Plan Review Notes
Plan Review Notes For Permit 06061461
Permit Number 06061461
Review Stop E
Sequence Number 2
Notes
Date Text
2006-10-24 12:00:01****** UNSAT2ND REVIEW ********
  
 ** PLEASE KNOW PLANS AHVE ONLY BEEN SUBMITTED FOR "PLAN
 REVIEW" ONLY AND EVEN IF PLANS PASS THEY CAN NOT BE
 STAMPED UNTIL SUCH TIME A PERMIT HAS BEEN APPLIED FOR
 .
 PLEASE SEE REVIEWS ARE BASED ON PLANS REVIEW FOR A
 "PROJECT" ONLY.
  
 ** PLEASE SEE SOME NOTES FROM PREVIOUS REVIEW ARE THE
 SAME AND SEE NEW NOTE DUE TO A CHANGE AND INFORMATION
 FOUND IN THE CODE.
 PLEASE SEE NOTE BELOW ARE TAKEN DIRECTLY FROM PREVIOUS
 REVIEW WITH NEW NOTES ADDED.
  
 1) NOTE:OK, HOWEVER PLEASE DO THE SAME WHEN
 RESUBMITTING PLANS FOR REVIEW ONCE AGAIN.
  
 ** PREVIOUS REVIEW NOTE **
 PLEASE BE SURE TO COMPLETELY
 REMOVE ANY OF THE OLD/VOIDED SHEETS
 FROM SETS AND ONLY INSERT THE NEW
 REVISED SHEETS INTO COMPLETE SETS FOR
 REVIEW AND STAMPING.
 THIS WILL HELP TO AVOID ANY DELAYS IN
 PROCESSING PROJECT.
 ** ONE COPY OF ANY OLD/VOIDED REMOVED
 SHEETS SHOULD BE SUBMITTED SEPARATELY
 FOR REFERENCE.
  
 2) NOTE:NO, PLEASE SEE LOADS SHALL BE FIGURED FOR ONE
 OR MORE. PLEASE SEE TWO SM APPL CIRCUITS ARE REQUIRED
 FOR MIN, HOWEVER PLEASE SEE CODES GIVEN FOR OTHERS.
  
 ** PREVIOUS REVIEW NOTE **
 PLEASE SEE CIRCUITING FOR
 BUTLERS PANTRY IS SHOWN ALSO FEEDING
 OUTSIDE GFI(S).
 PLEASE SEE 210.52B1 WHICH SPEAKS OF
 KITCHEN SM APPL AND AREAS OF THE LIKE.
 BUTLERS PANTRY SHALL BE CIRCUITED TO ONE
 OR MORE OF THE SMALL APPLICANCE
 CIRCUITS.
 LOADS SHALL BE FIGURED AT 1.5KW PER CIR.
 PLEASE ALSO OTHER CIRCUITS IN KITCHEN
 WHICH AARE NOT BEING SHOWN WITH LOADS
 ETC AT 1.5, VA OR ON ON ONE OR MORE OF
 THE SM APPL CIRCUITS.
 PLEASE KNOW, ALL CIRCUITS ABOVE THE TWO
 MIN SM APPL, SHALL ALL BE FIGURED AND
 SHOWN AT 1.5KW FOR EACH. IE; 4-CIRCUITS,
 6KW.
 210.11C1,210.52B1,220.16
  
 3) NOTE:OK.
  
 4) NOTE: OK.
  
 5) NOTE: OK.
  
 6) NOTE: OK, HOWEVER SEE NEW NOTE WITH RESPECT TO SD'S
 AND SA'S
  
 7) NOTE: OK, NO ELECTRICAL SHOWN, IF THIS NEEDED, THESE
 ITEMS WILL BE REQUIRED TO BE REVISED AT A LATER DATE.
 PLEAS KNOW, MAY GAS APPLIANCES ARE REQUIRED TO HAVE AN
 ELECTRICAL FEED OF SOME KIND FOR ELECTRONICS ETC. THIS
 IS NOT ANYTHIGN THAT NEEDS TO BE CORRECTED ON PLANS.
  
 8) NOTE: NO, PLEASE SEE LOAD CALCULATIONS STILL DO NOT
 INCLUDE ALL LOADS FOR DEDICATED EQUIPMENT. PLEASE SEE
 LOADS ON PANELS "B" AND "C" STILL DO NOT CORRELATE WITH
 PANEL "A". PLEASE SEE THERE ARE MANY IEMS WHICH ARE
 DEDICATED LAODS NOT FIGURED.
 PLEASE SEE NEC 220.31 AND SHOW ALL LOADS.
  
 ** PREVIOUS REVIEW NOTE **
 PLEASE SEE LOAD CALCULATIONS
 SHALL INCLUDE ALL LOADS ON PANEL "B" AND
 "C". PLEASE SEE LOADS SHOWN FOR PANEL
 "C" IS ONLY SHOWN AT 5.9KW, YET THE
 LOADS ON PANEL "C" WAY EXCEED THIS.
 PLEASE SHOW LOADS ON EACH PANEL, AND
 INDICATE INDICATE THIS BREAK DOWN FOR
 EACH IN LOAD CALCUALTIONS.
 215.5, 220
  
 9) NOTE: NO, PLEASE SEE THERE ARE STILL SOME MISSING AS
 REQUIRED PER 210.52
  
  
 ** PREVIOUS REVIEW NOTE **
 PLEASE SEE MISSING RECEPTS PER
 210.52 MANY OF THESE ARE REDLINED ON ONE
 OF THE SETS OF PLANS.
 PLEASE SEE 3RD FLR, IF THIS AREA IS
 ENCLOSED, RECEPTS WILL BE REQUIRED.
 PLEASE ALSO SEE BUILDING COMMENTS IF 3
 FLRS OF HABITABLE SPACE.
  
 10) NOTE: OK.
  
 11) NOTE: OK.
  
 12) NOTE: NO, PLEASE SEE GUEST RM, MISSING DESIGNATION
 ON ELECTRICAL PLANS, AND CIRCUITING FOR RECETPS.
  
 ** PREVIOUS REVIEW NOTE **
 PLEASE SEE 408.4 WHERE THE
 PANEL SCHEDULE SHALL BE SPECIFIC FOR
 ROOMS AND ALL AREAS. MOST ARE DONE.
 IE: BEDRM #3 RECEPTS , LIV RM LTS ETC
 ** IT IS KNOWN, THAT DURING CONSTRUCTION
 THESE CIRCUITS MAY CHANGE AND CAN BE
 REVISED AT A LATER DATE.
 PLEASE SEE SOME ARE ONLY SHOWN AS GFI,
 ETC. WHEREAS THE SM APPL CIRCUITS ETC
 SHALL BE SPECIFIC.
  
 13) NOTE: OK.
  
 14) NOTE: OK.
  
 15) NOTE:NO, PLEASE SEE NOT ALL CIRCUITS WHICH
 REQUIRE AFCI PROTECTION ARE SHOWN THIS WAY. PLEASE SEE
 A-31AND VERIFY ALL OTHERS.
  
 ** PREVIOUS REVIEW NOTE **
 PLEASE SEE ARC FAULT
 PROTECTION IS REQUIRED FOR ALL CIRCUITS
 IN BEDRMS , NOT ONLY RECEPTS. THIS
 REQUIREMRNT WAS CHANGED FROM THE 1999
 NEC. THE 2002 NEC 210.12B REQUIRES ALL
 "OUTLETS" TO BE PROTECTED ON THAT BRANCH
 CIRCUIT. THIS INCLUDES, LTS, RECEPTS,
 SD'S, FANS ETC.
  
 16)NOTE: OK, HOWEVER WITH THE AIC RATING BEING SHOWN
 AT 10K, PLEASE KNOW IF THE LOCATION CONTAINS AN OLDER
 TRANSFORMER, IT IS KNOWN TO THIS OFFICE THAT MANY OF
 THE OLDER TRANSFORMER ARE BEING CHNAGED OUT AND SOME
 CONSIDERATION FOR FUTURE KVA SIZE SHOULD BE GIVE. THIS
 IS ONLY NOTED.
  
 ** PREVIOUS REVIEW NOTE **
 PLEASE SUBMIT AIC RATINGS FOR
 ALL NEW SERVICE EQUIPMENT BEING INSTALL-
 ED. MAINS/BRKRS AND PANELS ARE ALL TO BE
 RATED FOR THE AVAILABLE FAULT CURRENT.
 PER 110.9/215.5
  
 17) NOTE: OK.
  
 18) NOTE:NO, PLEASE SEE MISSING REQUIRED FOOTER
 STEEL. SHOWS OTHERS, HOWEVER THE FOOTER STEEL IS
 REQUIRED.
  
 ** PREVIOUS REVIEW NOTE **
 PLEASE SEE 250.50 FOR MIN
 GROUNDING ELECTRODE SYSTEM AT MAIN
 HOUSE. NEW FOOTER STEEL, CWP, GRND ROD
 WILL BE REQUIRED.
  
 19) NOTE:OK.
  
 20) NOTE:NO, AS NOTED ABOVE. PLEASE SEE SOME AREAS
 ARE MISSING SOME CIRCUITING. SEE REDLINED (GUEST RM).
 AND OTHER POSSIBLE LOCATIONS.
 NOT ALL AREAS AS REDLINED
  
 ** PREVIOUS REVIEW NOTE **
 PLEASE SEE SOME ITEMS/RECEPTS
 ARE MISSING CIRCUITING ON PLANS. THESE
 ARE MINOR AND HAVE BEEN REDLINED, ALONG
 WITH SD'S.
 FBC ADMIN SECT 106.1.2
  
 21) NOTE:NO, PLEASE SEE NOTE #2 ABOVE. PLEASE SEE
 LOADS, ECT REQUIRED.
  
 ** PREVIOUS REVIEW NOTE **
 PLEASE SEE THE DINING RM
 RECEPTS SHALL BE EITHER ON ONE OR MORE
 OF THE REQUIRED DEDICATED SMA PPL
 CIRCUITS OR ON THEIR OWN. 210.11C1,220.16,210.52B1
  
 22) NOTE: OK.
  
 23) NOTE: OK.
  
 24) NOTE: OK, HOWEVER PLEASE SEE BOTH GDO'S (GARAGE
 DOOR OPENERS) ARE BEING SHOWN ON ONE CIRCUIT WITH A
 LOAD OF 900A FOR BOTH. PLEASE VERIFY THIS AS THE
 TYPICAL SIZE OF A GDO IS LARGE ENOUGH WHERE EACH
 REQUIRES A DEDICATED CIRCUIT. PLEASE SEE 430.148 AND
 VERIFY AS THIS WOULD BE THE TIME TO REVISE IF NEEDED.
 PLEASE ALSO REVISED CALCULATIONS IF NEEDED.
  
 ** PREVIOUS REVIEW NOTE **
 PLEASE CLARIFY GDO AS THESE
 LOCATIONS ARE SHOWING "J" BOXES AND NOT
 RECEPTS. PLEASE KNOW, IF THE GDO'S ARE
 PLUG-IN TYPE, THEN RECEPTS SHOULD BE
 SHOWN.
 106.1.2
  
 *** NEW NOTE ***
  
 25) NOTE: PLEASE SEE NFPA-72 2002 DEFINITIONS OF SMOKE
 DETECTORS AND SMOKE ALARMS. PLEASE ADJUST SYMBOL
 DESIGNATIONS ON PLANS IF THESE ARE INDEED NOT ONLY
 DETECTION DEVICES ARE NOTPART OF A FA SYSTEM/SECURITY
 SYSTEM. IF THESE ARE DEVICES WHICH DETECT AND SOUND
 THESE ARE CONSIDERED SA'S SMOKE ALARMS. PLEASE KNOW THE
 CLARIFICATION FROM NFPA AND THE CODE PANELIST WAS GIVEN
 RECENTLY SINCE THE LAST REVIEW.
 PLEASE ADJUST PLANS.
  
  
 ** PLEASE KNOW,MANY OF THE ABOVE ITEMS
 ARE REDLINED ON ONE OF THE SETS OF
 PLANS, HOWEVER IS IN NO WAY ALL
 LOCATIONS AS NOTED ABOVE.
  
 ** PLEASE SUBMIT THE ABOVE FOR REVIEW
 AND IF THERE ARE ANY QUESTIONS OR
 COMMENTS, PLEASE DO NOT HESITATE IN
 CONTACTING THIS OFFICE.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-805-6717
 [email protected]
  
  
  
2006-10-24 10:42:39RECEIVED FROM"INCOMING" ON 10/24/06, PLANS WERE NOT
 ROUTED ON 10/6 TO ELECTRICAL.