| 2006-10-28 19:18:36 | ******* UNSAT ******** |
| | |
| | ** PLEASE SEE THIS IS THE FIRST REVIEW UNDER PERMIT. |
| | |
| | |
| | |
| | 1) NOTE: OK. |
| | |
| | 2) NOTE: OK. |
| | |
| | 3) NOTE:OK. |
| | |
| | 4) NOTE: OK. |
| | |
| | 5) NOTE:NO/ OK, PLEASE SEE TRANSFORMER SIZE NOW SEEMS |
| | TO HAVE BEEN CHANGED, HOWEVER PLEASE SEE ME-2.0 WHICH |
| | STILL INDICATES A 45KVA UNIT (NOTE #11). |
| | PLEASE SEEMIN OCP WHICH IS REQUIRED AS THE LOAD AT |
| | 277/480V IS BEING SHOWN AT 75KVA, PLEASE SEE @THIS, |
| | THE OCP WOULD BE JUST OVER 90A'S WHICH IS BEING SHOWN. |
| | |
| | ** PREVIOUS REVIEW NOTE ** |
| | PLEASE INDICATE ALL CONTINUOUS |
| | LOADS AT 125%. 215.3,230.42 ETC. |
| | PLEASE SEE LOADSHOWN ON TRANSFORMER |
| | PLACES LOAD AT 44.97KVA. PLEASE SEE |
| | ABOVE NOTES, AS CONTINUOUS LOADS WILL |
| | PLACE THIS LOAD OVER RATING OF SAID |
| | 45KVA UNIT. |
| | PLEASE CLARIFY WHAT APPEARS TO BE |
| | ADDITIONAL LOAD ON "PA"? HOW, ARE THESE |
| | LOADS DIFFERENT OF THAT ON "DP"? |
| | PLEASE SHOW COMPLETE LOAD CALCULATIONS |
| | PER ABOVE AND 220.3,220.10,220.11,220.13 |
| | ETC. AND 215.3, 230.42 ETC |
| | |
| | 6) NOTE: OK. |
| | |
| | 7) NOTE:NO, PLEASE SEE CONTROLS FOR ALL SEPARATE |
| | SPACES DO NOT SEEM TO BE INDICATED.(BATHRM) PLEASE SEE |
| | "S" ARE BEING NOTED IN RESPONSE LTR AND SHOWN AS OC , |
| | HOWEVER IF THESE DEVICES ARE LOCATED BEHIND WALL WHICH |
| | SEPARATES STORAGE/BACK AREA FROM STORE SALES ARES, HOW |
| | WOULD THESE OCSENSOR TYPE SWITCHES BE EFFECTIVE. |
| | PLEASE INDICATE THE NORMAL SCHEDULING TIME OF DAY. |
| | PLEASE CLARIFY WHERE THE MAX TIMES PERMITTED ON THE |
| | DEVICES AS CHOSEN IS LOCATED ON PLANS? (OC TYPE 30MINS) |
| | (TIMER TYPE 4HRS MAX). |
| | PLEASE SEE MISSING THE PERFORMANCE CALCULATIONS PER |
| | 13-415.2, 13-415.2.ABC.1, TABLES, 415.2.C.1, 415.2.B.1 |
| | PLEASE SHOW A BREAK DOWN ON MAX LIGHTING POWER |
| | DENSITIES. |
| | |
| | ** PREVIOUS REVIEW NOTES** |
| | PLEASE SEE FBC 2004 CHAPTER 13, 13-415.1.ABC.1.1, |
| | .1.2, AND .1.3. |
| | PLEASE SEE SPACE IS IN A BUILDING |
| | GREATER THAN 5000 SQ FT AND CONTROLS FOR |
| | LIGHTING WILL BE REQUIRED (SHOWN), |
| | HOWEVER PLEASE SEE .1.2, AND .1.3 AS |
| | CONTROLS FOR SEPARATE SPACES WITH FLR TO |
| | CEILING PARTITIONS ARE REQUIRED. PLEASE |
| | SEE PERMITTED TYPE OF DEVICES AS "TIMER" |
| | TYPE OVER RIDES ARE ONLY PERMITTED TO |
| | OVER RIDE NORMAL SCHEDULING A MAX OF |
| | 4HRS. PLEASE SEE ANY OCCUPANCY SENSOR(S) |
| | TYPE DEVICES SHALL ONLY PERMIT A MAX OF |
| | 30 MINS. PLEASE SHOW LOCATION OF THESE |
| | OVER RIDES DEVICES AND PLEASE SEE THESE |
| | ARE REQUIRED AT THE POINT OF ENTRANCE |
| | INTO SPACE SO THE OCCUPANT CAN VISUALLY |
| | SEE LTS BEING CONTROLLED. PLEASE SEE |
| | EXCEPTION FOR OCC SENSORS. |
| | PLEASE SEE BATH R, STOCK RM ETC,,, |
| | IT IS NOTED BY THIS OFFICE THAT A TIME |
| | CLOCK IS BEING PROVIDED , HOWEVER |
| | PLEASE SEE ABOVE FOR OTHER REQUIREMENTS. |
| | |
| | 8) NOTE:OK, HOWEVER SEE NOTE ABOVE WITH RESPECT TO |
| | THE SIZE AND OCP FOR UNIT. THESE MAY INDEED CHANGE. |
| | |
| | PLEASE SEE NOTES SHOW #8 FOR |
| | FEED TO TRANSFORMER, HOWEVER A 60A BRKR |
| | IS SHOWN. PLEASE SEE 310.16, 240.4, |
| | 110.14, AS THE MAX OCP FOR THE #8' IS |
| | 50A'S. PLEASE SEE 310.16 75 DEGREE |
| | COLUMN AS THE #8'S ARE RATED AT 50A'S. |
| | PLEASE ADJUST ONCE ALL CALCULATIONS ARE |
| | DONE. |
| | |
| | *** NEW NOTE ** |
| | 9) NOTE: PLEASE SEE RISER MENTIONS A NEW 150A |
| | DISCONNECTAT LANDLORDS METER CENTER, IF PART OF THIS |
| | PERMIT, PLEASE COMPLETE RISER SHOWING THIS. IF NOT |
| | SEPARATE PERMIT AND PLANS WILL BE REQUIRED FOR THIS |
| | INSTALLATION. |
| | |
| | 10) NOTE: PLEASE BE SURE NEW "E" SHEETS ONLY CONTAIN |
| | THE RAISED SEAL PER FAC 61G15-23.001 FOR THE NEW |
| | WORDING "LICENSE" . THE OLDER SEALS WITH THE WORDING OF |
| | "CERTIFICATE ARE NO LONGER VALID. RULED PAST ON 2/04 |
| | AND EXTENDED TO 12/31/05. |
| | |
| | ** IMPORTANT** |
| | ONCE ALL REVIEWS ARE DONE AND PLANS ARE |
| | PICKED UP FOR CORRECTIONS, PLEASE BE |
| | SURE TO COMPLETELY REMOVE ALL OLD/VOIDED |
| | SHEETS AND ONLY INSERT NEW REVISED |
| | SHEETS INTO TWO COMPLETE SETS FOR REVIEW |
| | AND STAMPING. DO NOT LEAVE ANY |
| | OLD/VOIDED SHEETS IN SETS. |
| | PLEASE KNOW ONLY ONE SET OF THE |
| | OLD/VOIDED SHEETS SHOULD BE SUBMITTED |
| | FOR REFERENCE. |
| | THIS WILL HELP IN THE REVIEW PROCESS AND |
| | AVOID ANY DELAYS. |
| | |
| | PLEASE SUBMIT THE ABOVE INFORMATION FOR |
| | REVIEW. IF THERE ARE ANY QUESTIONS, |
| | PLEASE DO NOT HESITATE TO CALL. |
| | |
| | DEWEY PALMER |
| | ELECTRICAL PLAN REVIEW |