2007-04-15 18:08:44** UNSAT **
  
 REVISIONS.
  
 1) NOTE: PLEASE SEE THAT LETTER OF SUBMITTED CHANGE OR
 INFORMATION ON CHANGES MADE WOULD BE HELPFUL IN THE
 REVIEW OF DOCUMENTS FOR CHANGES MADE.
 PLEASE KNOW THAT ALL CHANGES WHICH AFFECT THE BASE
 BUILDING UNDER THE TENANT BUILD OUTS WILL BE REQUIRED
 TO BE REVISED ON BASE BUILDING PLANS.
 THIS IS FOR ALL BUILD OUT AFFECTING BASE PLANS BEFORE
 CO OF MAIN BUILDING.
 PLEASE BE SURE TO COORDINATE WITH ANY ELECTRICAL
 REQUIREMENTS AND CHANGES REQUIRED FOR TENANT FIT UPS.
 FBC 106.3.5.1.2
  
 2) NOTE: PLEASE SUBMIT ALL MANUFACTURE SPECS/CUT SHEETS
 FOR ALL NEW REVISED ATS AND GENERATOR EQUIPMENT.
 PLEASE KNOW IT HAS COME TO ATTENTION THAT THE ADDITION
 OF THE BI-FUEL DEVICES ON THE GENERATOR UNITS MAY
 INDEED CAUSE ANY LISTINGS TO BE VOIDED AND ALSO VOID
 ANY WARRANTY ON THE UNITS.
 THE WARRANTY IS NOT THE CONCERN OF THIS OFFICE, HOWEVER
 VOIDING ANY LISTINGS OF LEGALLY REQUIRED AND EMERGENCY
 STAND-BY SYSTEMS REQUIRED FOR LIFE SAFETY IS OF
 CONCERN.
 THIS MATTER WILL BE LOOKED INTO FURTHER AND INFORMATION
 FORWARD TO THE LISTING AGENCY AS LISTED ON EQUIPMENT
 SUBMITTED UNDER THE INITIAL BASE BUILDING PERMITTED
 PACKAGE. PLEASE SEE THE SIZE OF THE GENERATOR HAS
 INCREASED HOWEVER THE OCP DEVICES HAVE NOT CHANGED ON
 UNIT?
 PLEASE ALSO SUBMIT THE SPECS FOR THE PARALLELING SWITCH
 GEAR AS REVISED.
 PLEASE CLARIFY.
 110.3, 90.7
  
 3) NOTE: PLEASE CORRELATE RISER AND PARALLELING SWITCH
 GEAR AS THESE NO LONGER MATCH DUE TO CHANGES FOR ATS-1.
 THE ATS- IS NOW SHOWN BEING FED FROM A 3200AMP ON THE
 PS GEAR AND THE RISER HAS NOT CHANGED ALONG WITH THE
 EQUIPMENT?
 PLEASE PROVIDE MORE INFORMATION.
 EQUIPMENT MAY NOT BE FED FROM 3200A OCP WHEN ONLY RATED
 FOR 3000AMPS>
  
 4) NOTE: PLEASESUBMIT A SELECTIVE COORDINATION STUDY
 NOW THAT EQUIPMENT SHOULD ALL BE SELECTED.
 240.12, 700.27, 701.18. NEC
 NFPA-110 6.5.1
 FBC 106.1.2
  
 5) NOTE: PLEASE CLARIFY THE NEW MAINS NOW BEING SHOWN
 FOR THE EMERGENCY SYSTEMS AND LEGALLY REQUIRED SYSTEMS
 WHICH INDICATE GF PROTECTION?
 PLEASE SEE 240.13, 230.95, AND NEC 700.7D
  
 6) NOTE: PLEASE SEE RISER HAS NOW CHANGED TO INDICATE
 THE SWBDB TO BE A 4000AMP RATED MAIN, YET NOTE FOR THIS
 STILL INDICATES THIS AS A 5000AMP SWITCH BOARD?
 PLEASE CORRELATE.
 FBC 106.1.2
  
 7) NOTE: PLEASE SEE THE PLANS HAVE HAD SEVERAL LIGHTING
 FIXTURES REVISED ALONG WITH THE NUMBER AND LOCATIONS OF
 FIXTURES. PLEASE SUBMIT REVISED ENERGY CALCULATIONS FOR
 BUILDING PER 13-415.1.AB.1.1.
  
 8) NOTE: PLEASE SEE THE FIXTURE LEGEND HAS BEEN REVISED
 AND THERE ARE FIXTURES WHICH ARE SHOWN ON PLANS WITH
 DESIGNATIONS WHICH ARE NOT LISTED ON FIXTURE LEGEND.
 (CCE, NL ETC)
 PLEASE SHOW ALL FIXTURES AND COORDINATE WITH LEGEND AND
 REVISED ENERGY CALCULATIONS.
 FBC 106.1.2
  
 9) NOTE: PLEASE SEE ELEVATOR MOTORS 1,2 AND 3 WHICH HAS
 NOW INCREASED ALONG WITH THE FEEDING FROM LSPA, YET THE
 OCP FROM LSPA HAS ACTUALLY GONE DOWN??
 PLEASE SEE THE LOAD HAS INCREASED WHICH NO EXCEEDS THE
 RATING OF THE NEW LOWER 200AMP BREAKER?
 PLEASE VERIFY ALL LOADS ON MOTORS PER 430 TABLES AND
 VERIFY THE LOADS ON EACH.
 PLEASE SUBMIT REVISED SCHEDULES FOR THIS.
 PLEASE REVISED ANY LOAD CALCULATIONS.
 FBC 106.1.2
 NEC 240, 430, 220
  
 10) NOTE: PLEASE SEE NEW LIGHTING ON E-100 SEEM TO BE
 LOCATED OUTSIDE PROPERTY LINE OF THE BUILDING. PLEASE
 CLARIFY AND PROVIDE DOCUMENTATION OF ANY CHANGES.
  
 11) NOTE: PLEASE SUPPLY REVISED VOLTAGE DROP
 INFORMATION FOR DECREASED OF CONDUCTORS AND BRANCH
 CIRCUITS ON PLANS FOR SITE LIGHTING WHICH IS NOT
 LOCATED LONGER RUNS THAN PREVIOUS PLANS AND SMALLER
 CONDUCTORS.
 13-413.1.ABC.1
  
 * ** IMPORTANT**
 ONCE ALL REVIEWS ARE DONE AND PLANS ARE
 PICKED UP FOR CORRECTIONS, PLEASE BE
 SURE TO COMPLETELY REMOVE ALL OLD/VOIDED
 SHEETS AND ONLY INSERT NEW REVISED
 SHEETS INTO TWO COMPLETE SETS FOR REVIEW
 AND STAMPING. DO NOT LEAVE ANY
 OLD/VOIDED SHEETS IN SETS.
 PLEASE KNOW ONLY ONE SET OF THE
 OLD/VOIDED SHEETS SHOULD BE SUBMITTED
 FOR REFERENCE.
 THIS WILL HELP IN THE REVIEW PROCESS AND
 AVOID ANY DELAYS.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW II
 CONSTRUCTION SERVICES DEPT.
 CITY OF WEST PALM BEACH
 561-805-6717
 [email protected]
2007-04-15 16:07:07IN PROGRESS
2007-04-14 16:02:49ONE ROLL IN ELEC FOR REVIEW.