| 2006-09-01 00:00:00 | ******DENIED 3RD TIME****** |
| | REFERENCE: FBC-2004 FUEL GAS |
| | |
| | THE FOLLOWING INFORMATION IS STILL |
| | REQUIRED FOR GAS PLAN REVIEW: |
| | |
| | 1. SHOW TYPE OF PIPING MATERIAL BEING |
| | INSTALLED, ALL PIPE SIZES, (AND THE EDH |
| | NUMBER OF CORRUGATED STAINLESS STEEL |
| | TUBING FOR EACH PIPE SIZE BEING USED. |
| | 2. BTU LOAD OF EACH APPLIANCE AND THE |
| | TOTAL BTU LOAD ON THE SYSTEM. REFER TO |
| | THE FBC-2004 FUEL GAS CODE SECS. 401.8 |
| | THRU 402.6.1 AND TABLES 402.4(1) THRU |
| | 402.4(33). NOTE: THIS INCLUDES THE |
| | EXISTING BTU LOAD, PLEASE INDICATE THE |
| | EXISTING BTU LOAD AS WELL AS THE NEW BTU |
| | LOAD ON THE DRAWING. |
| | 3. SHOW THE DISTANCE FROM THE POINT OF |
| | DELIVERY, (METER), TO THE MOST REMOTE |
| | OUTLET IN THE BUILDING AND/OR SYSTEM PER |
| | FBC-2004 FUEL GAS CODE APPENDIX A - USE |
| | OF CAPACITY TABLES A.3.1(4). NOTE: THIS |
| | INCLUDES THE EXISTING SYSTEM AS WELL AS |
| | THE NEW PROPOSED SYSTEM TO THE |
| | GENERATOR. |
| | 4. INDICATE THE DELIVERY PRESSURE (PSI) |
| | PER FBC-2004 FUEL GAS CODE SEC. 402.2. |
| | NATURAL GAS SPECIFY .5 PSI OR 2 PSI. |
| | 5. NOTE: PLEASE SEE A 4X FEE FOR THE |
| | PLAN REVIEW PORTION OF THE PERMIT FEE |
| | HAS NOW BEEN ASSESSED AS REQUIRED PER FS |
| | 553.80(2)(B). |
| | 6. NOTE: PLEASE KNOW THE GAS PERMIT |
| | APPLICATION WAS NOT IN THE PACKAGE. |
| | PLEASE BE SURE THE APPLICATION IS |
| | BROUGHT BACK IN. |
| | |
| | **IN ORDER TO EXPIDITE PLAN REVIEW: WHEN |
| | RESUBMITTING, PLEASE REPLACE ONLY SHEETS |
| | WHICH HAVE CHANGED AND PROVIDE ONE COPY |
| | OF ALL OLD/VOIDED SHEETS FOR REFERENCE |
| | ONLY. NOTE: ONLY ONE CORRECTED DRAWING |
| | IN RED INK FOR REFERENCE FOR |
| | RESUBMITTAL. |
| | |
| | END OF COMMENTS: |
| | |
| | REVIEW BY MIKE PERSON |
| | (561) 805-6730 |
| | FAX (561) 805-6731 |
| | E-MAIL [email protected] |
| | UNDER SUPERVISION OF K.STEVENS |
| | (561) 805-6721 |
| | |
| | |
| | |
| | |
| | |
| | |