| Plan Review Notes For Permit 06061238 |
| Permit Number |
06061238 |
|
| Review Stop |
E |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2006-07-05 00:00:00 | | | | | | | 1} THE VALUE ON THE APPLICATION MUST | | | INCLUDE THE COST OF LABOR AND MATERIAL | | | FOR THE INSTALLATION OF ALL COMPONENTS | | | UNDER THE COPE OF THIS PERMIT. FBC | | | 108.3. | | | | | | 2} IF ALL DISCONNECTS CANNOT BE | | | GROUPED PER 230.72, SEE THAT ALL | | | ARTICLES FROM 225.31 THROUGH 225.39, ARE | | | COMPLIED WITH. | | | | | | 3}702.5 CAPACITY AND RATING.AN | | | OPTIONAL STANDBY SYSTEM SHALL HAVE | | | ADEQUATE CAPACITY AND RATING FOR THE | | | SUPPLY OF ALL EQUIPMENT INTENDED TO BE | | | OPERATED AT ONE TIME. PROVIDE A LOAD | | | CALCULATION SHOWING COMPLIANCE WITH THIS | | | ARTICLE. | | | | | | 4} 700.15 LOADS ON EMERGENCY BRANCH | | | CIRCUITS. | | | NO APPLIANCES AND NO LAMPS, OTHER THAN | | | THOSE SPECIFIED AS REQUIRED FOR | | | EMERGENCY USE, SHALL BE SUPPLIED BY | | | EMERGENCY LIGHTING CIRCUITS. PROVIDE A | | | PANEL SCHEDULE FOR THE | | | EMERGENCY/GENERATOR PANEL. | | | | | | 5} INDICATE HOW THE TRANSFER SWITCH IS | | | FED FROM THE PANEL.THERE MUST BE A | | | MAIN IN THIS PANEL OR OCP IN THE MAIN | | | PANEL. SEE 230.72. | | | | | | BILL TROBAUGH | | | ELECTRICAL PLAN REVIEW | | | 561/805-6718 | | | [email protected] | | | | | | | | | |
|