2007-08-12 13:57:35** PROVISO **
  
 CONDITIONS ISSUED FOR PLANS SUBMITTED, PERMIT FOR BASE
 BUILDING AND EQUIPMENT BEING INSTALLED.
  
 PLEASE SEE THE FOLLOWING SHEETS HAVE BEEN REDLINED WITH
 NOTES TO SEE *PROVISO* AS WILL BE ATTACHED TO THE SHEET
 E0.01.
  
 1) NOTE: PLEASE SEE THAT REVISED GENERATOR SPECS/CUT
 SHEETS AND SUBMITTAL LETTER IS TO BE SUBMITTED. THIS
 HAS NOT BEEN SUBMITTED UNDER THE BASE BUILDING PERMIT
 AND WILL BE REQUIRED BEFORE ISSUANCE OF THE
 GENERATOR(S) PERMIT.
 RESPONSE MENTIONS THAT THE CONTRACTOR HAS ASSURED
 DESIGN THESE WERE SUBMITTED, HOWEVER THESE WERE NOT
 LOCATED ON THIS REVISION OR OTHER PREVIOUS REVISIONS AS
 SUBMITTED. THE DOCUMENTS AS SUBMITTED UNDER THE
 GENERATOR PERMIT APPLICATION WERE NOT COMPLETE.
 PLEASE KNOW THAT THE BI-FUEL UNITS WILL BE REQUIRED TO
 BE LISTED AND INDICATE EPA CERTIFICATION AS AGREED IN
 MEETING WITH DESIGN TEAM REPRESENTATIVE MR. DAVE ALLEN
 PE.
 NEC 110.3, 90.7.
 FBC 106.1.2
  
 2) NOTE: PLEASE SUBMIT REVISED ENERGY CALCULATIONS FOR
 BASE BUILDING AS THE TENANT BUILD OUTS WERE NOT PART OF
 THE BASE BUILDING AND THE ORIGINAL ASSUMPTIONS MAY NO
 LONGER BE USED ONCE A SPECIFIC DESIGN IS SET-FORTH.
 PLEASE REVISE ACCORDINGLY FBC 13-415.1.A, 13-415.1.B
 AND 13-415.1.C.
 13-103.1.1.1
 **THESE ARE REQUIRED TO BE REVISED, SUBMITTED, STAMPED
 AND ON-SITE FOR INSPECTOR BEFORE APPLYING FOR TCO **
  
  
 3) NOTE: PLEASE BE SURE TO REVISE ALL FLOOR LAYOUTS AND
 LOAD CALCULATIONS WITH THE SPECIFICS TO EACH FLOOR AND
 ALL LOADS FROM BUILD OUTS WITH KNOWN LOADS.
 PLEASE SEE THAT MANY FLOORS WILL BE REVISED DUE TO
 TENANT BUILD OUTS.
 **THESE ARE REQUIRED TO BE REVISED, SUBMITTED, STAMPED
 AND ON-SITE FOR INSPECTOR BEFORE APPLYING FOR TCO **
  
 4) NOTE: REDLINED NOTE ON E0.03, AS THE NOTE STILL
 STATES *ALL* DUCT BANKS ARE TO CONTAIN SAND* THIS IS
 NOT THE CASE AS SOME ARE CONCRETE ENCASED.
 NO CORRECTION IS NEEDED AS THIS WAS ONLY REDLINED AND
 NOTED.
  
  
 ** PLEASE KNOW THAT THE ABOVE NO WAY INDICATES THAT ALL
 OTHER TYPES OF REVISIONS SHOULD, NEED OR ONLY NEED BE
 SUBMITTED BEFORE TCO. THERE MAY BE SEVERAL CHANGES ON
 SITE WHICH WILL STILL BE REQUIRED TO BE SUBMITTED
 DURING THE PROJECT.
  
 **THE CONDITIONS WITH THE CONSTRUCTION BOARD OF APPEALS
 ARE REQUIRED TO BE MET FOR PROJECT FOR ALL AS APPLIED
 BY THE CONTRACTOR/OWNER/DEVELOPER FOR EACH FLOOR OF
 THIS BUILDING.
  
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW II
 CONSTRUCTIONS SERVICES DEPARTMENT
 CITY OF WEST PALM BEACH
 561-805-6717
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved