| Plan Review Notes For Permit 06070683 |
| Permit Number |
06070683 |
|
| Review Stop |
M |
| Sequence Number |
6 |
|
| Notes |
| Date |
Text |
| 2008-01-23 14:32:26 | REVISION 3 PG M2: DENIED | | | | | | NOTE: A FOUR PAGE SCOPE-OF-WORK REPORT WAS PROVIDED TO | | | SHOW NATURE AND LOCATION OF CHANGES. THIS REPORT DOES | | | NOT INDICATE ANY MECHANICAL PLANS AS PART OF THIS | | | REVISION. HOWEVER, PAGES M1, M2, R1, R2 AND R3 ARE ALL | | | INCLUDED IN THIS REVISION. | | | | | | 1. PG M2: ROOFTOP UNIT SCHEDULE HAS BEEN REVISED TO | | | REFLECT THE NEW OWNER-SUPPLIED EQUIPMENT. IN | | | CONJUNCTION WITH THAT CHANGE, NOTE #9 HAS BEEN UPDATED | | | TO REFLECT THE EFFICIENCY RATINGS OF THE NEWLY | | | SPECIFIED EQUIPMENT. THE EFFICIENCIES LISTED IN THIS | | | NOTE DO NOT CORRESPOND WITH THE CURRENT PERMIT ENERGY | | | CALCULATIONS. IN MOST CASES, THE EFFICIENCIES HAVE GONE | | | DOWN. PROVIDE REVISED ENERGY CALCULATIONS WHICH | | | INCORPORATE THE NEW EQUIPMENT EFFICIENCIES. | | | | | | 2. PG M2: THE 5 TON UNIT SHOWS AN EFFICIENCY RATING OF | | | 12.6 SEER. THE MINIMUM EFFICIENCY REQUIRED FOR A UNIT | | | THIS SIZE IS 13.0 SEER IN ACCORDANCE WITH FBC TABLE | | | 13-407.1.ABC.3.2A. THIS IS A PRESCRIPTIVE MINIMUM | | | REGARDLESS OF WHAT PASSES ON THE CALCULATIONS IN | | | ACCORDANCE WITH FBC 13-400.1. PG M2 WILL NOT PASS | | | REVIEW UNTIL THE NEW INFORMATION IS COORDINATED WITH | | | REVISED ENERGY CALCULATIONS. | | | | | | IF YOU HAVE ANY QUESTIONS PLEASE CONTACT: | | | RONALD J. REGUEIRO | | | 561.805.6719 | | | [email protected] |
|