| Date |
Text |
| 2006-06-02 00:00:00 | *** DENIED *** |
| | 1) PLEASE SUBMIT ENERGY CALCULATIONS |
| | (SHORT FORM) PER 2004 FBC 13-600. |
| | |
| | 2) PLEASE STATE HOW MANY SYSTEMS ARE |
| | BEING INSTALLED ON MECHANICAL PLANS. |
| | |
| | 3) SHOW SENSIBLE BTU'S AND TOTAL BTU'S |
| | OF EQUIPMENT ON MECHANICAL PLANS. |
| | |
| | 4) SHOW EQUIPMENT SEER ON MECHANICAL |
| | PLANS. |
| | |
| | 5) SHOW ALL GRILL SIZES WITH CFM'S ON |
| | MECH. PLANS. |
| | |
| | 6) SHOW TRUNK LINE SIZE ON PLANS. |
| | |
| | 7) SHOW ON PLANS HOW AIR HANDLER UNITS |
| | ARE GETTING RETURN AIR, IF GRILLS SHOW |
| | SIZE. |
| | |
| | 8) PROVIED RETURN AIR TO BEDROOMS, SEE |
| | NOTE #11. |
| | |
| | 9) CONSTRUCTION DOCUMENTS SHALL BE OF |
| | SUFFICIENT CLARITY. PER 2004 FBC 106.1.1 |
| | |
| | 10) ALL INFORMATION/ DRAWINGS/ |
| | SPECIFICATIONS AND ACCOMPANYING DATA |
| | SHALL BEAR THE NAME AND SIGNATURE OF THE |
| | PERSON RESPONSIBLE FOR THE DESIGN. |
| | SECTION 104.2.1 |
| | |
| | 11) BALANCED RETURN AIR. |
| | THIS MAY BE ACHIEVED BY. |
| | (A)TRANSFER DUCTS MAY ACHIEVE THIS BY |
| | INCREASING THE RETURN TRANSFER ONE AND |
| | ONE HALF TIMES THE CROSS SECTIONAL AREA |
| | (SQUARE INCHES) OF THE SUPPLY DUCT |
| | ENTERING THE ROOM OR SPACE IT'S SERVING |
| | AND THE DOOR HAVING AT LEAST AN |
| | UNRESTRICTED 1 INCHUNDERCUT TO ACHIEVE |
| | PROPER RETURN AIR BALANCE. |
| | (B)TRANSFER GRILLES SHALL USE 50 |
| | SQUARE INCHES (OF GRILLE AREA) TO 100 |
| | CFM (OF SUPPLY AIR) FOR SIZING |
| | THROUGH-THE-WALL TRANSFER GRILLES AND |
| | USING AN UNRESTRICTED 1-INCH |
| | UNDERCUTTING OF DOORS TO ACHIEVE PROPER |
| | RETURN AIR BALANCE |
| | (C)HABITABLE ROOMS ONLY SHALL BE |
| | REQUIRED TO MEET THESE REQUIREMENTS FOR |
| | PROPER BALANCED RETURN AIR EXCLUDING |
| | BATHROOMS, CLOSETS, STORAGE ROOMS AND |
| | LAUNDRY ROOMS, EXCEPT THAT ALL SUPPLY |
| | AIR INTO THE MASTER SUITE SHALL BE |
| | INCLUDED. PER 2004 FBC/R M1602.4 . |
| | |
| | MECHANICAL PLAN REVIEW BY; |
| | TOM GORDON (561) 805-6729. |