| Date |
Text |
| 2006-07-06 00:00:00 | **** UNSAT *** |
| | |
| | 1) NOTE: PLEASE PROVIDE ENERGY CALCS FOR |
| | EXTERIOR LIGHTING. PLEASE SEE FBC 2004 |
| | CHAPTER 13,13-415.1.ABC.2 AND PROVIDE |
| | INFORMATION ACCORDINGLY. |
| | |
| | 2) NOTE: PLEASE SEE FBC 2004, |
| | 13-413.1ABC.1 FOR MIN WORST CASE VOLTAGE |
| | DROP SCENERIO TO BE PROVIDED. |
| | |
| | 3) NOTE: PLEASE PROVIDE WIND LOAD |
| | CALCULATIONS AT THIS TIME. PLANS |
| | CURRENTLY MENTION THIS IS TO BE |
| | PROVIDEDS, HOWEVER THIS IS REQUIRED AT |
| | THIS TIME. |
| | |
| | 4) NOTE: ** THIS IS NOT A KAMM |
| | CONSULTING COMMENT* |
| | PLEASE SEE THAT THE VALUE SET FORTH ON |
| | THE PERMIT APPLICATION AND SCOPE OF WORK |
| | APPLIED FOR DOES NOT SEEMTO INCLUDE |
| | ALL SITE, SITE LIGHTING, POLES FIXTURES |
| | AND NEW SALES FACILITY. |
| | IF ALL THE WORK AS SHOWN SUBMITTED ON |
| | PLANS IS IN SCOPE (EXCLUDING FUTURE |
| | BLDGS) THEN PLEASE ADJUST VALUE. |
| | PLEASE KNOW, IF THE SITE POLE |
| | CALCULATIONS ARE NOT SUBMITTED AT THIS |
| | TIME, THEN THE SITE LIGHTING WILL BE |
| | REQUIRED TO BE UNDER A SEPARATE PERMIT |
| | WITH PLANS AND FEES ATTHAT TIME. |
| | FBC ADMINISTRATIVE SECTION 108.3, AS |
| | ADOPTED BY THE CITY OF WEST PALM BEACH. |
| | |
| | 5) NOTE: PLEASE SEE RISER AND MDP |
| | SCHEDULE MENTIONS 3-PHASE FEEDS TO |
| | TRAILER PANELS, YET PANELS IN TRAILERS |
| | ARE SET UP AS 1-PHASE??? |
| | PLEASE CORRELATE. |
| | 215.5,106.1.2ADMIN SECTION. |
| | |
| | 6) NOTE: PLEASE ALSO SEE THE VOLTAGE |
| | INDICATED FOR TRAILERS IS 120/240 AND |
| | THE SERVICE BEING PROVIDED IS 120/208V. |
| | PLEASE VERIFY IF ALL VOLTAGES FOR A/C'S |
| | ETC WILL BE LISTED ETC TO RUN ON 208V. |
| | ** PLEASE KNOW, THIS WAS JUST AN ISSUE |
| | ON ANOTHER PROJECT AND THEINSTALLATION |
| | OF STEP-DOWN TRANSFORMERS FOR ALL |
| | EQUIPMENT HAD TO BE USED. |
| | PLEASE VERIFY THIS AND CORRELATE. |
| | 215.5,110.3, ETC |
| | |
| | 7) NOTE: PELASE PROVIDE GROUNDING AT |
| | TRAILERS AND HOW THESE WILL BE GROUNDED. |
| | IT SEEMS TO BE SHOWN ON RISER ,HOWEVR NO |
| | CONDUCTORS OR GRND RODS ARE SHOWN AT |
| | TRAILERS?? |
| | *IT WAS NOTED THAT THE NEUTRAL SHOULD |
| | NTO BE BONDED AT THE TRAILER. |
| | 250.50,550.16 |
| | |
| | 8) NOTE: PLEASE INDICATE IF ANY (METAL ) |
| | CWP TO BE BONDED. PLEASE SEE PLUMB RISER |
| | WHICH SEEMS TO INDICATE THIS WHICH WILL |
| | BE REQUIRED. |
| | PLEASE ALSO KNOW, IF THE TRAILERS BECOME |
| | REQUIRED TO CONTAIN FIRE SPRINKLERS, |
| | THEN THIS LINE WOULD ALSO BE BONDED. |
| | 250.50,250.104 |
| | |
| | 9) NOTE: PLEASE SEE THAT PLANS ARE |
| | "SIGNED" WITH THE LEGAL SIGNATURE KNOWN |
| | TO THIS OFFICE AND AS ON FILE BY THE |
| | ENGINEER OF RECORD. |
| | THE INITIALS AS SHOWN WILL NOT BE |
| | ACCEPTED. |
| | FS 471.025, FAC 61G15-23.002 |
| | |
| | 10) NOTE: PLEASE SEE THAT THE PLANS FOR |
| | THE TRAILER SHALL INCLUDE ALL CIRCUITING |
| | AND CORRELATE WITH PANEL SCHEDULES TO BE |
| | SUBMITTED. |
| | PLEASE SEE 700.12E FOR THE CIRCUITING |
| | THE EM/EXT LTS ON A LOCAL LIGHTING |
| | BRANCH CIRCUIT. |
| | |
| | 11) NOTE: PLEASE CLARIFY THE MEANS OF |
| | DISCONNECT IN THE TRAILER PANELS. |
| | |
| | PLEASE SUBMIT THE ABOVE INFORMATION FOR |
| | REVIEW. IF THERE ARE ANY QUESTIONS, |
| | PLEASE DO NOT HESITATE TO CALL. |
| | |
| | DEWEY PALMER |
| | ELECTRICAL PLAN REVIEW |
| | CITY OF WEST PALM BEACH |
| | CONSTUCTION SERVICES DEPT. |
| | 561-805-6717 |
| | [email protected] |
| | |
| | |