| Date |
Text |
| 2006-08-01 00:00:00 | ******DENIED****** |
| | REFERENCE: FBC-2004 FUEL GAS |
| | FBC-2004 CHAPTER 1 |
| | |
| | THE FOLLOWING CORRECTIONS AND INFORMA- |
| | TION IS REQUIRED ON THE ISOMETRIC GAS |
| | RISER DIAGRAM FOR GAS PLAN REVIEW: |
| | |
| | 1. CLEARLY SHOW THE TYPE OF PIPING |
| | MATERIAL BEING INSTALLED AND ALL PIPE |
| | SIZES COINCIDING WITH THE CUT SECTIONS. |
| | 2. TYPE OF GAS, (LP OR NATURAL) PLEASE |
| | INDICATE ON DRAWING. |
| | 3. BTU LOAD OF EACH APPLIANCE AND THE |
| | TOTAL BTU LOAD ON THE SYSTEM. REFER TO |
| | THE FBC-2004 FUEL GAS CODE SECS. 401.8 |
| | THRU 402.6.1 AND TABLES 402.4(1) THRU |
| | 402.4(33).(NOTE: THIS INCLUDES THE |
| | EXISTING GAS SYSTEM, PLEASE SEE ATTACHED |
| | PERMIT INFORMATION SHEET FOR REFERENCE |
| | OF EXISTING SYSTEM HAVING GAS FOR |
| | RESUBMITTAL.) |
| | 4. SHOW THE DISTANCE FROM THE POINT OF |
| | DELIVERY, (METER), TO THE MOST REMOTE |
| | OUTLET IN THE BUILDING AND/OR SYSTEM PER |
| | FBC-2004 FUEL GAS CODE APPENDIX A - USE |
| | OF CAPACITY TABLES A.3.1(4).(NOTE: THIS |
| | INCLUDES THE EXISTING GAS SYSTEM, PLEASE |
| | SEE ATTACHED PERMIT INFORMATION SHEET |
| | FOR REFERENCE OF EXISTING SYSTEM HAVING |
| | GAS FOR RESUBMITTAL.) |
| | 5. INDICATE THE DELIVERY PRESSURE (PSI) |
| | PER FBC-2004 FUEL GAS CODE SEC. 402.2. |
| | NATURAL GAS SPECIFY .5 PSI OR 2 PSI. |
| | PROPANE 10 PSI OR 11" WC |
| | 6. IF SYSTEM IS 2LB NAT. GAS OR 10LB |
| | PROPANE SUBMIT MANUFACTURE SHEETS FOR |
| | ALL GAS EQUIPMENT (REGULATORS) TO VERIFY |
| | COMPLIANCE WITH STANDARDS NFPA 54, NFPA |
| | 58, AND THE FBC-2004 FUEL GAS CODE SEC |
| | 402.2. |
| | 7. IN THE GAS PERMIT APPLICATION THERE |
| | IS SUBMITTAL INFORMATION ON A PROPANE |
| | TANK, IF A PROPANE TANK IS TO BE USED |
| | THE FOLLOWING INFORMATION IS REQUIRED. |
| | (A) CLEARLY SHOW THE LOCATION AND CAP- |
| | ACITY OF LP TANK(S), TYPE OF TANK (DOT |
| | OR ASME), THE DISTANCE OF THE TANK FROM |
| | THE BUILDING AND ADJACENT PROPERTY LINES |
| | THE DISTANCE OF THE TANK FROM ALL SOUR- |
| | CES OF IGNITION, OTHER CONTAINERS, BUILD |
| | INGS, AND THE LOCATION OF ANY BUILDING |
| | OPENINGS BELOW THE RELIEF VALVE OF THE |
| | TANK PER NFPA 58, TABLE 3-2.2.2. |
| | (B) CLEARLY INDICATE ON THE PLAN IF THE |
| | LP TANK IS ABOVE OR BELOW GROUND, AND |
| | SHOW REQUIRED PROTECTION OF THE TANK AND |
| | APPURTENANCES PER NFPA 58. IF THE TANK |
| | IS BELOW GROUND THE CONTAINER SHALL BE |
| | SECURILY ANCHORED PER NFPA 58 SECTION |
| | 3-2.2.7(H). |
| | (NOTE: IF A PROPANE TANK IS NOT GOING TO |
| | BE USED PLEASE REMOVE TANK INFORMATION |
| | FROM PERMIT APPLICATION.) |
| | 8. FBC-2004 CHAPTER 1,SECTION 106.3.4.2: |
| | THE PERSON RESPONSIBLE FOR THE DESIGN OF |
| | THE DRAWING SHALL CLEARLY PRINT AND SIGN |
| | NAME, AND ALSO DATE DRAWING. PLEASE DO |
| | THIS PRIOR TO RESUBMITTING. |
| | |
| | **IN ORDER TO EXPIDITE PLAN REVIEW: WHEN |
| | RESUBMITTING, PLEASE REPLACE ONLY SHEETS |
| | WHICH HAVE CHANGED AND PROVIDE ONE COPY |
| | OF ALL OLD/VOIDED SHEETS FOR REFERENCE |
| | ONLY. PLEASE REFERENCE CORRECTED DRAWING |
| | IN RED INK FOR RESUBMITTAL.(NOTE: ONLY |
| | ONE CORRECTED DRAWING IN RED INK) |
| | |
| | END OF COMMENTS: |
| | |
| | REVIEW BY MIKE PERSON |
| | (561) 805-6730 |
| | FAX (561) 805-6731 |
| | E-MAIL [email protected] |
| | UNDER SUPERVISION OF K.STEVENS |
| | (561) 805-6721 |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |