| 2007-01-29 12:07:52 | ***** UNSAT 2ND REVIEW ******* |
| | |
| | ** PLEASE SEE SOME ITEMS FROM PREVIOUS REVIEW ARE STILL |
| | IN NEED OF ADDRESSING. |
| | PLEASE SEE COMMENTS BELOW WHICH ARE TAKEN DIRECTLY FROM |
| | PREVIOUS REVIEW WITH A *NO* OR *OK* IN FRONT OF |
| | PREVIOUS NOTE. |
| | |
| | **IMPORTANT** |
| | *PLEASE SEE NEW NOTES NOW ADDED FOR THESE PLANS NOW |
| | SUBMITTED. |
| | |
| | |
| | |
| | 1) NOTE:NO, PLEASE SEE PERMIT APPLICATION AND SCOPE |
| | OF WORK STILL DOES NOT CORRELATE. |
| | |
| | A) PLEASE SEE SUBMITTALS ARE STILL BEING SUBMITTED |
| | (ATTACHED TO OLD PLANS) AS DIESEL AND NATURAL GAS? |
| | |
| | B) PLEASE SEE TWO DIFFERENT SIZE GENERATOR UNITS ARE |
| | BEING SHOWN. |
| | |
| | C) PLEASE SEE AS STATED PREVIOUSLY ON SITE FUEL IS |
| | REQUIRED FOR LEGALLY REQUIRED STAND-BY SYSTEMS. MAY NOT |
| | RELY SOLELY ON THE UTILITIES. |
| | PLEASE KNOW BASED ON THIS ALONE THIS WILL AFFECT PLANS, |
| | AND LOCATION OF TANK REQUIRED. PLEASE ALSO KNOW THAT |
| | BASED ON WHETHER OR NOT THE GENERATOR IS NATURAL GAS OR |
| | DIESEL, THE FUEL CONSUMPTION SHALL BE STATED FOR |
| | MINIMUM TIMES. |
| | |
| | D) PLEASE KNOW BASED ON *C* ABOVE, THE ON SITE FUEL |
| | WILL BE REQUIRED TO BE LOCATED AT THE GROUND FLOOR |
| | LEVEL WHICH WILL REQUIRE SITE PLANS, AND PLANS FOR THIS |
| | PART OF THE INSTALLATION. |
| | NFPA-110 CHAPTER 7 WHICH REQUIRES MORE INFORMATION FOR |
| | THE ENTIRE INSTALLATION. ISOLATION FROM STRUCTURE, |
| | LOCATION OF FUEL SOURCE ETC. |
| | PLEASE SEE 701.11(B)(3) FOR ON-SITE FUEL. |
| | PLEASE SEE 110.3, 90.7, 215.5, 240.4 ETC AS THE REVIEW |
| | FOR CODE COMPLIANCE CAN NOT BE FULLY ACCOMPLISHED BASED |
| | ON THE PERMIT APPLICATION SHOWING ONE SYSTEM, AND THE |
| | PLANS AND THE SPECS SHOWING TWO OTHER SYSTEMS. |
| | |
| | E) PLEASE MEANS OF DISCONNECT AND SHUTTING DOWN POWER |
| | ETC CAN NOT BE VERIFIED. 230.70, 230.72 ETC |
| | |
| | ** PREVIOUS REVIEW NOTE FROM REVIEW #1** |
| | PLEASE CORRELATE PLANS, PERMIT APPLICATION AND |
| | SUBMITTALS. |
| | PLEASE SEE PLANS INDICATE A DIESEL GEN, AND NATURAL GAS |
| | GEN. |
| | PLEASE KNOW A DIESEL GEN WILL NOT BE PERMITTED ON THE |
| | ROOF TOP. PLEASE ALSO KNOW ANY PERMISSION FOR OTHER GEN |
| | ON ROOF IS NOT APPROVED AT THIS TIME. PLEASE KNOW A |
| | CONFERENCE WITH THE FIRE MARSHAL AND PLAN REVIEW FOR |
| | POSSIBILITIES OF THE PERMITTING A NAT GAS GEN MUST BE |
| | HELD BEFORE PERMISSION WILL BE GRANTED. SHUT DOWN OF |
| | FUEL, GEN , MOTOR AND SHUNT OF FEEDERS MAY ALL BE |
| | REQUIRED ON THE GROUND FLOOR OF BLDG. |
| | PLEASE KNOW AS MORE THAN ONE SIZE OF GEN AND TYPE FOR |
| | PRIME MOVER IS BEING SUBMITTED, A COMPLETE REVIEW CAN |
| | NOT BE DONE AT THIS TIME. |
| | PLEASE SEE NFPA-110 PLEASE SEE ALL OF CHAPTER 7. PLEASE |
| | KNOW, GAS FUEL LINE SHALL NOT BE GALVANIZED 7.9.3.1. |
| | PLEASE ALSO SEE 701.11(B)(3) FOR DUEL FUEL SUPPLIES |
| | REQUIRED. MAY NOT RELY ONLY ON THE UTILITY. |
| | |
| | 2) NOTE: OK. |
| | |
| | 3) NOTE: NO, PLEASE SEE THE VALUE AS SHOWN ON |
| | APPLICATION BASED ON THE SCOPE OF WORK IS EXTREMELY LOW |
| | AND A VALUE WILL BE ADJUSTED. THIS NEEDS TO INCLUDE ALL |
| | STRUCTURAL WORK, GAS/FUEL, TANKS ETC. |
| | PLEASE SEE 108.3 |
| | |
| | **PLEASE KNOW, VALUE FOR COMPLETE |
| | SCOPE OF WORK SHALL INCLUDE ALL LABOR |
| | AND MATERIALS. AN INSTALLATION OF GAS |
| | LINE/ TO ROOF TOP, GEM, ATS ETC. |
| | FBC 108.3 |
| | |
| | 4) NOTE: OK. |
| | |
| | * ** IMPORTANT** |
| | ONCE ALL REVIEWS ARE DONE AND PLANS ARE |
| | PICKED UP FOR CORRECTIONS, PLEASE BE |
| | SURE TO COMPLETELY REMOVE ALL OLD/VOIDED |
| | SHEETS AND ONLY INSERT NEW REVISED |
| | SHEETS INTO TWO COMPLETE SETS FOR REVIEW |
| | AND STAMPING. DO NOT LEAVE ANY |
| | OLD/VOIDED SHEETS IN SETS. |
| | PLEASE KNOW ONLY ONE SET OF THE |
| | OLD/VOIDED SHEETS SHOULD BE SUBMITTED |
| | FOR REFERENCE. |
| | THIS WILL HELP IN THE REVIEW PROCESS AND |
| | AVOID ANY DELAYS. |
| | |
| | ** PLEASE BE SURE TO CALL IF THERE ARE ANY QUESTIONS OR |
| | COMMENTS WITH RESPECT TO THE TYPED COMMENTS ABOVE. IF |
| | THERE ARE ANY COMMENTS WHICH ARE NOT CLEAR IN ANY WAY, |
| | NOT UNDERSTOOD OR NOT TYPED IN A CLEAR MANOR, PLEASE DO |
| | NOT HESITATE IN CONTACTING THIS OFFICE AND THIS |
| | REVIEWER. |
| | |
| | |
| | |
| | |
| | DEWEY PALMER |
| | ELECTRICAL PLAN REVIEW |
| | CONSTRUCTION SERVICES DEPT. |
| | CITY OF WEST PALM BEACH |
| | 561-805-6717 |
| | [email protected] |