| 2006-07-26 00:00:00 | *** DENIED *** |
| | 1) MECHANICAL PLAN DUCT LAY-OUT AND |
| | EQUIPMENT LISTING IS FADED AND DIFFICULT |
| | TO READ. CONSTRUCTION DOCUMENTS SHALL BE |
| | OF SUFFICIENT CLARITY. PER 2004 FBC |
| | 106.1.1 . |
| | |
| | 2) PLANS SHOW TWO DIFFERENT A/C |
| | EQUIPMENT LISTINGS, PLEASE CORRECT. ALSO |
| | HAVE EQUIPMENT LISTING SHOW HEATER |
| | SIZE(KW), TOTAL COOLING BTU'S, AND |
| | SENSIBLE BTU'S. |
| | |
| | 3) SUPPLY AIR DUCT AND GRILL TO SECOND |
| | FLOOR BATHROOM NEEDS TO BE SIZED. |
| | |
| | 4) SECOND FLOOR BATHROOM AND MASTER |
| | BATHROOM WATER CLOSET NEED EXHAUST FANS, |
| | PER 2004 FBC/R M1506 . |
| | |
| | 5) RETURN AIR DUCT IN MASTER BEDROOM |
| | NEEDS TO BE 12", PER 2004 FBC/R M1602.4 |
| | |
| | 6) A/C DUCT LAY-OUT ON FIRST FLOOR IS |
| | NOT DESIGNED PROPERLY PLEASE CORRECT. |
| | CONSTRUCTION DOCUMENTS SHALL BE OF |
| | SUFFICIENT CLARITY. PER 2004 FBC 106.1.1 |
| | . |
| | |
| | 7) PROVIED RETURN AIR FOR FIRST FLOOR |
| | AIR HANDLER. |
| | |
| | 8) MANUAL J CAALCULATIONS ARE ONLY |
| | CALLING FOR ONE A/C SYSTEM, PLANS ARE |
| | CALLING FOR TWO A/C SYSTEMS, THE TWO |
| | MUST COINCIDE, PLEASE CORRECT. |
| | |
| | 9) ENERGY CALCULATIONS NEED TO BE ON |
| | FORM 600A-04 (2004) PER FBC 13-600.3.A . |
| | |
| | 10) ENERGY CALCULATIONS NEED TO BE |
| | SIGNED BY OWNER/AGENT, PER 2004 FBC |
| | 13-600.3.ABC.2 |
| | |
| | 11) MECHANICAL PLANS HAVE AN ENGINEER'S |
| | NAME IN THE TITLE BLOCK, THEREFORE |
| | REQUIRE HIS SEAL AND SIGNATURE, PER FAC |
| | 61G15-23.002 . |
| | |
| | MECHANICAL PLAN REVIEW BY; |
| | TOM GORDON (561) 805-6729. |