| 2006-09-24 00:00:00 | ** UNSAT 2ND REVIEW ** |
| | |
| | PLEASE SEE NOTES FROM PREVIOUS REVIEW |
| | THEY ARE SHOWN BELOW WHICH ARE TAKEN |
| | DIRECTLY FROM PREVIOUS REVIEW. |
| | |
| | 1) NOTE: OK. |
| | |
| | 2) NOTE:NO, PLEASE PROVIDE WORST CASE |
| | ON RECORD SET OF PLANS. IT IS NOTED THAT |
| | THIS WAS RESPONDED TO IN LTR. |
| | |
| | ** PREVIOUS REVIEW NOTE ** |
| | PLEASE SEE FBC 2004, |
| | 13-413.1ABC.1 FOR MIN WORST CASE VOLTAGE |
| | DROP SCENERIO TO BE PROVIDED. |
| | |
| | 3) NOTE: NO, PLEASE KNOW, THIS COMMENT |
| | WAS DOE LIGHT POLES WHICH WAS IN COMMENT |
| | ABOVE. IT IS KNOWN, THAT THIS IS A STATE |
| | APPROVED TRAILER, AND THE COMMENT WAS |
| | NOT INTENDED FOR THE WIND LOADS OF THE |
| | TRAILERS FROM ELECTRICAL REVIEW. |
| | |
| | ** PREVIOUS REVIEW NOTE ** |
| | PLEASE PROVIDE WIND LOAD |
| | CALCULATIONS AT THIS TIME. PLANS |
| | CURRENTLY MENTION THIS IS TO BE |
| | PROVIDEDS, HOWEVER THIS IS REQUIRED AT |
| | THIS TIME. |
| | |
| | 4) NOTE:NO,, NOT CLEAR, IS ALL THE |
| | PROPOSED SITE LIGHTING WORK GOING TO BE |
| | UNDER THIS PERMIT ALSO, OR IS THIS ONLY |
| | FOR THE TEMP SALES CENTER? |
| | |
| | ** PREVIOUS REVIEW NOTE ** |
| | ** THIS IS NOT A KAMM CONSULTING |
| | COMMENT* |
| | PLEASE SEE THAT THE VALUE SET FORTH ON |
| | THE PERMIT APPLICATION AND SCOPE OF WORK |
| | APPLIED FOR DOES NOT SEEMTO INCLUDE |
| | ALL SITE, SITE LIGHTING, POLES FIXTURES |
| | AND NEW SALES FACILITY. |
| | IF ALL THE WORK AS SHOWN SUBMITTED ON |
| | PLANS IS IN SCOPE (EXCLUDING FUTURE |
| | BLDGS) THEN PLEASE ADJUST VALUE. |
| | PLEASE KNOW, IF THE SITE POLE |
| | CALCULATIONS ARE NOT SUBMITTED AT THIS |
| | TIME, THEN THE SITE LIGHTING WILL BE |
| | REQUIRED TO BE UNDER A SEPARATE PERMIT |
| | WITH PLANS AND FEES ATTHAT TIME. |
| | FBC ADMINISTRATIVE SECTION 108.3, AS |
| | ADOPTED BY THE CITY OF WEST PALM BEACH. |
| | |
| | 5) NOTE: OK. |
| | |
| | 6) NOTE: OK, EQUIPMENT TO BE VERIFIED |
| | FOR VOLTAGES AS NOTED. |
| | |
| | 7) NOTE: ?? PLEASE SEE PREVIOUS NOTES ON |
| | PLANS MENTIONED, NEUTRAL IS NOT TO BE |
| | BONDED AT TRAILERS, THEREFORE GRND RODS |
| | WOULD BE REQUIRED WHICH IS WHAT THE |
| | PREVIOUS COMMENT WAS. PLEASE SEE NOW |
| | PLANS STILL DO NOT SHOW ANY GROUNDING AT |
| | THE TRAILERS, AND A NOTE HAS BEEN ADDED |
| | TO "BOND" NEUTRAL TO THE EQUIPMENT |
| | GROUNDIGN CONDUCTOR. PLEASE KNOW, IF |
| | THIS IS DONE THIS WOULD PARALLEL THE |
| | NEUTRAL WHICH CREATES OBJECTIONABLE |
| | CURRENT (250.6). PLEASE PROVIDE THE GRND |
| | RODS AND CWP(IF METAL) AND AS NOTED ANY |
| | OTHER METAL PIPING AT THE TRAILERS. |
| | PLEASE REMOVE NOTE #7 AS ANY METAL |
| | CURRENT CARRYING PARTS FROM TO THE |
| | TRAILERS MAY BE PRESENT. THIS CAN BE IN |
| | SUCH OF TELEPHONE/CATV ETC). |
| | 250.32, 250.6 |
| | |
| | **PREVIOUS REVIEW NOTE ** |
| | PLEASE PROVIDE GROUNDING AT |
| | TRAILERS AND HOW THESE WILL BE GROUNDED. |
| | IT SEEMS TO BE SHOWN ON RISER ,HOWEVER |
| | NO |
| | CONDUCTORS OR GRND RODS ARE SHOWN AT |
| | TRAILERS?? |
| | *IT WAS NOTED THAT THE NEUTRAL SHOULD |
| | NTO BE BONDED AT THE TRAILER. |
| | 250.50,550.16 |
| | |
| | 8) NOTE: OK, AS NOTED HOWEVER PLEASE SEE |
| | NOTE BAOVE. |
| | |
| | ** PREVIOUS REVIEW NOTE ** |
| | PLEASE INDICATE IF ANY (METAL ) |
| | CWP TO BE BONDED. PLEASE SEE PLUMB RISER |
| | WHICH SEEMS TO INDICATE THIS WHICH WILL |
| | BE REQUIRED. |
| | PLEASE ALSO KNOW, IF THE TRAILERS BECOME |
| | REQUIRED TO CONTAIN FIRE SPRINKLERS, |
| | THEN THIS LINE WOULD ALSO BE BONDED. |
| | 250.50,250.104 |
| | |
| | 9) NOTE: OK, PLEASE BE SURE TO DO THE |
| | SAME ON THE NEXT REVISED SHEETS. |
| | THANK YOU. |
| | |
| | 10) NOTE:NO, SAME NOTE, YES, THESE ARE |
| | STATE APPROVED TRAILERS, HOWEVER ALL |
| | STATE APPROVED TRAILERS REVIEWED BY THIS |
| | OFFICE CONTAING THE CIRCUITING WHICH |
| | CORRELATES TO THE PANEL SCHEDLULES. |
| | PLEASE SEE IF THESE PLANS ARE NOT |
| | AVAILABLE AS MOST ARE. |
| | PLEASE KNOW, IT IS MOST IMPORTANT, THAT |
| | THE WIRING FOR THE EM/ EXT LTS IS DONE |
| | PER 700.12E. IF THE NORMAL LIGHTING GOES |
| | OUT THE EM/ EXT LTS ARE WIRED AHEAD OF |
| | THE NORMAL LIGHTING IN ANY ONE AREA. THE |
| | TRIPPING OF ANY SINGLE OCP DEVICE, SITCH |
| | ETC SHOULD NOT LEAVE IN ONE AREA IN |
| | TOTAL DARKNESS. |
| | NFPA-101, 7.9.2.2 |
| | |
| | ** PREVIOUS REVIEW NOTE ** |
| | PLEASE SEE THAT THE PLANS FOR |
| | THE TRAILER SHALL INCLUDE ALL CIRCUITING |
| | AND CORRELATE WITH PANEL SCHEDULES TO BE |
| | SUBMITTED. |
| | PLEASE SEE 700.12E FOR THE CIRCUITING |
| | THE EM/EXT LTS ON A LOCAL LIGHTING |
| | BRANCH CIRCUIT. |
| | |
| | 11) NOTE: OK. |
| | |
| | ** NEW NOTE ** |
| | |
| | 12) NOTE: PLEASE BE SURE THAT THE CODES |
| | AND EDITIONS ARE REFLECTED ON E0.1. |
| | NFPA-70 2002, NFPA-72 2002 , NFPA-101 |
| | 2003. |
| | |
| | 13) NOTE: PLEASE SEE THE ADDRESS OF 2101 |
| | OKEECHOBEE BLVD IS ASSIGNED TO THIS |
| | PROJECT, PLEASE ADJUST AND PLACE ON ALL |
| | TITLE BLOCKS AND PLANS. |
| | FAC 61G1-16.004,61G15-23.002 |
| | |
| | ** IMPORTANT** |
| | OLD SHEETS WERE LEFT IN SETS. |
| | |
| | ONCE ALL REVIEWS ARE DONE AND PLANS ARE |
| | PICKED UP FOR CORRECTIONS, PLEASE BE |
| | SURE TO COMPLETELY REMOVE ALL OLD/VOIDED |
| | SHEETS AND ONLY INSERT NEW REVISED |
| | SHEETS INTO TWO COMPLETE SETS FOR REVIEW |
| | AND STAMPING. DO NOT LEAVE ANY |
| | OLD/VOIDED SHEETS IN SETS. |
| | PLEASE KNOW ONLY ONE SET OF THE |
| | OLD/VOIDED SHEETS SHOULD BE SUBMITTED |
| | FOR REFERENCE. |
| | THIS WILL HELP IN THE REVIEW PROCESS AND |
| | AVOID ANY DELAYS. |
| | |
| | PLEASE SUBMIT THE ABOVE INFORMATION FOR |
| | REVIEW. IF THERE ARE ANY QUESTIONS, |
| | PLEASE DO NOT HESITATE TO CALL. |
| | |
| | DEWEY PALMER |
| | ELECTRICAL PLAN REVIEW |
| | CONSTRUCTION SERVICES DEPT. |
| | CITY OF WEST PALM BEACH |
| | 561-805-6717 |
| | [email protected] |
| | |