Plan Review Notes
Plan Review Notes For Permit 06040957
Permit Number 06040957
Review Stop E
Sequence Number 19
Notes
Date Text
2008-05-27 09:06:30** DENIED REVIEW **
  
 1) NOTE: PLEASE SUPPLY INFORMATION OR PROVIDE THE
 FOLLOWING DETAILS/CORRECTIONS.
  
 A) FINAL REPORT FOR CIRCUIT BREAKER ENCLOSURE: PLEASE
 COORDINATE AIC RATINGS AS LISTED FOR BREAKER AT
 GENERATOR/OUTPUT AND CIRCUIT BREAKER WITH PLANS
 SUBMITTED AND ON FILE. PLEASE ALSO SEE THE ORIGINAL
 GENERATOR SPECS INDICATE A AIC RATING HIGHER THAN WHAT
 IS NOTED IN REPORT.
 PLEASE ALSO OBTAIN AT LEAST ONE COPY WHICH CONTAINS AN
 ORIGINAL SIGNATURE TO BE PLACED IN FILE OF PROJECT AT
 THE CITY. 110.3, 90.7, FBC 106.1.2, 106.5
  
 B) FINAL REPORT FOR EXHAUST FAN CONTROL PANEL.
 PLEASE OBTAIN AT LEAST ONE COPY WHICH CONTAINS AN
 ORIGINAL SIGNATURE TO BE PLACED IN FILE OF PROJECT AT
 THE CITY. 110.3, 90.7, FBC 106.1.2, 106.5
  
 C) FINAL REPORT FORMODIFIED 3000A TRANSFER SWITCH:
 PLEASE PROVIDE CORRECTIONS ON ITEMS IN SECTION 7 OF UL
 REPORT. PLEASE LIST DATES, TIMES, VERIFICATION WHEN AND
 HOW THESE ITEMS WERE ADDRESSED. THE ITEMS WHICH WERE
 ADDRESSED PRIOR TO THE FINAL UL REPORT NEED ONLY TO BE
 VERIFIED IN FIELD AS THESE ARE ITEMS LISTED AS
 *CORRECTED*.
 PLEASE SEE THERE ARE ITEMS SUCH AS WIRING ON SHARP
 EDGES WHICH DOES NOT STATE WHETHER OR NOT THESE
 CORRECTIONS WERE MADE OR VERIFIED.
 PLEASE ALSO OBTAIN AT LEAST ONE COPY WHICH CONTAINS AN
 ORIGINAL SIGNATURE TO BE PLACED IN FILE OF PROJECT AT
 THE CITY. 110.3, 90.7, FBC 106.1.2, 106.5
  
 D) FINAL REPORT FOR MODIFIED 4000A TRANSFER SWITCH:
 PLEASE OBTAIN AT LEAST ONE COPY WHICH CONTAINS AN
 ORIGINAL SIGNATURE TO BE PLACED IN FILE OF PROJECT AT
 THE CITY. 110.3, 90.7, FBC 106.1.2, 106.5
  
 E) FINAL REPORT FOR BI-FUEL ASSEMBLY ADDED TO UL LISTED
 2200 DIESEL GENERATOR.
 PLEASE KNOW THE APPROVAL OF THIS PRODUCT IS NOT BY THIS
 OFFICE. COMPLIANCE WITH LISTING STANDARD, NFPA-70, AND
 NFPA-110 IS THE RESPONSIBILITY OF THE ENGINEER OF
 RECORD, ELECTRICAL CONTRACTOR, GAS CONTRACTOR AND
 GENERAL CONTRACTOR OF PROJECT. THIS OFFICE WILL ONLY
 VERIFY ITEMS AS NOTED IN REPORT ARE IN FACT LISTED AS
 STATED. PLEASE ALSO OBTAIN AT LEAST ONE COPY WHICH
 CONTAINS AN ORIGINAL SIGNATURE TO BE PLACED IN FILE OF
 PROJECT AT THE CITY. 110.3, 90.7, FBC 106.1.2, 106.5
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR REVIEW. IF
 THERE ARE ANY QUESTIONS OR COMMENTS PLEASE DO NOT
 HESITATE IN CONTACTING THIS OFFICE.
  
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW II
 CONSTRUCTION SERVICES DEPARTMENT
 CITY OF WEST PALM BEACH
 561-805-6717
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved