| Date |
Text |
| 2006-06-27 00:00:00 | ******DENIED****** |
| | REFERENCE: FBC-2004 FUEL GAS |
| | FBC-2004 CHAPTER 1 |
| | |
| | THE FOLLOWING INFORMATION IS REQUIRED |
| | FOR PLAN REVIEW FOR A GAS PERMIT: |
| | |
| | 1. SUBMIT AN ISOMETRIC DRAWING THAT |
| | CLEARLY SHOWS ALL CUT SECTIONS OF PIPE |
| | AND CORRESPONDING LENGTHS PER FBC-2004 |
| | FUEL GAS CODE. PLEASE SEE SAMPLE OF |
| | ISOMETRIC DRAWING IN RED INK FOR |
| | REFERENCE FOR RESUBMITTAL. |
| | 2. SHOW TYPE OF PIPING MATERIAL BEING |
| | INSTALLED, ALL PIPE SIZES, (AND THE EDH |
| | NUMBER OF CORRUGATED STAINLESS STEEL |
| | TUBING FOR EACH PIPE SIZE BEING USED. |
| | PLEASE SEE SAMPLE ISOMETRIC DRAWING IN |
| | RED INK FOR REFERENCE OF THE ABOVE. |
| | 3. TYPE OF GAS, (LP OR NATURAL) PLEASE |
| | INDICATE THIS ON DRAWINGS. |
| | 4. SHOW THE DISTANCE FROM THE POINT OF |
| | DELIVERY, (METER), TO THE MOST REMOTE |
| | OUTLET IN THE BUILDING AND/OR SYSTEM PER |
| | FBC-2004 FUEL GAS CODE APPENDIX A - USE |
| | OF CAPACITY TABLES A.3.1(4). |
| | 5. INDICATE THE DELIVERY PRESSURE (PSI) |
| | PER FBC-2004 FUEL GAS CODE SEC. 402.2. |
| | NATURAL GAS SPECIFY .5 PSI OR 2 PSI. |
| | 6. IF GAS SYSTEM IS A 2LB SYSTEM PLEASE |
| | SUBMIT MANUFACTURE SHEETS FOR ALL GAS |
| | EQUIPMENT(REGULATORS) TO VERIFY |
| | COMPLIANCE WITH STANDARDS NFPA 54, NFPA |
| | 58, AND THE FBC-2004 FUEL GAS CODE SEC |
| | 402.2. |
| | 7. PER FBC-2004, CHAPTER 1 SECTION 106. |
| | THE PERSON RESPOSIBLE FOR THE DRAWING |
| | SHALL PRINT AND SIGN NAME, AND DATE |
| | DRAWING. |
| | |
| | **IN ORDER TO EXPIDITE PLAN REVIEW: WHEN |
| | RESUBMITTING, PLEASE REPLACE ONLY SHEETS |
| | WHICH HAVE CHANGED, AND PROVIDE ONE COPY |
| | OF ALL OLD/VOIDED SHEETS FOR REFERENCE |
| | ONLY. |
| | |
| | END OF COMMENTS: |
| | |
| | REVIEW BY MIKE PERSON |
| | (561) 805-6730 |
| | FAX (561) 805-6731 |
| | E-MAIL [email protected] |
| | UNDER SUPERVISION OF K.STEVENS |
| | (561) 805-6721 |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |