| Date |
Text |
| 2006-05-01 00:00:00 | DENIED |
| | REFERENCE: FBC-2004 PLUMBING |
| | |
| | FOUNDATION PLUMBING PERMIT |
| | |
| | 1. SHT P-1 1" DRAIN FROM METAL PAN ABOVE |
| | ELECTRICAL ROOM STILL SHOWN. METAL PAN |
| | HAS BEEN REMOVED. PLEASE CLARIFY. |
| | SECTION 106.1.1. |
| | |
| | 2. SUBMIT A STORM RISER DIAGRAM THAT |
| | REFLECT THE PIPING SHOWN ON SHT P-10 AND |
| | ALL RWL RISERS. SHOW ALL PIPE SIZES, |
| | SLOPE OF PIPE ETC. SECTION 106.1.5.1.3. |
| | |
| | 3. SHT P-15 GREASE WASTE ISOMETRIC |
| | DIAGRAM RISER FLOOR SINK REQUIRED AT P/5 |
| | DOWNSTREAM OF HUB DRAIN TO REFLECT THE |
| | FLOOR PLAN. SECTION 106.1.1. |
| | |
| | 4. SEE COMMENTS 5, 7, 9, 15, 17, 18, 19, |
| | AND 31 FROM SECOND REVIEW OF BUILDING |
| | PERMIT APPLICATION FOR ISSUES THAT MAY |
| | AFFECT THE PIPING IN THE FIRST FLOOR |
| | SLAB. |
| | |
| | 5. SECTION 105.13 THE HOLDER OF A PHASED |
| | PERMIT FOR THE FOUNDATION OR OTHER PARTS |
| | OF A BUILDING OR STRUCTURE SHALL PROCEED |
| | AT THE HOLDER'S OWN RISK WITH THE |
| | BUILDING OPERATION AND WITHOUT ASSURANCE |
| | THAT A PERMIT FOR THE ENTIRE STRUCTURE |
| | WILL BE GRANTED. CORRECTIONS MAY BE |
| | REQUIRED TO MEET THE REQUIREMENTS OF THE |
| | TECHNICAL CODES. |
| | |
| | REVIEW BY KEN STEVENS |
| | (561) 805-6721 |
| | FAX (561) 805-6731 |
| | E-MAIL [email protected] |
| | |
| | |
| | |