| 2006-07-20 00:00:00 | DENIED:2004 FLORIDA BUILDING CODE |
| | |
| | 1.PLAN SHEET S2 DETAIL 1 & 3, |
| | INDICATES A NEW CAP PLATE & I-BEAM TO BE |
| | WELDED ONTO THE EXISTING POST. |
| | DEMENSION OF 6" BETWEEN THE ROOF SURFACE |
| | AND BOTTOM OF THE OF THE I-BEAM IS 6" |
| | WITH THE CONDENSING UNITS LEGS ARE 2' |
| | LONG.PER 2004 FBC 1509.7 WHERE ROOFING |
| | MATERIALS EXTEND BENEATH THE UNIT ON |
| | REAISED EQUIPMENT SUPPORTS, THE MINIMUM |
| | CLEARANCE SHALL BE IN ACCORDANCE WITH |
| | TABLE 1509.7 FROM THE ROOF SURFACE WO |
| | THE BOTTOM OF THE SUPPORT RAIL.THE 6" |
| | DOES NOT MEET THIS REQUIREMENT. |
| | |
| | 2.PLEASE CLARIFY DETAIL ON PLAN SHEET |
| | M-3.REFRIGERANT LINES THROUGH THE |
| | BUILDING TO THE ROOF SHALL COMPLY WITH |
| | 2004 FBC 1514.2.5 THROUGH 1514.2.5.2 |
| | |
| | 3.PLEASE NOTE, REFRIGERANT LINS SHALL |
| | COMPLY WITH ASHRAE 62-2001 |
| | |
| | 4.PLAN SHEET A-2 INDICATES A DETAIL |
| | FOR PATE CURB FOR MULTPLE PIPES |
| | PENETRATIONS.ARCHITECTURAL PLANS DO |
| | NOT SHOW DETAIL OF THE GALVANIZED TROUGH |
| | AS INDICATED ON PLAN SHEET M-3. |
| | |
| | 5.PLEASE CLARIFY THE REFRIGERANT |
| | PIPING DETAIL THRU ROOF SHOWN ON PLAN |
| | SHEET M-4.THIS INDICATES INSULATED |
| | PIPING THROUGH CONCRETE ROOF SLAB, SHOW |
| | COMPLIANCE WITH 2004 FMC 1107.2.1. |
| | DETAIL ALSO INDICATES COUNTER FLASHING |
| | TO BE SAME MATERIAL AS THE PIPE AND IS |
| | TO BE SOLDERED TO REFRIGERANT LINE.IS |
| | THIS CORRECT? |
| | |
| | IF YOU HAVE ANY QUESTIONS, PLEASE |
| | CONTACT PATTY KRAUSS AT (561)805-6719. |
| | |
| | |