| 2006-05-18 00:00:00 | ******DENIED****** |
| | REFERENCE: FBC-2004 PLUMBING |
| | |
| | THE FOLLOWING INFORMATION IS REQUIRED |
| | FOR PLUMBING PLAN REVIEW FOR A PERMIT: |
| | |
| | 1. INDICATE ON SHEET A-1 AND SHEET A-2 |
| | THE OUTSIDE SHOWER DRAIN PIPE, DRAIN |
| | PIPE SIZE AND WHERE IT IS DRAINING TO. |
| | 2. ON SHEET A-6 PLUMBING RISER DIAGRAM |
| | THERE INDICATES A FUTURE OUTDOOR SINK. |
| | PLEASE INDICATE ON SHEET A-2 THE |
| | LOCATION OF THE FUTURE OUTDOOR SINK. |
| | 3. ON SHEET A-6 PLUMBING RISER DIAGRAM |
| | THE FOLLOWING IS REQUIRED FOR THE FUTURE |
| | OUTDOOR SINK. |
| | (A) 704.4 FUTURE FIXTURES. DRAINAGE |
| | PIPING FOR FUTURE FIXTURES SHALL |
| | TERMINATE WITH AN APPROVED CAP OR PLUG. |
| | (B) 905.6 VENT FOR FUTURE FIXTURES. |
| | WHERE THE DRAINAGE PIPING HAS BEEN |
| | ROUGHED-IN FOR FUTURE FIXTURES, A |
| | ROUGH-IN CONNECTION FOR A VENT SHALL BE |
| | INSTALLED. THE VENT SIZE SHALL BE NOT |
| | LESS THAN ONE-HALF THE DIAMETER OF THE |
| | ROUGH-IN DRAIN TO BE SERVED. THE VENT |
| | ROUGH-IN SHALL CONNECT TO THE VENT |
| | SYSTEM, OR SHALL BE VENTED BY OTHER |
| | MEANS AS PROVIDED FOR IN THIS CHAPTER. |
| | THE CONNECTION SHALL BE IDENTIFIED TO |
| | INDICATE THAT IT IS A VENT. |
| | 4. ON SHEET A-6 PLUMBING RISER DIAGRAM |
| | THE BRANCH DRAIN AND THE DRAINAGE STACK |
| | ARE SIZED INCORRECTLY FOR THE WASHING |
| | MACHINE, THE FOLLOWING IS REQUIRED FOR |
| | THE SIZING OF THE WASHING MACHINE. |
| | (A) 406.3 WASTE CONNECTIONS.THE TRAP AND |
| | FIXTURE DRAIN FOR AN AUTOMATIC CLOTHES |
| | WASHER SHALL BE A MINIMUM OF 2 INCHES |
| | (51MM) IN DIAMETER. THE AUTOMATIC |
| | CLOTHES WASHER FIXTURE DRAIN SHALL |
| | CONNECT TO A BRANCH DRAIN OR DRAINAGE |
| | STACK A MINIMUM OF 3 INCHES (76MM) IN |
| | DIAMETER |
| | (B) 802.4 STANDPIPES.STANDPIPES SHALL BE |
| | INDIVIDUALLY TRAPPED. STANDPIPES SHALL |
| | EXTEND A MINIMUM OF 18 INCHES (457MM) |
| | AND A MAXIMUM OF 42 INCHES (1066MM) |
| | ABOVE THE TRAP WEIR. ACCESS SHALL BE |
| | PROVIDED TO ALL STANDPIPES AND DRAINS |
| | FOR RODDING (NOTE: THE INDICATION OF THE |
| | STAND PIPE ON CORRECTED PLBG. RISER |
| | DIAGRAM) |
| | 5. PLEASE NOTE THE CORRECTED CLEANOUT |
| | LOCATIONS ON A-6 PLBG. RISER DIAGRAM AND |
| | THE FOLLOWING CODE REQUIREMENTS FOR |
| | CLEANOUTS |
| | (A) 708.3.4 BASE OF STACK. A CLEANOUT |
| | SHALL BE PROVIDED AT THE BASE OF EACH |
| | WASTE OR SOIL STACK |
| | (B) 708.3.5 BUILDING DRAIN AND BUILDING |
| | SEWER JUNCTION. THERE SHALL BE A |
| | CLEANOUT NEAR THE JUNCTION OF THE |
| | BUILDING DRAIN AND THE BUILDING SEWER. |
| | (C) 708.7 MINIMUM SIZE. CLEANOUTS SHALL |
| | BE THE SAME NOMINAL SIZE AS THE PIPE |
| | THEY SERVE UP TO 4 INCHES (102MM). |
| | (D) 708.9 ACCESS. ACCESS SHALL BE |
| | PROVIDED TO ALL CLEANOUTS.(NOTE THE |
| | LOCATION OF THE WASHING MACHINE |
| | CLEANOUT) |
| | 6. PLEASE NOTE THE FOLLOWING WILL BE |
| | REQUIRED FOR THE GAS DRYER AND GAS WATER |
| | HEATER. |
| | NOTE: GAS PERMIT REQUIRED. GAS CONTRAC- |
| | TOR TO SUBMIT PLANS WITH PERMIT APPLICA- |
| | TION. ALL GAS INSPECTIONS TO BE COMPLETE |
| | BEFORE FINAL INSPECTION. |
| | |
| | END OF COMMENTS: |
| | |
| | REVIEW BY MIKE PERSON |
| | (561) 805-6730 |
| | FAX (561) 805-6731 |
| | E-MAIL [email protected] |
| | UNDER SUPERVISION OF K.STEVENS |
| | (561) 805-6721 |
| | |
| | |