PART OF THE COMMENT MAY HAVE BEEN |
| | ADDRESSED, HOWEVER NOT ALL OF THE PREVIOUS REVIEW |
| | COMMENT MAY HAVE BEEN FULLY ADDRESSED. |
| | |
| | ** PLEASE SEE ANY NEW NOTES WILL BE ADDED TO THE END OF |
| | THE PREVIOUS REVIEW COMMENTS AND NOTED AS SUCH. |
| | |
| | 1. OK |
| | |
| | 2. NO. |
| | ** SHOW TYPE OF PIPING MATERIAL BEING |
| | INSTALLED, ALL PIPE SIZES, (AND THE EDH |
| | NUMBER OF CORRUGATED STAINLESS STEEL |
| | TUBING FOR EACH PIPE SIZE BEING USED. |
| | NOTE: SHEET P-1 INDICATES PIPING MATERIAL TO BE |
| | SCHEDULE 40 BLACK STEEL. |
| | |
| | A} PER FBC-2004 FUEL GAS, SECTION 404.8 PROTECTION |
| | AGAINST CORROSION. FERROUS METAL EXPOSED IN EXTERIOR |
| | LOCATIONS SHALL BE PROTECTED FROM CORROSION IN A MANNER |
| | SATISFACTORY TO THE CODE OFFICIAL. |
| | NOTE: PLEASE ADD TO RESUBMITTED NOTES. |
| | |
| | B} PER FBC-2004 FUEL GAS, SECTION 404.8.1 PROHIBIED |
| | USE, UNCOATED THREADED OR SOCKET WELDED JOINTS SHALL |
| | NOT BE USED IN PIPING IN CONTACT WITH SOIL OR WHERE |
| | INTERNAL OR EXTERNAL CREVICE CORROSION IS KNOWN TO |
| | OCCUR. |
| | NOTE: PLEASE ADD TO RESUBMITTED NOTES. |
| | |
| | C} PER FBC-2004 FUEL GAS, SECTION 404.8.2 PROTECTIVE |
| | COATINGS AND WRAPPING. PIPE PROTECTIVE COATINGS AND |
| | WRAPPINGS SHALL BE APPROVED FOR THE APPLICATION AND |
| | SHALL BE FACTORY APPLIED. |
| | NOTE: PLEASE ADD TO RESUBMITTED NOTES. |
| | |
| | ** NOTE: IT IS SUGGESTED THAT ANY NEW UNDERGROUNG |
| | PIPING MATERIAL FOR THE GAS SYSTEM BE POLYETHYLENE |
| | PLASTIC PIPE (PE). ALSO IF PE PIPE IS USED FOR THE |
| | GENERATOR THE PIPE SIZE WILL NEED TO BE INCREASED TO |
| | 2-1/2" FOR THE GENERATOR. PLEASE BE AWARE THAT |
| | UNDERGROUND GALVANIZED PIPE IS UNACCEPTABLE TO THE CODE |
| | OFFICIAL PER FBC-2004 FUEL GAS, SECTION 404.8. |
| | |
| | 3. OK |
| | |
| | 4. OK |
| | |
| | 5. NO |
| | ** INDICATE THE DELIVERY PRESSURE (PSI) |
| | PER FBC-2004 FUEL GAS CODE SEC. 402.2. |
| | NATURAL GAS SPECIFY .5 PSI OR 2 PSI. |
| | NOTE: THE REFERENCE TO THE FUEL GAS TABLE 402.4 (2) IS |
| | NOT ACCEPTABLE AS A DELIVERY PRESSURE. DELIVERY |
| | PRESSURE CAN NOT BE ASSUMED, IT MUST BE CLEARLY |
| | INDICATED ON THE RESUBMITTAL. |
| | |
| | 6. OK |
| | |
| | 7. OK |
| | |
| | 8. OK |
| | |
| | **IN ORDER TO EXPIDITE PLAN REVIEW: WHEN RESUBMITTING, |
| | PLEASE REPLACE ONLY SHEETS |
| | WHICH HAVE CHANGED AND PROVIDE ONE COPY |
| | OF ALL OLD/VOIDED SHEETS FOR REFERENCE |
| | ONLY. NOTE: ONLY ONE CORRECTED DRAWING |
| | IN RED INK FOR REFERENCE FOR RESUBMITTAL. |
| | |
| | END OF COMMENTS: |
| | |
| | REVIEW BY MIKE PERSON |
| | (561) 805-6730 |
| | FAX (561) 805-6731 |
| | E-MAIL [email protected] |
| | UNDER SUPERVISION OF K.STEVENS |
| | (561) 805-6721 |
| | |
| | |