| 2006-08-11 00:00:00 | BUILDING REVIEW 2ND CHECKLIST: |
| | |
| | 1- CONTRACTOR STATES IN PERMIT |
| | APPLICATION THAT CONCRETE TILE IS TO BE |
| | PLACED IN WOOD DECK BATTEN SYSTEM. DADE |
| | COUNTY NOA #02-1205.07 FOR MONIER |
| | SPANISH 'S' CONCRETE TILE DOESN'T ALLOW |
| | BATTEN SYSTEM INSTALLATION. SEE PAGE 4 |
| | OF 5 OF NOA. NEED TO PROVIDE PRODUCT |
| | APPROVAL THAT ALLOWS BATTEN SYSTEM |
| | APPLICATION OR PROVIDE SOLID DECK |
| | SYSTEM. |
| | PROVIDE COMPLETE STRUCTURAL DRAWINGS AND |
| | SPECIFICATIONS FOR SOLID DECKING UNDER A |
| | SEPARATE PERMIT FOR STRUCTURAL WORK. |
| | SEC. 106.1.2 CITY AMENDMENTS TO FBC 2004 |
| | AND SEC. 1609 FBC 2004. |
| | |
| | 2- SELF ADHERING UNDERLAYMENT (FLORIDA |
| | PRODUCT APPROVAL FL3732-R1) IS NOT |
| | ALLOWED. SEE RAS 120 FOR TYPES OF |
| | UNDERLAYMENTS ALLOWED. SPECIFY WHICH |
| | UNDERLAYMENT IS GOING TO BE USED. |
| | ALSO, ACCORDING TO THE ROOF SLOPE THERE |
| | ARE ROOF TILE NAILING REQUIREMENTS. SEE |
| | RAS 120 AND PROVIDE NAILING |
| | SPECIFICATIONS AS REQUIRED. |
| | |
| | 3- ORIGINAL APPLICATION CALLED FOR |
| | STRUCTURAL REPAIR WORK TO BE PERFORMED. |
| | ALL REPAIR WORK WAS CROSSED OUT FROM THE |
| | PERMIT APPLICATION. CLARIFY WHO'S DOING |
| | THIS WORK AND NEED TO PROVIDE ALL |
| | STRUCTURAL INFORMATION UNDER A SEPARATE |
| | PERMIT. |
| | |
| | JULIO GOMEZ |
| | BUILDING PLANS EXAMINER |
| | (561)805-6712 |