| Date |
Text |
| 2006-04-24 00:00:00 | |
| | PLEASE MAKE THE FOLLOWING CORRECTIONS |
| | FOR CODE COMPLIANCE AND RESUBMIT FOR |
| | REVIEW. |
| | |
| | 1} PLEASE SUBMIT ALL EQUIPMENT |
| | SPECIFICATIONS, GENERATOR AND TRANSFER |
| | SWITCH. IF THESE SPECS ARE GENERIC BE |
| | SURE TO HIGHLIGHT OR OTHERWISE INDICATE |
| | THE MODELS INTENDED TO BE USD. |
| | |
| | 2} THE PLANS ARE NOT CLEAR. ONE SHEET |
| | INDICATES 2-200 AMP DISCONNECTS, FROM |
| | THE GENERATOR, FEEDING ATS'S, ANOTHER |
| | SHOWS 2-200 AMP DISCONNECTS FROM A |
| | GUTTER FEEDING THEM, WITH THE GENERATOR |
| | SIDE FEED NOT SHOWN.AND ANOTHER SHEET |
| | SHOWING 3-100 AMP PANELS OR DISCONNECTS |
| | (PLAN DOESN'T SAY), NOT FEEDING |
| | ANYTHING, APPARANTLY FED FROM THE SAME |
| | GUTTER AS THE 2-200 AMP DISCONNECTS ON |
| | THE PREVIOUS PAGE. |
| | |
| | PLEASE SUBMIT A SITE PLAN SHOWING ALL |
| | THIS EQUIPMENT AND WHAT IT FEEDS. |
| | |
| | 3} THE HEAT LOAD ISN'T IN THE LOAD CALC. |
| | PLEASE INCLUDE, IF SMALLER THAN THE |
| | CONDENERLOADS , PLEASE INDICATE SAME. |
| | |
| | 4} THE VALUE ON THE APPLICATION MUST |
| | INCLUDE THE VALUE, LABOR AND MATERIAL OF |
| | THE ENTIRE INSTALLATION, INCLUDING THE |
| | GENERATOR, PAD AND ATS. |
| | |
| | IF THERE ARE ANY QUESTIONS PLEASE CALL. |
| | |
| | BILL TROBAUGH |
| | ELECTRICAL PLAN REVIEW |
| | 561/805-6718 |
| | [email protected] |
| | FAX/:561/659-8026 |