2006-08-02 00:00:00**** NOTE***
  
 A RETURN PHONE CALL WAS PLACED TOMR.
 WORKS AND MR. JOINER AT APPROX 5:45PM TO
 GO OVER COMMENTS OF PLAN REVIEW.
 PHONE CONFERENCE LASTED TILL 7:14PM AND
 SHALL CONTINUE AT THE DESIGN'S TEAM NEXT
 AVAILBLE TIME.
 MOST COMMENTS WERE GONE OVER AND ANY
 FOLLOW UP REVIEW OF COMMENTS WILL TAKE
 PLACE AT A LATER DATE AND TIME.
2006-07-30 00:00:00IN PROGRESS
  
 ******* UNSAT 2ND REVIEW ******
  
 CITY PLACE OFFICE TOWER
 525 OKEECHOBEE BLVD.
  
 ** PLEASE SEE MANY OF THE NOTES FROM THE
 PREVIOUS REVIEW STILL NEED TO BE
 ADDRESSED ALONG WITH NEW COMMENTS.
 PLEASE SEE NOTE BELOW ARE TAKEN DIRECTLY
 FROM PREVIOUS REVIEW WITH FURTHER
 EXPLANATION ADDED IN RESPONSE. PLEASE
 SEE THE NEW NOTES ARE ADDED TO THE
 BOTTOM OF THE FIRST REVIEW.
  
  
  
 **PLEASE KNOW PLANS AND SUBMITTED PAPER
 WORK IS NOT COMPLETE AT THIS TIME FOR A
 COMPLETE AND SUFFICIENT REVIEW. PLEASE
 KNOW THERE MAY BE FURTHER COMMENTS ONCE
 ALL INFORMATION IS SUBMITTED.
  
 1) NOTE: NO, PLEASE SEE ALL VOIDED
 SHEETS WERE ADDED TO ALL THREE SETS. IF
 REPLACING ALL SHEETS IN SETS AND RUNNING
 ALL NEW SETS, PLEASE ONLY SUBMIT "ONE"
 ROLL OF THE "VOIDED" SHEETS SEPARATELY.
 IF THERE ARE ANY QUESTIONS PLEASE CALL.
  
 ** PREVIOUS REVIEW NOTE**
 PLEASE KNOW, BEFORE RE-SUBMITTING
 PLANS. PLEASE COMPLETELY REMOVE ALL
 OLD/VOIDED SHEETS AND ONLY INSERT NEW
 REVISED SHEETS INTO COMPLETED SETS FOR
 REVIEW AND STAMPING. PLEASE KNOW SINCE
 MANY OF THE COMMENTS BELOW AFFECT ALL OF
 THE SHEETS IN THE SETS, ONLY ONE ROLL OF
 OLD SETS SHOULD BE SUBMITTED FOR
 REFERENCE WHEN PLANS ARE BROUGHT BACK.
 THESE SHOULD BE LABELED "OLD/VOIDED".
  
 2) NOTE: NO. PLEASE SEE MISSING
 INFORMATION ON ALL TITLE BLOCKS FOR ALL
 TRADES AND FOR ALL SHEETS. PLEASE KNOW
 THAT "ANY" ARCHITECTURAL FIRM,
 ENGINEERING FIRM, LANDSCAPE FIRMETC
 LISTED ON SAID TITLE BLOCKS ARE REQUIRED
 TO HAVE THEIR CERTIFICATE OF
 AUTHORIZATION NUMBER LISTED ON TITLE
 BLOCKS ALONG WITH ALL OTHER INFORMATION
 AS REQUIRED UNDER THE FLORIDA
 ADMINISTRATIVE CODES AND FLORIDA STATUES
 AS LISTED ON PREVIOUS REVIEW.
 PLEASE SEE THAT THE ENGINEERING FIRM HAS
 NOW ONLY LISTED THE PRINTED PE # FOR THE
 DESIGNER AS THE REQUIRED CA #. PLEASE
 SEE ARCHITECTURAL FIRM ELKUS/MANFREDI
 DOES NOT FIRM NUMBER LISTED.
 PLEASE SEE MISSING LICENSE INFORMATION
 FOR LANDSCAPE PLANS. A NUMBER IS LISTED
 ON LANDSCAPE TITLE BLOCKS BUT IT IS
 UNCLEAR WHAT THIS NUMBER IS AS IT DOES
 NOT COME UP IN THE STATE?S WEBSITE:
 DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION.
 PLEASE ALSO KNOW NUMEROUS SEARCHES UNDER
 DBPR?S SITE FOR OTHER FIRMS HAVE NOT
 DELIVERED ANY OTHER LICENSE INFORMATION.
  
 ** PREVIOUS REVIEW NOTE **
 PLEASE SEE MISSING INFORMATION ON MANY
 OF THE TITLE BLOCKS ON PLANS. PLEASE SEE
 MISSING FIRM LICENSE NUMBERS WHICH ARE
 THE CERTIFICATE OF AUTHORIZATION NUMBERS
 FOR MORE THAN ONE FIRM. PLEASE SEE
 LANDSCAPE AND MEP ENGINEERING FIRMS.
 PLEASE ALSO SEE MANY SHEETS ARE MISSING
 THE PRINTED NAME AND LICENSE NUMBER FOR
 THE PERSON SIGNING AND SEALING SAID
 DOCUMENTS.
 PLEASE SEE MISSING THE PRINTED NAME AND
 PRINTED LICENSE NUMBER FOR ARCHITECT OF
 RECORD ON TITLE BLOCKS FOR STH.
 PLEASE SEE THE FLORIDA ADMINISTRATIVE
 CODE 61G1-16.004 AND 61G15-23.002.
 FLORIDA STATUES 471.023, 481.219
 ** PLEASE KNOW THE ABOVE INFORMATION IS
 REQUIRED FOR ALL TRADES AND FOR ALL
 SHEETS WHETHER OR NOT COMMENTS ARE MADE
 BY OTHER REVIEWERS.
  
 3) NOTE:NO, PLEASE SEE SOME SHEETS IN
 SETS STILL CONTAIN A "RUBBER STAMP" FOR
 THE REQUIRED ORIGINAL SIGNATURE OF
 DESIGN PROFESSIONAL. THIS COMMENT IS FOR
 THE "S" SHEETS AND RESPONSIBLE
 STRUCTURAL ENGINEER.
 PLEASE SEE BUILDING REVIEW NOTES ALSO
 UNDER FOUNDATION PERMIT AS THE "S"
 SHEETS FOR SECOND REVIEW ALL CONTAINED
 THE SAME "RUBBER STAMP".
 ** IMPORTANT** PLEASE SEE NEW NOTE BELOW
 FOR OTHER DESIGNERS OF RECORDS AND
 SIGNATURES NOW ON PLANS.
  
 ** PREVIOUS REVIEW NOTE **
 PLEASE SEE OTHER SHEETS WHICH CONTAIN A
 "STAMP" FOR THE REQUIRED "ORIGINAL"
 SIGNATURE BY THE DESIGN PROFESSIONAL.
 PLEASE SEE "S" SHEETS.
 FLORIDA STATUES 471.025
 PLEASE ALSO SEE ANY COMMENTS FROM OTHER
 TRADES WHICH RESPECT TO THE SEAL
 CONTAINING THE WORDING OF "CERTIFICATE"
 WHICH IS NOT LONGER ACCEPTED.
 FAC 61G1-16.001
  
 4) NOTE:NO, PLEASE SEE "A0.12" AS
 PLANS MENTIONS "EMERGENCY AND STAND-BY
 POWER SYSTEMS" PER NFPA-72 2002.
 PLEASE ADJUST AS THE EMERGENCY AND
 STAND-BY SYSTEMS ARE FROM NFPA-110 2002
 AND NFPA-72 2002 IS A SEPARATE CODE
 "NATIONAL FIRE ALARM CODE".
  
 ** PREVIOUS REVIEW NOTE **
 PLEASE SEE PLANS SHALL CONTAIN THE
 FOLLOWING MIN CODES REFERENCED AND
 LISTED ON PLANS FOR DESIGN.
 THE ARCHITECTURAL LISTS THE 2004 FBC.
 PLEASE LIST:
 2002 NFPA-70 NATIONAL ELECTRICAL CODE
 2003 NFPA-101 LIFE SAFETY CODE
 2003 NFPA-20 FIRE PUMPS
 2002 NFPA-110 EMERGENCY AND
 STANDBY POWER SYSTEMS.
 NFPA-72 2002
 THESE ARE REQUIRED AT A MIN.
  
 5) NOTE:NO, PLEASE SEE NOT ALL
 MANUFACTURE SPECS/CUT SHEETS WERE
 LOCATED ON BOOKS AND SUBMITTED PACKAGES.
 PLEASE SEE MISSING SPEC FOR THE
 "PARALLELING SWITCH GEAR". IT WAS NOTED
 THAT THE BOOKS CONTAIN AN ELEVATION OF
 THE SWITCH GEAR, HOWEVER NOTHING COULD
 BE LOCATED FROM MANUFACTURE ETC SHOWING
 LISTINGS FROM A NRTL.
 ** WHEN RESUBMITTING SPEC/PRODUCT BOOKS
 PLEASE PROVIDE TAB/LABELS FRO ALL
 ITEMS/EQUIPMENT LOCATED IN SAID BOOK AS
 WINDOWS, DOORS AND OTHERS ARE TABBED.
 PLEASE KNOW, THIS WILL HELP GREATLY IN
 THE REVIEW PROCESS TO FIND ALL ITEMS.
  
 ** PREVIOUS REVIEW NOTE **
 PLEASE SUBMIT ALL MANUFACTURES SPECS/CUT
 SHEETS FOR THE FOLLOWING.
 GENERATOR(S), ATS SWITCHES, FIRE PUMP,
 FIRE PUMP CONTROLLER, FUEL TANK,
 PARALLELING SWITCH GEAR AND OTHER
 ASSOCIATE SWITCHGEAR.
 PLEASE KNOW, NONE OF THESE WERE
 SUBMITTED AND UNABLE TO VERIFY MANY
 ITEMS FOR CODE COMPLIANCE AT THIS TIME.
 PLEASE BE SURE ALL EQUIPMENT SHEETS
 /SPECS CONTAIN LISTINGS FROM A NRTL.
  
 6) NOTE: NO, PLEASE KNOW AS OF THE DATE
 OF THIS REVIEW THESE ITEMS ARE NOT PART
 OF THIS LEGAL ADDRESS. PLEASE KNOW THESE
 MUST BE A LEGAL PART OF THIS BUILDING AS
 THESE ARE PART OF THE LIFE SAFETY OF
 SAID BUILDING. PLEASE KNOW THAT THE
 CORRIDOR WORK AND ANY WORK LOCATED ON
 "B-BLOCK" PARKING GARAGE PROPERTY WILL
 MOST LIKELY BE REQUIRED UNDER SEPARATE
 PERMIT. PLEASE SEE THAT ELEVATOR IS
 BEING FED FROM THIS NEW BUILDING AND
 SHALL BE PART OF THIS LEGAL PROPERTY.
  
 ** PREVIOUS REVIEW NOTE **
 PLEASE SEE PLANS SEEM TO INDICATE THE
 2000KW GENERATORS LOCATED ON A SEPARATE
 PROPERTY. PLEASE KNOW, PROPERTY LINES
 MAY CHANGE, SEPARATE PERMIT MAY BE
 REQUIRED ALSO IF INDEED THESE ARE ON
 SEPARATE PROPERTIES. THERE MAY ALSO BE
 THE POSSIBILITY OF EASEMENTS WHICH MAY
 NEED TO BE GRANTED.
 PLEASE ALSO SEE THE ELEVATOR TOWER BEING CONSTRUCTED
 NEXT TO THE PARKING GARAGE
 ALSO SEEM TO BE ON A SEPARATE LEGAL
 PROPERTY BEING FED FROM THE MAIN TOWER.
 PLEASE KNOW THIS MAY NOT BE POSSIBLE
 DEPENDING ON THE OUTCOME OR CHANGES IN
 PROPERTY LINES ETC.
 PLEASE SEE THE PROPOSED WORK IN CORRIDOR
 LOCATED AT THE "B" BLOCK GARAGE
 STRUCTURE WILL BE REQUIRED UNDER A
 SEPARATE PERMIT.
 ** PLEASE ALSO SEE BUILDING REVIEW
 COMMENTS FOR ABOVE AS MANY OF THESE
 ITEMS ARE TO BE PLACED IN BUILDING
 REVIEW AND MAY AFFECT PLANS SUBMITTED.
  
 7) NOTE: OK.
  
 8) NOTE: OK. GATES MUST CONTAIN MANUAL
 OPERATION UNDER POWER FAILURE.
  
 8) NOTE: NO, PLEASE SUBMIT ALL AS
 REQUESTED. PLEASE SEE THAT THE "HAND
 DRAWN" PANEL SCHEDULES SUBMITTED IN
 SUBMITTAL BOOKS IS NOT ACCEPTABLE TO THE
 AHJAS THIS INFORMATION IS PART OF THE
 DESIGN OF THE BUILDING WHICH SHALLBE
 PLACED IN DRAFTSMAN'S LIKE QUALITY IN
 THE COMPLETED SETS OF PLANS SUBMITTED
 WITH ALL RELEVANT TITLE BLOCKS, SIGNED,
 DATED AND SEALED BY THE DESIGN
 PROFESSIONAL OF RECORD.
 PLEASE SEE THAT THESE PANEL SCHEDULES
 CONTAIN ALL ROOM/AREA DESIGNATIONS ,
 CIRCUITS, OCP AND CONDUCTOR SIZES.
 FBC 106.1.3, 106.3.5.1.2, NEC 408.4,
 240.4,310.16, FS 471.025, FAC
 61G15-23.002
  
 ** PREVIOUS REVIEW NOTE **
 PLEASE SUBMIT COMPLETED PANEL SCHEDULES
 FOR ALL PANELS. THE PANELS ARE INDICATED
 ON E3.03 ARE NOT SUFFICIENT FOR REVIEW
 OF ALL SAID ELECTRICAL BRANCH CIRCUITS
 FOR OVER CURRENT PROTECTION, CONDUCTOR
 SIZES ETC.
 215.5
 MANY ITEMS CAN NOT BE REVIEWED AT THIS
 TIME.
 AN EQUIPMENT SCHEDULE AS SUBMITTED IS
 OK, HOWEVER THESE ITEMS SHOULD BE LISTED
 ON PANEL SCHEDULES TO BE SUBMITTED.
  
 9) NOTE: NO.RESPONSE LETTER FROM
 DESIGN TEAM MENTIONS THIS WAS AND IS
 COMPLETE AS OF FIRST REVIEW HOWEVER
 PLEASE SEE MANY ITEMS ON PLANS WHICH DID
 NOT PREVIOUSLY CONTAIN CIRCUIT #'S ETC,
 NOW DO.HOW PLANS ARE CIRCUITED AND
 WITH THE DEVICES DENOTING A NUMERICAL IDENTIFICATION
 AND HOW THAT CORRELATES
 WITH PANEL AND PANEL SCHEDULES IS KNOWN
 BY THIS REVIEWER/OFFICE AND WHAT COMMON
 PRACTICE IS AND HAS BEEN ACROSS THE
 COUNTRY AND THIS JURISDICTION. PLEASE
 KNOW THE INTENT OF THE COMMENT WAS NOT
 TO PLACE THE COMPLETE "SWITCH LEGS" OR
 TO SHOW ACTUAL "BRANCH CIRCUITING" ON
 SAID PLANS.
 PLEASE SEE NUMEROUS AREAS ON PLANS WHICH
 CONTAIN A NUMBER WHICH COULD CORRELATE
 TO MORE THAN ONE CIRCUIT AND PANEL.
 PLEASE SEE REDLINED PLANS FOR THESE.
 E1.01 ETC.
 PLEASE SEE ONE EXAMPLE IS THE NUMBER "4"
 ON 1.01. THIS COULD BE CIRCUITED TO A
 MINIMUM OF THREE CIRCUITS FROM THREE
 SEPARATE PANELS AS NOT ALL OF THE NUMBER
 "4"S? ARE CONNECTED, OR SEPARATED BY ANY
 LINE DENOTINGSEPARATE AREAS OR OTHER
 MEANS TO CONNECT THOSE NUMBERS TO BE ON
 ONE CIRCUIT. PLEASE SEE OTHERS ARE LIKE
 THIS ALSO. PLEASE SEE THERE ARE STILL
 SOME FIXTURES ETC WHICH CONTAIN A
 "NUMBER" HOWEVER NO CIRCUIT DESIGNATION
 ON THE ENTIRE SHEET CORRELATES TO THE
 NUMERICAL NOTATION.
 PLEASE SEE ONE SET OF PLANS HAS BEEN
 REDLINED WITH THESE AREAS AS NOTED.
  
 ** PREVIOUS REVIEW NOTE **
 PLEASE COMPLETE ALL THE CIRCUITING AND
 SWITCH LEGS ON PLANS AND LAYOUTS. PLEASE
 SEE MANY AREAS ARE LEFT TO FIGURE WHERE
 THESE DEVICES, OUTLETS, OR LIGHTING
 OUTLETS ARE BEING FED FROM AND/OR
 CONTROLLED.
 PLEASE CORRELATE WITH PANEL SCHEDULES TO
 BE SUBMITTED.
 215.5
  
 10) NOTE: NO. PLEASE KNOW IT WAS NOT THE
 INTENT OF COMMENT TO COMPLETELY REMOVE
 CORRIDORS AS THESE ARE REQUIRED. PLEASE
 KNOW AS THE FUTURE TENANT LAYOUTS ARE
 NOT KNOWN AT THIS TIME THE CORRIDORS
 WILL BE REQUIRED FROM THE BASE BUILDING
 LAYOUT. TENANT BUILD OUTS WILL NOT
 INCLUDE BASE BUILDING CORRIDOR BUILD
 OUTS AND THE ELECTRICAL ROOMS, DATA,
 TELEPHONE ROOMS SHALL BE ACCESSIBLE FOR
 BASE BUILDING DESIGN. PLEASE ALSO SEE
 BUILDING REVIEW COMMENTS FOR OTHER AREAS
 WHICH WILL REQUIRE ACCESS TO STAIR
 TOWERS ETC.
 PLEASE SEE THESE CORRIDORS ARE REQUIRED
 AT THIS TIME.
  
 ** PREVIOUS REVIEW NOTE **
 PLEASE CORRELATE ARCHITECTURAL PLANS
 WITH ELECTRICAL. PLEASE SEE FLOORS 6-14
 ARE SHOWN CONTAINING A CORRIDOR TO MAIN
 ELECTRICAL ROOM ON EACH OF THESE FLOORS
 ON ELECTRICAL PLANS, HOWEVERARCH DO
 NOT SHOW THESE CORRIDORS OF COMMON
 AREAS.?
 PLEASE SEE FLOORS 15 AND 16 ON BOTH A
 AND E'S DO NOT SHOW ANY CORRIDORS AND
 OBTAININGACCESS TO THE ELECTRICAL ROOM
 ON EACH OF THOSE FLOORS ARE ONLY THROUGH
 THE PROPOSED FUTURE TENANT SPACE. PLEASE
 KNOW IT IS NOT KNOWN AT THIS TIME IF
 THERE WILL BE ONE, TWO THREE OR MORE
 TENANTS ON EACH FLOOR AND ACCESS TO EACH
 TENANT?S ELECTRICAL PANEL(S) AND OVER
 CURRENT PROTECTION DEVICES MAY NOT BE
 THROUGH TENANT OCCUPANCY. PLEASE ALSO
 KNOW THE HOUSE POWER/COMMON AREAS MAY
 ALSO NOT BE ACCESSED THROUGH THE
 TENANT?S SPACE.
 PLEASE KNOW, EACH CORRIDOR AS SHOWN ON
 FLOORS 6-14 SHALL BE THE SAME ON ALL
 FLOORS AND SHOULD CORRELATE AS THE SAME
 ON ARCHITECTURAL SHEETS.
 210.25, 215.5, 240.24
  
 11) NOTE: OK.
  
 12) NOTE: OK.
  
 13) NOTE: NO, NOT ALL COULD BE VERIFIED
 AT THIS TIME AS THE MAINS AND LOCATIONS
 OF THE PARALLEL SWITCH GEAR COULD NOT BE
 LOCATE DON PLANS AND MAINS FOR THIS
 EQUIPMENT IS NOT YET VERIFIED TO CONTAIN
 THE MAINS ARE REQUIRED.
  
 ** PREVIOUS REVIEW NOTE **
 PLEASE CLARIFY ALL MAINS AND
 DISTRIBUTION EQUIPMENT CONTAINING ALL
 MAINS, GROUPING ETC PER 230.70, 230.72,
 230.76, 230.79, AND 225.31-225.39
 PLEASE KNOW, DUE TO THE INFORMATION OF
 THE SWITCH GEAR NOT SUBMITTED, SHOWN AND
 WHETHER OR NOT THESE CONTAIN MAINS, WITH
 MANUAL MEANS OF DISCONNECT LOCATED ON
 THE OUTSIDE OF THE EQUIPMENT, GROUPED
 ETC. THE LOCATIONS OF SOME SERVICE
 EQUIPMENT CAN NOT REVIEWED FOR LOCATIONS
 AT THIS TIME.
  
 14) NOTE:NO. SAME NOTE. PLEASE KNOW
 THERE SEEMS TO BE SOME CONFUSION OVER
 THE PREVIOUS COMMENT. PLEASE SEE THE
 MAINS FOR THE EMERGENCY SYSTEM AND
 LEGALLY REQUIRED SYSTEM SHALL NOT BE
 LOCATED IN THE SAME ENCLOSURE AS THE
 NORMAL POWER IN SWBDB.
 PLEASE KNOW THIS OFFICE/CODE OFFICIAL
 WILL NOT ACCEPT THE EMERGENCY MAINS
 LOCATED IN THE SAME EQUIPMENT AND THERE
 WILL BE NO EXCEPTIONS OR SPECIAL
 CONDITIONS GRANTED BY THIS AHJ.
 NFPA-70, 700.12, 701.11, NFPA-110
 CHAPTER 7, 7.2 ETC
 IF A MEETING IS BEING REQUESTED THIS IS
 WILL AND SHOULD BE DONE ONCE ALL REVIEWS
 ARE DONE. IF THE DESIGNER OF RECORD AND
 DESIGN ENGINEER WOULD LIKE TO DISCUSS
 THIS OVER THE PHONE, PLEASE DO NOT
 HESITATE IN CONTACTING THIS OFFICE AS
 DONE ON NUMEROUS OCCASIONS BEFORE THESE
 PLANS WERE SUBMITTED FOR INITIAL REVIEW.
 THIS OFFICE HAS CONSULTED WITH A MR.
 DAVID WORKS ON MANY ITEMS BEFORE
 SUBMITTING PLANS.
  
 ** PREVIOUS REVIEW NOTE **
 PLEASE SEE THE EMERGENCY SYSTEMS ARE
 BEING SHOWN IN THE SAME EQUIPMENT AS THE
 NORMAL MAINS. PLEASE KNOW THESE SHALL
 NOT BE LOCATED IN THE SAME EQUIPMENT AND
 SERVED BY THE SAME SERVICE.
 PLEASE REVISE SERVICE AS SHOWN. 701.1,
 NFPA-110 CHAPTER 7 ETC.
  
 15) NOTE: OK.
  
 16) NOTE: OK.
  
 17) NOTE: OK.
  
 18) NOTE:OK, PLEASE HOWEVER SUBMIT
 THIS ELEVATION FROM THE "SLOSH" CHARTS.
 THIS SHOULD BE OBTAINED FOR RECORD SETS
 OF PLANS.
  
 ** PREVIOUS REVIEW NOTE **
 THE PLEASE PROVIDE THE ELEVATION OF THE
 EM DISTRIBUTION SYSTEM AND EQUIPMENT.
 PLEASE SEE NFPA-110 7.2.3* WHICH
 REQUIRES THE ELEVATION TO MEET THE
 "SLOSH" PREDICTION LEVELS BASED ON A
 CATEGORY 4 STORM.
 THE ELEVATION FOR PROPERTY SHOULD BE OK,
 HOWEVER THIS ELEVATION IS REQUIRED TO BE
 STATED ON PLANS AND VERIFICATION THAT
 ALL REQUIRED EMERGENCY SYSTEMS IS ABOVE.
  
 19) NOTE: NO, PLEASE KNOW THE LIGHTING
 SUBMITTAL PACKAGE MAY BE SUBMITTED AT A
 LATER DATE ALSO. PLEASE KNOW HOWEVER ALL
 FIXTURES AND DETAILED INFORMATION FOR
 SAID FIXTURES WILL BE REQUIRED ON THE
 RECORD SET OF PLANS AT THIS TIME.
  
 ** PREVIOUS REVIEW NOTE **
 PLEASE COMPLETE FIXTURE SCHEDULES AND
 PLEASE CORRELATE ALL FIXTURES AS SHOWN
 ON PLANS WITH THE FIXTURES SCHEDULES
 SUBMITTED.
 215.5
  
 20) NOTE: OK, HOWEVER PLEASE SEE GF
 PROTECTION IS STILL BEING SHOWN FOR 225A
 AND 800A MAINS IN SWBDB. PLEASE SEE
 PREVIOUS COMMENT ABOVE #14 AS THESE WILL
 BE REQUIRED TO BE REMOVED FROM THE
 SWBDB.
  
 ** PREVIOUS REVIEW NOTE **
 PLEASE SEE RISER IS SHOWING GFI
 PROTECTION FOR SOME MAINS???
 PLEASE SEE GF (GROUND FAULT) PROTECTION
 IS REQUIRED PER 240.13, 230.95 ETC,
 HOWEVER PLEASE SEE GFI PROTECTION IS
 PERSONNEL PROTECTION.
 PLEASE SEE PROTECTION IS ALSO BEING
 SHOWN ON ALL SECONDARY OVER CURRENT
 PROTECTION??
 PLEASE KNOW, THIS IS NOT REQUIRED FOR
 THIS STRUCTURE, CLASS AND OCCUPANCY, BUT
 HOWEVER IS PERMITTED.
 PLEASE ALSO SEE GF SEEMS TO BE SHOWN ON
 THE EM SIDE OF THE DISTRIBUTION
 SYSTEM(S) WHICH IS UNCLEAR. PLEASE SEE
 700.7D, 700.26, NFPA-110
 PLEASE SEE THE CODE IS CLEAR WHEN GROUND
 FAULT PROTECTION IS REQUIRED AND WHEN
 SENSING OF SUCH GROUND FAULTS ARE
 REQUIRED , HOWEVER PLEASE KNOW GROUND
 FAULT PROTECTION IS NOT IDEALON THE
 EMERGENCY SIDE DUE TO THE NATURE OF THE
 EMERGENCY DISTRIBUTIONSYSTEM AND THE
 NEED OF MAINTAINING CERTAIN SYSTEMS ON
 DURING AN EMERGENCY.PLEASE KNOW,
 SENSING OF THE GROUND FAULT WOULD BE
 NEEDED TO CORRECT ANY SITUATION IN SUCH
 EQUIPMENT. PLEASE KNOW IT HAS BEEN
 DETERMINED BY THIS AHJ THAT THE GF
 PROTECTION ON THE REQUIRED EM SYSTEMS
 SHOULD NOT BE PROVIDED AND ONLY SENSING
 FOR THE PURPOSE AS STATED AND REQUIRED.
  
 21) NOTE:OK, GROUNDING FOR SEPARATELY
 DERIVED SYSTEM HAS NOW BEEN ADDED.
  
 ** PREVIOUS REVIEW NOTE **
 PLEASE KNOW, 4-POLE ATS SWITCHES ARE
 BEING SHOWN AS REQUIRED TO ACHIEVE THE
 CORRECT GROUND FAULT SENSING, HOWEVER
 THE GENERATORS DO NOT SEEM TO BE
 INDICATED A SEPARATELY DERIVED AS
 REQUIRED.
 250.30, 250.50.
  
 22) NOTE: OK.
  
 23) NOTE:NO, PLEASE PLACE NOTE ON
 PLANS FOR ROOF TOP SHEETS.
 SPEC BOOKS WERE REVIEWED FOR THIS NOTE
 AND INFORMATION IN SPECS IS OK.
  
 ** PREVIOUS REVIEW NOTE **
 PLEASE SEE A NOTE ON PLANS MENTIONS THAT
 A LIGHTNING PROTECTION SYSTEM WILL BE
 REQUIRED.
 PLEASE KNOW, THIS SYSTEM MAY ONLY BE
 INSTALLED BY A CERTIFIED LIGHTNING
 PROTECTION CONTRACTOR WHO CAN CERTIFY
 SUCH A SYSTEM UNDER UL 96 AND NFPA-780.
 THIS SHALL BE A SEPARATE PERMIT, WITH
 PLANS AND FEES.
 PLEASE KNOW HOWEVER A NOTE SHALL BE
 PLACE ON THESE ELECTRICAL PLANS ON ROOF
 TOP PLANS STATING; "ALL OR ANY LIGHTNING PROTECTION
 SYSTEMS SHALL BE INSTALLED
 PER NFPA-780 AND LISTED PER UL 96." THIS
 WORDING SHOULD BE TO THAT SAME AFFECT,
 BUT NOT REQUIRED TO BE STATED AS ABOVE.
 PLEASE KNOW, THIS AHJ DOES NOT ACCEPT
 ANY OTHER SYSTEM NOT ACCEPTED BY
 NFPA-780. PLEASE KNOW THERE ARE MANY
 SYSTEMS ON THE MARKET WHICH CLAIM TO
 "PREVENT" OR "DISSIPATE" LIGHTNING ETC
 WHICH ARE NOT PERMITTED.
  
 24) NOTE: NO, PLEASE SEE NOTE ABOVE WITH
 RESPECT TO COMPLETED PANEL SCHEDULES.
  
 ** PREVIOUS REVIEW NOTE **
 PLEASE SEE 620.23 ABC AND 620.24 ABC
 FOR REQUIRED CIRCUITS AND CONTROLS.
 PLEASE SEE ALL CAN NOT BE VERIFIED AT
 THIS TIME.
  
 25) NOTE: NO, COULD NOT LOCATE
 INFORMATION ON CALCULATIONS AND
 PERMITTED WATTAGE USAGE AND LIGHTING
 POWER DENSITIES.
 PLEASE SEE 13-415.1.AB.1,
 13-415.2.ABC.1, SEE TABLES 415.2.C.1 AND 415.2.B.1.
  
 ** PREVIOUS REVIEW NOTE **
 PLEASE SEE 2004 FBC CHAPTER 13.
 PLEASE SEE 13-413.1.ABC.1 FOR A WORST
 CASE SCENARIO TO BE PROVIDED FOR FEEDERS
 AND BRANCH CIRCUITS.
 PLEASE SEE 13-413.1.ABC.2.2.
 PLEASE SEE 13-415.1.ABC.1.1,
 13-415.1.ABC.1.2, 13-415.1.ABC.1.3 FOR
 LIGHTING AND CONTROLS FOR ALL AREAS.
 PLEASE SEE SOME EXCEPTIONS ARE
 PERMITTED.
 PLEASE SEE OUTSIDE AREAS , TANDEM WIRING
 ETC.
  
 26) NOTE: NO, PLEASE SEE FIRST FLOOR
 FUTURE RETAIL SPACES AS MINIMAL FIXTURES
 COULD NOT BE LOCATED. THIS WAS CONFIRMED
 ONCE AGAIN WITH THE FIRE MARSHAL'S
 OFFICE AND FIRE PREVENTION CHIEF.
 PLEASE SEE ALL AREAS ON OTHER FLOORS
 WERE DONE TO PROVIDE THE MINIMAL
 LIGHTING.
  
 ** PREVIOUS REVIEW NOTE**
 PLEASE SEE MINIMUM LIGHTING FOR EGRESS
 ETC WILL BE REQUIRED INSIDE THE FUTURE
 TENANT BUILD OUT SPACES. THIS HAS ALSO
 BEEN CONFIRMED ALSO WITH THE FIRE
 MARSHAL?S OFFICE AND WILL BE REQUIRED.
 THESE SHOULD BE WIRED INTO THE HOUSE
 PANELS AT THIS TIME AND CAN BE REMOVED
 ONCE TENANT OCCUPANCY TAKES PLACE.
 PLEASE ALSO SEE EXIT LIGHTS.
 IF THESE AREAS ARE OCCUPIED AT ANYTIME
 FOR ANY REASON BEFORE A BUILD OUT HAS
 TAKEN PLACE AND THE POWER GOES OUT,
 MINIMUM LIGHTING SHALL BE PROVIDED TO
 DIRECT ANY SAID OCCUPANTS TO THE EXIT. NFPA-101,7.8,
 7.9.
  
 27) NOTE:OK, SPECS WERE SUBMITTED
 HOWEVER STILL NEED TO VERIFY THE MANUAL
 MEANS OF DISCONNECT LOCATED ON THE
 OUTSIDE OF EQUIPMENT ALONG WITH
 ISOLATING SWITCH ETC. PLEASE SEE THE
 SPECS SUBMITTED DO NOT SEEM TO CONTAIN
 THESE?
 NFPA-20 10.4.2, 2003.
  
 ** PREVIOUS REVIEW NOTE **
 PLEASE SEE PREVIOUS NOTES ABOVE WHICH
 REQUESTED THE MANUFACTURES SPEC/CUT
 SHEETS FOR THE FIRE PUMP AND FIRE PUMP
 CONTROLLER. PLEASE KNOW, THE PLANS SHALL
 INDICATE THE OCP AND LOCKED ROTOR OCP.
 PLEASE SEE RISER NOW SEEMS TO INDICATE
 THE FPC TO BE LISTED ETC. PLEASE KNOW,
 IF THE FCP MEETS NFPA-20 FOR THE
 DISCONNECT MEANS RATED FOR THE LOAD
 SERVED LOCATE ON THE OUTSIDE OF THE
 EQUIPMENT AND CONTAINS THE OVER CURRENT
 PROTECTION SET AT LOCKED ROTOR AS
 REQUIRED BY 695.4B1 AND NFPA-20
 10.4.2,10.4.2.2, 10.3.6, 10.4.4 ETC.
 PLEASE SEE RISER SHOWS AN ADDITIONAL
 800A DISCONNECT LOCATED AHEAD OF THE
 LISTED FPC? PLEASE VERIFY AND CLARIFY
 THIS.
  
 28) NOTE:NO, PLEASE SEE RESPONSE
 LETTER MENTIONS TO SEE SPECS 2.18 FOR
 THIS , HOWEVER SHEETS IN SPEC BOOKS SEEM
 TO CONTAIN A MISSED SHEET OR MISPRINT AS
 THIS SECTION FOR THIS INFORMATION FOR
 NUMERICAL RESPONSE NOTED ABOVE COULD NOT
 BE LOCATED. PLEASE KNOW IN EITHER CASE
 THE AMOUNT OF FUEL SHALL BE STATED ON
 PLANS ALONG WITH THE GPH AND TIME FOR
 ALL LOADS AT 100%. THESE TIMES ARE
 REQUIRED ON THE PLANS.
 FBC 106.1.2
  
 ** PREVIOUS REVIEW NOTE **
 PLEASE SEE FUEL IS REQUIRED PER NFPA-20
 FOR A MINIMUM OF 8HRS AT 100% FOR FIRE
 PUMP AND ALL OTHER ASSOCIATED LOADS,
 INCLUDING ETC.
 6-6.2
  
 29) NOTE: OK. SUB BASE TANK IS PART OF
 THE GEN.
  
 30) NOTE: OK AS NOTED.
  
 31) NOTE: NO, PLEASE SEE PLANS NOW
 MENTION CONDUITS AND MI CABLES AS
 OPTIONS. ?? PLEASE KNOW THE ACTUAL
 INSTALLATION SHALL BE SPECIFIED AT THIS
 TIME. REVISIONS TO THIS MAY BE DONE AT
 LATER DATE ONCE THE PERMIT IS ISSUED.
 PLEASE SEE 700.9D1 AS MENTIONED WHEN
 REQUIRED. PLEASE SEE THIS BUILDING IS
 100% SPRINKLED.
  
 ** PREVIOUS REVIEW NOTE **
 PLEASE VERIFY "MI" CABLES BEING SHOWN
 ON PLANS AND RISER IN MANY LOCATIONS.
 PLEASE KNOW, THIS IS ONLY A NOTE AS THIS INSTALLATION
 FOR MI CABLE IS NOT COMMON
 FOR THIS TYPE OF CABLE. THIS IS
 PERMITTED AND IS IN NO WAY A NOTE FOR
 CORRECTION. THIS IS ONLY NOTED, AS IF
 SHOWN ON PLANS, THIS WILL BE REQUIRED
 AND IN LIEU OF REVISING PLANS AT A LATER
 DATE CHANGES CAN BE MADE IF THESE ARE
 NOT INTENDED.
 PLEASE INDICATE THE CABLE DEGREE
 RATINGS.
  
 32) NOTE:OK, AS MAINS ARE NOW SHOWN ON GENERATORS AND
 GROUNDING RISER DETAILS
 SD SYSTEM.
  
 ** PREVIOUS REVIEW NOTE **
 PLEASE SEE EQUIPMENT GROUNDING
 CONDUCTORS ARE BEING SHOWN FROM THE
 GENERATORS.
 250.30
  
 33) NOTE:OK, THIS INFORMATION ON PLANS
 IS NOW BEING SHOWN. PLEASE KNOW, SPEC
 WERE NOTE ORIGINALLY SUBMITTED.
  
 ** PREVIOUS REVIEW NOTE **
 PLEASE INDICATE THE OCP AT THE
 GENERATORS.
 215.5
  
 34) NOTE:OK, THE SIZES OF THE
 CONDUCTORS ARE NOW VERIFIED AT THIS
 REVIEW AS THE OVER CURRENT PROTECTION IS
 NOW BEING SHOWN ON THE GENERATORS. THIS
 COULD NOT VERIFIED ON PREVIOUS REVIEW AS
 THE OCP WAS NOT SHOWN ON GENERATORS AND
 SPEC BOOKS WERE NOT SUBMITTED.
  
 ** PREVIOUS REVIEW NOTE **
 PLEASE SEE 445.13 FOR MIN SIZES OF THE
 FEEDERS FROM THE GENERATORS.
  
 35) NOTE: NO, PLEASE SEE COMPLETED
 PANELS HAVE NOT BEEN SUBMITTED IN SETS
 FOR REVIEW. PLEASE ALSO SEE CALCULATIONS
 PROVIDED ARE UNCLEAR AS LOADS SHOWN CAN
 NOT BE VERIFIED WITH NEC. PLEASE LOADS
 AS SHOWN DO NOT DETAIL HOW LOADS WERE
 DERIVED. PLEASE ALSO SEE CONTINUOUS
 LOADS AND LARGEST MOTOR LOADS AT 125%
 COULD NOT BE LOCATED.
 WATTS PER SQ FT, KNOWN LOADS ETC.
  
 ** PREVIOUS REVIEW NOTE **
 PLEASE SUBMIT COMPLETE LOAD
 CALCULATIONS FOR THE BUILDING SERVICES
 AND PANELS.
 PLEASE SEE 220,220.3, 220.10, 220.11,
 220.13 ETC.
 PLEASE ALSO INDICATE ALL CONTINUOUS
 LOADS AND LARGEST MOTOR LOADS AT 125%.
 215.3, 230.42 ETC.
  
 36) NOTE: NO, PLEASE PROVIDE MINIMUM
 GUTTER SIZE(S) AT THIS TIME. THIS MAY BE
 REVISED ONCE CONDUITS ENTRIES ARE KNOW
 OR IF THEY ARE CHANGED AT A LATER DATE.
 THIS IS AND WILL BE REQUIRED ON PLANS BY
 THE RESPONSIBLE DESIGNER OF RECORD.
 FBC 106.1.2
  
 * PREVIOUS REVIEW NOTE **
 PLEASE INDICATE THE GUTTER SIZES ON
 RISER. THIS IS REQUIRED AT THIS TIME
 BASED ON THE MINIMUM DIMENSIONS REQUIRED
 FOR TURNING RADIUS AND BASED ON THE CONDUCTORS/FEEDERS
 ARE SHOWN ON RISER.
 368,215.5
  
 37) NOTE: NO. RESPONSE LETTER MENTIONS
 TO SEE TRANSFORMER SCHEDULE WHICH WAS ON
 PREVIOUS PLANS. PLEASE KNOW THE
 GROUNDING ELECTRODE SIZES AS NOTED ON
 TRANSFORMER SCHEDULE WAS NOT PART OF
 THIS NOTE. THE RISER SHOULD SHOW OR NOTE
 THE ATTACHMENT LOCATIONS. PLEASE ALSO
 CORRELATE WITH THE NEXT COMMENT.
  
 ** PREVIOUS REVIEW NOTE **
 PLEASE INDICATE AND SHOW ALL ATTACHMENT
 LOCATIONS FOR THE TRANSFORMERS AS SHOWN
 ON RISER. PLEASE SEE 250.50,250.30,
 250.66 ETC.
  
 38) NOTE: NO. RESPONSE MENTIONS TO SEE
 GROUND RISER ON 3.04, HOWEVER THIS
 DETAIL IS FOR THE GROUNDING ELECTRODE
 SYSTEM. PLEASE SEE PREVIOUS NOTE AS THIS
 WAS TO PROVIDE A "GROUND RISER". THIS IS
 ONE FOR THE ENTIRE BUILDING THROUGH ALL
 FLOORS ETC. PLEASE KNOW THE MINIMUM SIZE
 WILL BE 3/0. PLEASE KNOW, THIS CAN BE
 DONE ON A SEPARATE SHEET AND EXISTING
 RISER DIAGRAM SHEET CAN NOTE TO SEE THIS
 SHEET OR THIS MAY BE PLACED ON THE RISER
 SHEETS IN LIGHT GRAY.
 FBC 106.1.2, NEC 250.58, 250.50 ETC
  
 ** PREVIOUS REVIEW NOTE **
 PLEASE PROVIDE A ONE-LINE GROUND RISER
 ON RISER DIAGRAM OR SEPARATE SHEET.
 250.58, 215.5
  
 39) NOTE: NO. RESPONSE MENTIONS THIS
 REVIEW AND MODIFIED IF NECESSARY. PLEASE
 KNOW THIS IS PART OF THE REVIEW BY THIS
 OFFICE AND IS REQUIRED AT THIS TIME.
 PLEASE ALSO SEE NEW NOTES FOR CHANGES IN
 PLANS FROM FIRST REVIEW.
  
 ** PREVIOUS REVIEW NOTE **
 PLEASE CORRELATE ALL OCP DEVICES FOR
 PANELS ON RISER AND PANELS SCHEDULE WHEN SUBMITTED.
 PLEASE SEE SOME OF THIS ON
 RISER DOES NOT CORRELATE AT THIS TIME
 WITH PANELS AS NOTED.
 215.5
  
 40) NOTE:NO. RESPONSE MENTIONS 250%
 FOR PRIMARY PLUS SECONDARY ETC. PLEASE
 SEE TABLE IN 450.3 WHICH CONTAINS
 (NOTES). PLEASE SEE NOTE BELOW TABLE IN
 ORDER TO USE THE250% ETC.
 PLEASE SEE THE NOTE #3 WHICH IS NEXT TO
 THE 250% IS ATTACHED TO THIS REVIEW.
 THIS IS TAKEN DIRECTLY FROM THE NEC:
 3. A TRANSFORMER EQUIPPED WITH
 COORDINATED THERMAL OVERLOAD PROTECTION
 BY THE MANUFACTURER AND ARRANGED TO
 INTERRUPT THE PRIMARY CURRENT SHALL BE
 PERMITTED TO HAVE PRIMARY OVERCURRENT
 PROTECTION RATED OR SET AT A CURRENT
 VALUE THAT IS NOT MORE THAN SIX TIMES
 THE RATED CURRENT OF THE TRANSFORMER FOR TRANSFORMERS
 HAVING NOT MORE THAN 6
 PERCENT IMPEDANCE AND NOT MORE THAN FOUR
 TIMES THE RATED CURRENT OF THE
 TRANSFORMER FOR TRANSFORMERS HAVING MORE
 THAN 6 PERCENT BUT NOT MORE THAN 10
 PERCENT IMPEDANCE.
  
 ** PREVIOUS REVIEW NOTE **
 PLEASE SEE 450.3 FOR THE MAXIMUM OCP
 FOR TRANSFORMERS TO BE AT 125%. PLEASE
 KNOW, WHEN THE OCP DOES NOT CORRELATE,
 AND THEN IT IS PERMITTED TO GO TO THE
 NEXT SIZE UP, HOWEVER IT IS NOT
 PERMITTED TO GO MORE THAN THE STANDARDS
 OCP PROTECTION DEVICES AS LISTED IN
 240.6.
 PLEASE SEE TRANSFORMERS WHICH INDICATE
 THE OCP SET HIGHER THAN THE MAX 125%.
 215.5
  
 41) NOTE: OK. LT POLES REMOVED.
  
 42) NOTE: NO, COULD NOT LOCATE NOTES AS
 PREVIOUSLY REQUESTED ON PLANS.
 REQUIRED AT THIS TIME ON RECORD SET(S)
 OF PLANS.
 FBC 106.1.2, ETC AS NOTED.
  
 ** PREVIOUS REVIEW NOTE **
 PLEASE KNOW, IT WAS NOTED THAT THE
 RISER DIAGRAM SHEET CONTAINED A NOTED
 FOR SIGNAGE PER 230.2E. PLEASE KNOW
 HOWEVER SIGNAGE, MAPPING SHALL BE
 REQUIRED AT ALL OTHER LOCATIONS; HOWEVER
 MOST IMPORTANTLY BE REQUIRED IN FULL IN
 THE FIRE COMMAND RM.
 PLEASE PROVIDE A NOTE FOR THE SIGNAGE ON
 THE SHEET FOR THE FC ROOM. PLEASE NOTE
 THAT ALL LETTERING SHALL BE A MINIMUM OF
 1? AND ON CONTRASTING BACKGROUND.
  
 43) NOTE:NO, COULD NOT LOCATE THIS
 INFORMATION AND NOTES ON PLANS.
 REQUIRED AT THIS TIME ON RECORD SET(S)
 OF PLANS.
 FBC 106.1.2 ETC AS NOTED.
  
 ** PREVIOUS REVIEW NOTE **
 PLEASE SEE NFPA-72 4.4.1.4.2.2 FOR THE
 REQUIRED DISCONNECTING MEANS FOR THE
 PRIMARY OF THE FIRE ALARM SYSTEM.
 PLEASE ALSO BE SURE ALL ITEMS ARE LISTED
 ON PLANS FOR THE FIRE COMMAND ROOM AS
 SET FORTH IN NFPA-10111.8, 11.8.5
  
 44) NOTE:SAME NOTE AS THE SAME WAS
 DONE ON THE REVIEW.
  
 ** PREVIOUS REVIEW NOTE **
 PLEASE KNOW MANY OF THE ABOVE ITEMS HAVE
 BEEN REDLINED ON ONE OF THE SETS OF
 SUBMITTED PLANS BUT IS IN NO WAY ALL
 POSSIBLE ITEMS AS MENTIONED ABOVE.
  
 45) NOTE: OK, PLEASE DO THE SAME ON NEXT RESPONSE.
  
 ** PREVIOUS REVIEW NOTE **
 PLEASE SEE THAT A TYPE WRITTEN RESPONSE
 FROM THE DESIGN TEAM FOR EACH OF THE
 ABOVE COMMENTS WILL HELP IN EXPEDITING
 THE NEXT REVIEW PROCESS.
  
 ******** NEW NOTES ***********
  
 46) NOTE: PLEASE CORRELATE THE PARALLEL
 SWITCH GEAR RISER/ELEVATION SUBMITTED ON
 E3.03 WITH THAT OF THE OVERCURRENT
 PROTECTION DEVICES AS SHOWN AND LISTED
 ON RISER DIAGRAM.
 FBC 106.1.2
 NOT ON PREVIOUS REVIEW AS INFORMATION ON
 SW GEAR WAS NOTE SHOWN.
  
 47) NOTE: ** IMPORTANT **
 PLEASE SEE FS 471.025 AND FAC
 61G15-23.002 AS THESE REQUIRED UNDER
 FLORIDA LAW THAT THE ENGINEER OF RECORD
 HOLDING SAID LICENSE AND SEAL TO SIGN,
 DATE AND SEAL ALL SAID PLANS. PLEASE
 KNOW THAT THE SIGNING OF PLANS MAY NOT
 BE NOT BE DESIGNATED TO ANYONE OTHER
 THAN THE ENGINEER HOLDING SAID LICENSE.
 PLEASE SEE MECHANICAL, ELECTRICAL,
 PLUMBING AND FIRE ALARM (FA) SHEETS ARE
 NOW SIGNED WITH COMPLETELY DIFFERENT
 SIGNATURES THAN ON PREVIOUS SETS OF
 PLANS. IT IS KNOWN BY THIS OFFICE THAT
 AFTER SIGNING MANY SHEETS THAT A
 SIGNATURE WILL VARY, HOWEVER THESE ARE
 NOT EVEN CLOSE IN RESEMBLANCE OF ONE
 ANOTHER.
 PLEASE SUBMIT SIGNED, DATED AND SEALED
 LETTERS FOR LEGAL SIGNATURE
 VERIFICATION. PLEASE KNOW THESE LETTERS
 SHALL ALSO BE NOTARIZED AS LEGALLY
 REQUIRED IN THE STATE IN WHICH NOTARY IS
 HELD. IF THIS IS DONE IN THE STATE OF
 FLORIDA PLEASE SEE FS 117.05.
 PLEASE ALSO SUBMIT A PHOTO-COPY OF THE
 DRIVER?S LICENSE FOR SAID MEP DESIGNERS
 OF RECORD. PLEASE KNOW PERSONNEL
 INFORMATION SUCH AS THE DL # AND HOME
 ADDRESS MAY BE CROSSED OUT.
 *PLEASE KNOW ONE COMPLETE SET OF PLANS
 OF ORIGINAL SUBMITTED PLANS AND NEW SETS
 ARE BEING RETAINED BY THIS OFFICE.
 PLEASE ALSO KNOW THE "S" SHEETS OF ONE
 SET ARE ALSO BEING RETAINED BY THIS
 OFFICE.
 *PLEASE KNOW THESE PLANS MAY BE
 SUBMITTED TO THE FLORIDA BOARD OF
 PROFESSIONAL ENGINEERS AND THE STATE?S
 LEGAL COUNSEL TO THE BOARD FOR PIER
 REVIEW AND REVIEW OF SAID VIOLATIONS
 INCLUDING INFORMATION AND LICENSURE
 REQUIRED AS NOTED ON PREVIOUS REVIEW.
 NOTE #2 ABOVE.
  
 48) NOTE: PLEASE SEE ENERGY CALCULATIONS
 ARE ALSO REQUIRED TO BE SIGNED, DATED
 AND SEALED BY THE RESPONSIBLE
 DESIGNER/ENGINEER OF RECORD.
 PLEASE SEE ALL SIGNATURES ON THESE
 CALCULATIONS AT THIS TIME DO NOT
 CORRELATE WITH THE SUBMITTED PLANS AS
 NOTED IN NOTE #47 ABOVE.
 PLEASE SEE THIS IS ALSO FOR THE
 ARCHITECT MR. MICHAEL ROSSIN AS THE
 SIGNATURES DO NOT CORRELATE.
  
 49) NOTE: PLEASE SEE SHEET "S"
 SITE/SURVEY IS NOT VALID UNLESS SIGNED,
 DATED AND SEAL AS REQUIRED UNDER FS
 4712.025, FAC 61G1-17
  
 50) NOTE: PLEASE SEE ATTACHED COPY OF
 FLORIDA STATUES 553.80(2)(B) WITH
 RESPECT TO DESIGN PROFESSIONALS AND
 REPEAT CODE COMPLIANT COMMENTS. PLEASE
 KNOW IF PLANS HAVE ANY OF THE SAME CODE
 COMPLIANT COMMENTS NOT ADDRESSED, A 4X
 FEE SHALL BE ASSESSED BASED ON PORTION
 OF PERMIT FEE ATTRIBUTED TO THE PLAN
 REVIEW. PLEASE KNOW THIS PLAN REVIEW
 POSTION IS 30% AND THIS WOULD BE TIMES
 FOUR.
 THIS IS ONLY GIVEN AS A NOTICE AT THIS
 TIME.
  
 PLEASE BE SURE TO ALL SEE ALL COMMENTS
 FROM ALL OTHER TRADES AND THEY MAY
 AFFECT ELECTRICAL PLANS AND DESIGN.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS OR
 COMMENTS, PLEASE DO NOT HESITATE IN
 CONTACTING THIS OFFICE.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-805-6717
 [email protected]
  
2006-07-22 00:00:00REVIEW IN PROGRESS, FOR COMPLETETION
2006-07-17 00:00:00REVIEW IN PROGRESS
 ** REVIEW STOPPED.
 REVIEW TO CONTINUE ON 7/18
 AS OF REVIEW TO THIS TIME, PLANS WILL BE
 GOING INTO A "F" STATUS WITH COMMENTS
 TO FOLLOW ONCE REVIEW HAS BEEN
 COMPLETED.
2006-07-16 00:00:00ONE ROLL OF PLANS IN ELECTRIC FOR
 REVIEW ALONG WITH SPEC BOOKS, SUBMITTALS
 ETC IN BINDERS.
 REVIEW STOPPED, TO CONTINUE ON 7/17


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved