| Date |
Text |
| 2006-04-12 00:00:00 | BUILDING REVIEW CHECKLIST: |
| | 1- ACCORDING TO THE DESCRIPTION ON THE |
| | PERMIT APPLICATION THE PROPOSED SCOPE OF |
| | WORK INCLUDES AN ADDITION. |
| | ADDITION WORK IS ANOTHER TYPE OF PERMIT, |
| | IS NOT A ROOFING PERMIT, AND REQUIRES |
| | COMPLETE SET OF STRUCTURAL DRAWINGS |
| | SHOWING ALL PROPOSED WORK AS REQUIRED BY |
| | SEC. 106.1.2 CITY AMENDMENTS TO FBC 2004 |
| | AND FBC 2004. |
| | |
| | 2- COMMENTS REGARDING TAMCO FLAT ROOF |
| | SYSTEM: |
| | A) CLEARLY IDENTIFY FLAT ROOF SYSTEM |
| | TO BE INSTALLED TO VERIFY COMPLIANCE |
| | WITH THE DESIGN PRESSURES AND GENERAL |
| | LIMITATION OF SELECTED ASSEMBLY. |
| | B) IF SELECTED ASSEMBLYIS LIMITED BY |
| | GENERAL LIMITATION #7, THEN SIGNED AND |
| | SEALED CALCULATIONS BY ANY OF THE |
| | PROFESSIONALS LISTED IN GENERAL |
| | LIMITATION #7 WILL BE REQUIRED. SEE |
| | GENERAL LIMITATION #7 ON THE LAST PAGE |
| | OF THE PRODUCT APPROVAL REPORT. |
| | C) IF SELECTED ASSEMBLY IS LIMITED BY |
| | GENERAL LIMITATION #9, THEN ASSEMBLY |
| | CAN'T BE USED IN THIS AREA BECAUSE |
| | DESIGN PRESSURES ARE TOO LOW FOR THIS |
| | AREA AND THEY CAN'T BE ENHANCED BY |
| | CALCULATIONS TO INCREASE THE DESIGN |
| | PRESSURES. SEE GENERAL LIMITATION #9 ON |
| | LAST PAGE OF REPORT. |
| | |
| | 3- PROJECT VALUATION DECLARED ON THE |
| | PERMIT APPLICATION IS TOO LOW. UPDATE |
| | PROJECT VALUATION TO INCLUDE LABOR AND |
| | MATERIALS OR IT WILL BE ESTIMATED AS |
| | REQUIRED BY SECTION 108.3 CITY |
| | AMENDMENTS TO FBC 2004. |
| | |
| | 4- NEED RECORDED NOTICE OF COMMENCEMENT. |
| | |
| | JULIO GOMEZ |
| | BUILDING PLANS EXAMINER |
| | (561)805-6712 |