| 2006-07-27 00:00:00 | 1810 S DIXIE HIGHWAY: |
| | |
| | 1. PLEASE PROVIDE A LANDSCAPE PLAN FOR |
| | THE PROPERTY, A LANDSCAPE PLAN IS |
| | REQUIRED AND MUST BE SIGNED AND SEALED |
| | BY A REGISTERED LANDSCAPE ARCHITECT. |
| | |
| | 2. HOW WILL BIKE RACK BE CONFIGURED? |
| | PLEASE PROVIDE DETAILS. |
| | |
| | |
| | 3. THE THREE SPACES ON THE SOUTH SIDE OF |
| | THE BUILDING MUST BE RELOCATED. BACKING |
| | ONTO THE PUBLIC RIGHT-OF-WAY IS NOT |
| | ALLOWED. |
| | |
| | 4. DUMPSTER ENCLOSURE DOES NOT MEET |
| | MINIMUM DIMENSIONS. |
| | |
| | 5. DUMPSTER ENCLOSURES MUST BE |
| | LANDSCAPED ON THREE SIDES BY SHRUBS OR |
| | HEDGES PLACED AT A 2? ON-CENTER |
| | INTERVAL. |
| | |
| | 6. A LETTER FROM THE CITY SANITATION |
| | DEPARTMENT MUST BE SUPPLIED APPROVING |
| | THE LOCATION OF THE DUMPSTER. |
| | |
| | 7. ALL LANDSCAPED AREAS MUST BE |
| | PROTECTED BY WHEEL STOPS OR CONCRETE ?D? |
| | CURBING. |
| | |
| | 8. SHOW LOADING ZONE DETAIL. THE LOADING |
| | ZONE MUST BE DEMARCATED BY SIGNAGE OR |
| | STRIPING. |
| | |
| | 9. A 5? SCREEN WALL IS REQUIRED ALONG |
| | THE EAST LOT LINE ABUTTING THE |
| | RESIDENTIAL USE. |
| | |
| | 10. IS MEZZANINE SQUARE FOOTAGE INCLUDED |
| | IN THE PARKING REQUIREMENT? PLANS ARE |
| | UNCLEAR IN THAT RESPECT. PARKING |
| | REQUIREMENTS MUST BE CALCULATED USING |
| | FINISHED SQUARE FOOTAGES. |
| | |
| | 11. WHEEL STOPS MUST BE 2? FROM FRONT |
| | EDGE OF PARKING SPACE. |
| | |
| | 12. PARKING AND STRIPING DETAILS WITH |
| | DIMENSIONS MUST BE SHOWN. |
| | |
| | 13. HANDICAP SPACE DOES NOT MEET MINIMUM |
| | DIMENSIONS. |
| | |
| | 14. ENSURE THAT ALL REGULAR PARKING |
| | SPACES MEET THE MINIMUM DIMENSIONS. |
| | |
| | 15. WILL PARKING LOT LIGHTING BE |
| | PROVIDED? IF SO, A PHOTOMETRIC PLAN IS |
| | REQUIRED. |
| | |
| | 16. A VICINITY MAP SHOWING THE PROPERTY |
| | IN RELATION ITS SURROUNDINGS IS |
| | REQUIRED. |
| | |
| | 17. PLEASE SHOW EASEMENTS AND THEIR |
| | CLASSIFICATIONS ON THE SITE PLAN. |
| | |
| | 18. A DATA TABLE MUST BE PROVIDED TO |
| | INCLUDE THE FOLLOWING: |
| | A. EXISTING AND PROPOSED LAND USE. |
| | B. TOTAL PROJECT ACREAGE. |
| | C. TOTAL GROSS BUILDING SQUARE FOOTAGE. |
| | D. PERCENT OF OPEN SPACE, LANDSCAPING, |
| | BUILDING COVERAGE, AND IMPERMEABLE |
| | SURFACE. |
| | E. DENSITY AND NUMBER OF DWELLING UNITS. |
| | F. PARKING COMPUTATIONS (PARKING |
| | REQUIRED, PROVIDED, ETC.) |
| | G. FLOOR AREA RATIO (FAR). |
| | |
| | 19. A MAXIMUM OF 25% OF THE BUFFER STRIP |
| | ALONG THE SOUTH LOT LINE MAY BE |
| | INTERRUPTED, PLANS SHOW 33% OF THE |
| | BUFFER STRIP INTERRUPTED. NOTE: THE 33% |
| | DOES NOT INCLUDE THE INTERRUPTION CAUSED |
| | BY THE 3 PARKING SPACES WHICH MUST BE |
| | RELOCATED. |