| 2006-10-14 19:38:24 | *** UNSAT2ND REVIEW *** |
| | |
| | ** PLEASE SEE SOME NOTES FROM PREVIOUS REVIEW AND SOME |
| | NEW NOTES FOR PLANS SUBMITTED WHICH NOW INDICATE ITEMS |
| | NEEDED ON PREVIOUS REVIEW. |
| | |
| | 1) NOTE: PLEASE SUBMIT ALL MANUFACTURES SPECS/CUT |
| | SHEETS FOR ALL NEW EQUIPMENT WHICH WILL BE INSTALLED. |
| | PLEASE ALSO KNOW SOME COMMENTS BELOW WILL REQUIRE OTHER |
| | SPECS (TANK). |
| | |
| | 2) NOTE: PLEASE SEE 700.12B3 AND 701.11B3 AS ON SITE |
| | FUEL IS REQUIRED FOR THE MINIMUM AMOUNT OF TIME |
| | REQUIRED FOR BOTH EM AND LEGALLY REQUIRED."PRIME MOVERS |
| | SHALL NOT BE SOLELY DEPENDENT ON A PUBLIC UTILITY GAS |
| | SYSTEM FOR THEIR FUEL SUPPLY OR MUNICIPAL WATER SUPPLY |
| | FOR THEIR COOLING SYSTEMS. MEANS SHALL BE PROVIDED FOR |
| | AUTOMATICALLY TRANSFERRING FROM ONE FUEL SUPPLY TO |
| | ANOTHER WHERE DUAL FUEL SUPPLIES ARE USED." |
| | |
| | 3) NOTE: PLEASE SEE NFPA-20 2003 9.6.2.2 THE FUEL |
| | SUPPLY CAPACITY SHALL BE SUFFICIENT TO PROVIDE 8 HOURS |
| | OF FIRE PUMP OPERATION AT 100 PERCENT OF THE RATED PUMP |
| | CAPACITY IN ADDITION TO THE SUPPLY REQUIRED FOR OTHER |
| | DEMANDS. |
| | THIS IS REQUIRED FOR "ONSITE" FUEL. |
| | |
| | 4) NOTE: PLEASE SEEE NFPA-110 7.2.3*, THIS UNIT IS |
| | LOCATED IN A "FLOOD ZONE A, (SEE BLDG REVIEW ALSO). |
| | PLEASE PROVIDE COMPLETE ELEVATION FOR THIS TO MEET THE |
| | MIN LEVELS FOR EITHER ONE OF THE FOLLOWING. 100YR STORM |
| | ELEVATION OR BASED ON A CAT 4 STORM FROM THE "SLOSH" |
| | PREDICTION CHARTS. |
| | |
| | 5) NOTE: PLEASE SEE PLUMB REVIEW COMMENTS FOR TYPE OF |
| | MATERIALS REQUIRED FOR GAS LINE PER 7.9.3.1GALVANIZED |
| | FUEL LINES SHALL NOT BE USED. |
| | |
| | 6) NOTE: PLEASE SEE WE ARE UNABLE TO VERIFY THE AIC |
| | RATING FOR EQUIPMENT AT THIS TIME DUE TO GEN SPEC NOT |
| | SUBMITTED. |
| | PLEASE SEE 110.9, 240.12 FOR DETAIL ON SELECTIVE |
| | COORDINATION. PLEASE ALSO INDICATE LET THROUGH AND THE |
| | EXSITING RATING FOR THE EM PANEL MAIN. |
| | |
| | 7) NOTE: PLEASE SEE FBC 108.3 AS THE VALUE FOR COMPLETE |
| | SCOPE OF WORK ON PLANS SHALL INLCUDE ALL LABOUR AND |
| | MATERIALS FOR ALL SUBS AND EQUIPMENT, EVEN IF EQUIPMENT |
| | IS OWNER SUPPLIED. PLEASE KNOW A VALUE MAY BE ASSED |
| | BASED ON FAIR MARKET VALUE BASED ON MARSHALL'S & SWIFT |
| | GUIDE AS ADOPTED BY THE FBC ADMINSTRATIVE SECTION AS |
| | NOTED ABOVE. |
| | |
| | |
| | *** PLEASE KNOW AS SOME INFORMATION IS NOT YET |
| | SUBMITTED, THERE MAY BE FUTURE COMMENTS. |
| | |
| | ** IMPORTANT** |
| | ONCE ALL REVIEWS ARE DONE AND PLANS ARE |
| | PICKED UP FOR CORRECTIONS, PLEASE BE |
| | SURE TO COMPLETELY REMOVE ALL OLD/VOIDED |
| | SHEETS AND ONLY INSERT NEW REVISED |
| | SHEETS INTO TWO COMPLETE SETS FOR REVIEW |
| | AND STAMPING. DO NOT LEAVE ANY |
| | OLD/VOIDED SHEETS IN SETS. |
| | PLEASE KNOW ONLY ONE SET OF THE |
| | OLD/VOIDED SHEETS SHOULD BE SUBMITTED |
| | FOR REFERENCE. |
| | THIS WILL HELP IN THE REVIEW PROCESS AND |
| | AVOID ANY DELAYS. |
| | |
| | PLEASE SUBMIT THE ABOVE INFORMATION FOR |
| | REVIEW. IF THERE ARE ANY QUESTIONS, |
| | PLEASE DO NOT HESITATE TO CALL. |
| | |
| | DEWEY PALMER |
| | ELECTRICAL PLAN REVIEW |
| | CONSTRUCTION SERVICES DEPT. |
| | CITY OF WEST PALM BEACH |
| | 561-805-6717 |
| | [email protected] |
| | |