Plan Review Notes
Plan Review Notes For Permit 06071166
Permit Number 06071166
Review Stop E
Sequence Number 2
Notes
Date Text
2006-08-20 00:00:00*** UNSAT 2ND REVIEW **
  
 1) NOTE: PLEASE SEE THE NOTES FROM
 PREVIOUS REVIEW AS THESE ARE THE SAME
 WHICH STILL NEED TO BE ADDRESSED.
 PLEASE SEE THAT THE EXACT SMAE PLANS
 SUBMITTED FOR THE PREVIOUS REVIEW WERE
 SUBMITTED BACK. NO CHANGES WERE MADE.
  
 2) NOTE: PLEASE CORRELATE HEAT PUMP ON
 CALCULATIONS WITH THE SPECS SUBMITTED.
  
 3) NOTE: PLEASE SEE FS 553.80(2)(B) WITH
 RESPECT TO REPEAT COMMENTS FOR CODE
 COMPLIANCE.
  
 ** ALL NOTES FROM FIRST REVIEW STILL
 STAND. SEE THESE ARE BEING ATTACHED.
  
 ** IMPORTANT**
 ONCE ALL REVIEWS ARE DONE AND PLANS ARE
 PICKED UP FOR CORRECTIONS, PLEASE BE
 SURE TO COMPLETELY REMOVE ALL OLD/VOIDED
 SHEETS AND ONLY INSERT NEW REVISED
 SHEETS INTO TWO COMPLETE SETS FOR REVIEW
 AND STAMPING. DO NOT LEAVE ANY
 OLD/VOIDED SHEETS IN SETS.
 PLEASE KNOW ONLY ONE SET OF THE
 OLD/VOIDED SHEETS SHOULD BE SUBMITTED
 FOR REFERENCE.
 THIS WILL HELP IN THE REVIEW PROCESS AND
 AVOID ANY DELAYS.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE DO NOT HESITATE TO CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 CONSTUCTION SERVICES DEPT.
 CITY OF WEST PALM BEACH
 561-805-6717
 [email protected]
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved