| Plan Review Notes For Permit 06040957 |
| Permit Number |
06040957 |
|
| Review Stop |
M |
| Sequence Number |
26 |
|
| Notes |
| Date |
Text |
| 2008-07-25 11:28:45 | REVIEW OF CALCS WAS PLACED ON HOLD PENDING CONFERENCE | | | CALL WITH AHA DESIGN TEAM WHICH TOOK PLACE 7/25/08 AT | | | APPROX. 8:15 AM. | | | | | | CLARIFICATION IS REQUIRED TO COORDINATE THE INPUT DATA | | | REPORT (IDR) WITH THE PLANS. THE FOLLOWING ISSUES SHALL | | | BE ADDRESSED: | | | | | | 1. PAGE 104 OF THE IDR SHOWS A SYSTEM 7 WITH HP-3. THIS | | | SYSTEM ON THE PLANS CALLS FOR A 3 TON SYSTEM WHILE THE | | | IDR CALS FOR A 5 TON SYSTEM. PLEASE COODINATE THIS | | | SYSTEM ON BOTH DOCUMENTS. | | | | | | 2. PAGE 105 OF THE IDR SHOWS A SYSTEM 9 WITH HP-1. THIS | | | SYSTEM ON BASE BUILDING PLANS HAS BEEN DELETED. PLEASE | | | IDENTIFY WHERE THIS SYSTEM IS LOCATED AND PROVIDE A | | | DESIGNATION WHICH IDENTIFIES ITS LOCATION IF NOT PART | | | OF THE BASE BUILDING. | | | | | | 3. PAGE H0.02 OF THE BASE BUILDING PLANS SHOWS AN HP-2 | | | ON THE HEAT PUMP SCHEDULE. THIS SYSTEM IS NOT | | | REPRESENTED IN THE ENERGY CALCULATIONS AND COULD NOT BE | | | FOUND IN THE IDR. PLEASE COORDINATE THIS SYSTEM ON BOTH | | | DOCUMENTS. | | | | | | ALL OTHER LISTED SYSTEM COMPONENTS ARE IN COMPLIANCE | | | AND REQUIRE NO FURTHER ACTION. | | | | | | IF YOU HAVE ANY QUESTIONS PLEASE CONTACT: | | | RONALD J. REGUEIRO | | | 561.805.6719 | | | [email protected] | | 2008-07-22 16:33:38 | REVIEW OF REVISED CALCS IN PROGRESS... |
|