| Date |
Text |
| 2007-01-13 17:29:32 | ** UNSAT 3RD REVIEW** |
| | |
| | |
| | ** PLEASE SEE COMMENTS BELOW ARE BASED ON THE REVISED |
| | PLANS SUBMITTED. |
| | ** PLEASE SEE AS REQUESTED ON THE PREVIOUS REVIEW, NO |
| | PREVIOUS REVIEWED ORIGINAL PLANS WERE SUBMITTED FOR |
| | REFERENCE. PLEASE SUBMIT ONE SET OF EACH OF THE |
| | PREVIOUS PLANS. |
| | |
| | 1) NOTE:PLEASE SUBMIT TWO SETS OF PLANS WITH ALL |
| | SHEETS PLACED INTO SETS AND SHEETS ATTACHED. |
| | PLEASE SEE MORE THAN TWO SETS OF MANUFACTURES SPEC/CUT |
| | SHEETS WERE SUBMITTED AND EACH OF THESE CONTAIN |
| | DIFFERENT SHEETS. PLEASE SUBMIT ONLY THE TWO SETS NEED |
| | FOR REVIEW OF SAID SHEETS. |
| | 106.1.2, 106.1. |
| | |
| | ***PLEASE SEE COORDINATION BETWEEN THE RISER, LOADS AND |
| | PANELS NEED TO BE ADDRESSED. |
| | THE COMMENTS BELOW ARE BEING NOTED, HOWEVER DUE TO THE |
| | NEW REVISED RISER AND THE AMOUNT OF NEEDED CHANGES |
| | THERE MAY BE NEW COMMENTS ON THE NEXT REVIEW. |
| | |
| | 2) NOTE: |
| | A) PLEASE SEE MDP2-8 SHOWS A 400A BREAKER FEEDING WHAT |
| | IS LABELED ATS-EQ. |
| | PLEASE SEE THE LOAD ON THIS IS BEING SHOWN AS |
| | 34.7/35.1/34.5 WHICH IS THE LOAD SHOWN ON PANEL HEQ. |
| | B) PLEASE SEE HOWEVER RISER IS NOW SHOWING THE MDP3 |
| | BEING FED FROM THE ATS-EQ NOW WITH OUT ANY LOAD |
| | CONSIDERATION BEING SHOWN. PLEASE SEE THE LOAD ALONE |
| | BEING SHOWN ON MDP3 IS 416.7 KVA WHICH IS NOT ON MDP2 |
| | OR IN THE GENERATOR LOAD SUMMARY. |
| | PLEASE CORRELATE THE GENERATOR LOAD SUMMARY WITH ALL |
| | LOADS. |
| | C) PLEASE SEE THE RISER NOW SHOWS A 175AMP DISCONNECT |
| | BEING INSTALLED FROM THE ATS EQ TO THE MDP3? HOW IS IT |
| | POSSIBLE FOR THIS TO BE 175AMPS WHEN THE LOAD UNDER |
| | NORMAL EXCEEDS THAT OF THIS EQUIPMENT? PLEASE SEE THE |
| | NOTE ABOVE AS ONCE AGAIN, NO LOADS FOR THE MDP3 IS |
| | BEING SHOWN AS PART OF THE LOAD ON THE GENERATOR, YET |
| | IT IS BEING SHOWN CONNECTED TO THIS SYSTEM. |
| | D) PLEASE CLEAR UP RISER AND WHETHER OR NOT THE MDP3 IS |
| | FED FROM THE SAME BREAKER THAT IS BEING SHOWN FOR |
| | ATS-EQ AND HEQ. IF THE HEQ IS FED FROM THE 400A BREAKER |
| | ON MDP2 THIS IS FINE HOWEVER THE ADDITION OF THE NEW |
| | MDP3 HAS CREATED AN ENTIRE NEW LIST OF COMMENTS. |
| | E) PLEASE SEE BASED ON THE ADDITION OF MDP3 ON THE |
| | RISER, THE FEEDERS BEING SHOWN AS ATS-2 AND ATS-3 ARE |
| | NOT SUFFICIENT UNDER NORMAL OR LOADS UNDER EMERGENCY. |
| | HOW CAN THE NORMAL SIDE OR THE EMERGENCY SIDE INDICATE |
| | CONDUCTORS LESS THAN THE LOAD AS SHOWN? |
| | |
| | 240.4, 310.16, 230.70, 220, 240.21, 215.5, 215.3, |
| | 230.42, 230.79, 225.39 ETC. |
| | PLEASE KNOW THERE ARE NUMEROUS SECTIONS WHICH COULD BE |
| | NOTED.2002 NEC |
| | PLEASE REVISE RISER AND COORDINATE ALL. |
| | |
| | ** ** IMPORTANT** |
| | ONCE ALL REVIEWS ARE DONE AND PLANS ARE |
| | PICKED UP FOR CORRECTIONS, PLEASE BE |
| | SURE TO COMPLETELY REMOVE ALL OLD/VOIDED |
| | SHEETS AND ONLY INSERT NEW REVISED |
| | SHEETS INTO TWO COMPLETE SETS FOR REVIEW |
| | AND STAMPING. DO NOT LEAVE ANY |
| | OLD/VOIDED SHEETS IN SETS. |
| | PLEASE KNOW ONLY ONE SET OF THE |
| | OLD/VOIDED SHEETS SHOULD BE SUBMITTED |
| | FOR REFERENCE. |
| | THIS WILL HELP IN THE REVIEW PROCESS AND |
| | AVOID ANY DELAYS. |
| | |
| | ** PLEASE BE SURE TO CALL IF THERE ARE ANY QUESTIONS OR |
| | COMMENTS WITH RESPECT TO THE TYPED COMMENTS ABOVE. IF |
| | THERE ARE ANY COMMENTS WHICH ARE NOT CLEAR IN ANY WAY, |
| | NOT UNDERSTOOD OR NOT TYPED IN A CLEAR MANOR, PLEASE DO |
| | NOT HESITATE IN CONTACTING THIS OFFICE AND THIS |
| | REVIEWER. |
| | |
| | |
| | DEWEY PALMER |
| | ELECTRICAL PLAN REVIEW |
| | CONSTRUCTION SERVICES DEPT. |
| | CITY OF WEST PALM BEACH |
| | 561-805-6717 |
| | [email protected] |