| Plan Review Notes For Permit 06040854 |
| Permit Number |
06040854 |
|
| Review Stop |
E |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2006-05-05 00:00:00 | | | | | | | | | | THE VALUE ON THE APPLICATION MUST | | | INCLUDE THE TOTAL COST OF LABOR AND | | | MATERIAL FOR THE GENERATOR , EQUIPMENT | | | (TRANSFER SWITCHES, PANELS ETC.)AND PAD | | | PER 108.3 FBC AS AMMENDED. | | | | | | PLEASE SUBMIT A SITE PLAN AND LOCATE ALL | | | THE SERVICE AND GENERATOR GEAR ON SAME | | | SO THAT COMPLIANCE WITH | | | 230.72(GROUPING), 225.31-39 FOR THE | | | DISCONNECTING MEANS REQUIREMENTS AND | | | 250.32 FOR GROUNDING CAN BE REVIEWED. | | | | | | BILL TROBAUGH | | | ELECTRICAL PLAN REVIEW | | | 561/805-6718 | | | [email protected] | | | FAX/:561/659-8026 |
|