2006-07-29 00:00:00PAUL SCHMITZ
 [email protected]
 FBC 2004 PLUMBING CODE PLAN REVIEW
 FBC2004 FUEL GAS CODEPLAN REVIEW
 FBC 2004 CH 11, FL ACESSIBILITY CODE
 AMENDMENTS TO THE FLORIDA BUILDING CODE
  
 CHAPT.1, ADMINISTRATION, 2004 EDITION
  
  
 UNSAT
  
 1)PLANS SHALL BE ROUTED TO DBPR
 BUSINESS AND HOTEL DIVISION FOR
 REVIEW. MINIMUM 2 SETS OF PLANS
 SHALL BE REVIEWED AND STAMPED
 AND THE TWO PAGE ?WORKSHEETS?
 ATTACHED TO EACH SET OF PLANS
 PRIOR TO RESUBMITTING TO CITY OF WEST
 PALM BEACH
 FOR REVIEW. PLEASE CONTACT DBPR
 AT (850) 487-1395.
  
 2)SEE OTHER PLAN REVIEW COMMENTS, THAT
 MAY EFFECT PLUMBING PLAN REVIEW.
  
 3) SHT P1.1 GREASE TRAPS: REFERENCE TO
 DWG P-3 FOR CALCULATION SIZE OF GREASE
 TRAPS. NOT INCLUDED IN THIS SET, AND NOT
 LISTED IN PLUMBING DRAWING INDEX.
 CONTACT W P BEACHWATERPLANT LAB
 SUPERVISOR,INDUSTRIAL COORDINATOR.
 LYNN MASSON."GREASE TRAP SIZE"
  
 OFFICE 561-822-2271
 E-MAIL [email protected]
  
 4)SHT P3.1 WATER PIPING ISOMETRIC:
 SEC 604.9 WATER HAMMER ARRESTORS, SHALL
 BE INSTALLED AS CLOSE TO POINT OF USE AS
 POSSIBLE. NOT AS AIR CHAMBERS.
  
 5) SHT P3.1 WATER SERVICE: SHOW THE
 LOCATION OF THE BACK FLOW PREVENTER.
  
 6) SHT P3.1 A/C CONDENSATE: TERMINATE AT
 LEAST 12" FROM BUILDING IN A PLANTER,
 DRY WELL, OR STORM DRAIN.
 6) SHT A3.1 ROOF DRAINAGE:SEC 1101.7
 1101.2 WHERE REQUIRED.
 ALL ROOFS, PAVED AREAS, YARDS, COURTS
 AND COURTYARDS SHALL DRAIN INTO A
 SEPARATE STORM SEWER SYSTEM. OR TO AN
 APPROVED PLACE OF DISPOSAL. SEC.1107
 SECTION 1107
 SECONDARY (EMERGENCY) ROOF DRAINS
 1107.1 SECONDARY DRAINAGE REQUIRED.
 SECONDARY (EMERGENCY) ROOF DRAINS OR
 SCUPPERS SHALL BE PROVIDED WHERE THE
 ROOF PERIMETER CONSTRUCTION EXTENDS
 ABOVE THE ROOF IN SUCH A MANNER THAT
 WATER WILL BE ENTRAPPED IF THE PRIMARY
 DRAINS ALLOW BUILDUP FOR ANY REASON.
 1107.2 SEPARATE SYSTEMS REQUIRED.
 SECONDARY ROOF DRAIN SYSTEMS SHALL HAVE
 THE END POINT OF DISCHARGE SEPARATE FROM
 THE PRIMARY SYSTEM. DISCHARGE SHALL BE
 ABOVE GRADE, IN A LOCATION WHICH WOULD
 NORMALLY BE OBSERVED BY THE BUILDING
 OCCUPANTS OR MAINTENANCE PERSONNEL.
 1107.3 SIZING OF SECONDARY DRAINS.
 SECONDARY (EMERGENCY) ROOF DRAIN SYSTEMS
 SHALL BE SIZED IN ACCORDANCE WITH
 SECTION 1106 BASED ON THE RAINFALL RATE
 FOR WHICH THE PRIMARY SYSTEM IS SIZED IN
 TABLES 1106.2, 1106.3 AND 1106.6.
 SCUPPERS SHALL BE SIZED TO PREVENT THE
 DEPTH OF PONDING WATER FROM EXCEEDING
 THAT FOR WHICH THE ROOF WAS DESIGNED AS
 DETERMINED BY SECTION 1101.7. SCUPPERS
 SHALL NOT HAVE AN OPENING DIMENSION OF
 LESS THAN 4 INCHES (102 MM). THE FLOW
 THROUGH THE PRIMARY SYSTEM SHALL NOT BE
 CONSIDERED WHEN SIZING THE SECONDARY
 ROOF DRAIN SYSTEM
 7) SEPERATE PERMITS FOR DEMOLITION,
 PLUMBING, GAS PIPING.
 8) DISCRIPTION OF WORK ON COVER SHT T1.0
 STATES THIS IS HURRICANE DAMAGE REPAIR
 WORK. THIS IS A ALTERATION. PLEASE
 REVISE SHT. T1.0 TO REFLECT THE SCOPE OF
 WORK IN THIS SET OF PLANS.
  
 END OF COMMENTS,QUESTIONS 561-805-6692


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved