| Plan Review Notes For Permit 06080911 |
| Permit Number |
06080911 |
|
| Review Stop |
G |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2007-05-04 16:02:10 | REVISION: CHANGED PIPE MATERIAL, BTU LOAD AND LONGEST | | | LENGTH. | | | | | | ****************PROVISO**************** | | | A} PER THE INDICATED FBC-2004 FUEL GAS, TABLES | | | 402.4(2) AND 402.4(20) GAS SYSTEM IS NATURAL GAS. | | | | | | B} PER FBC-2004 FUEL GAS, SECTION 408.4 A SEDIMENT | | | TRAP IS REQUIRED FOR THE TANKLESS WATER HEATER. | | | | | | C} PER FBC-2004 FUEL GAS, SECTION 404.13.3AN | | | INSULATED COPPER TRACER WIRE SHALL BE INSTALLED | | | ADJACENT TO UNDERGROUND NONMETALLIC GAS PIPING. THE | | | TRACER WIRE SIZE SHALL NOT BE LESS THAN 18 AWG AND THE | | | INSULATION TYPE SHALL BE SUITABLE FOR DIRECT BURIAL. |
|