| Date |
Text |
| 2006-05-14 00:00:00 | ONE ROLL IN ELEC FOR REVIEW, |
| | ******** UNSAT 2ND REVIEW ******* |
| | |
| | **FAIRFIELD INN/SUITES, FIRST REVIEW |
| | UNDER 2004 FBC. |
| | |
| | ** PLEASE KNOW, PLANS ARE NOT COMPLETE |
| | AT THIS TIME FOR A COMPLETE REVIEW FOR |
| | CODE COMPLIANCE. |
| | |
| | |
| | ** PLEASE KNOW, PLANS ORIGINALLY CAME IN |
| | UNDER THE 2001 FBC AND NOW PLANS ARE |
| | SUBMITTED UNDER THE 2004 FBC. PLEASE SEE |
| | MOST OF THE COMMENTS ARE NEW, HOWEVER |
| | SOME ARE FROM PREVIOUS REVIEW. |
| | |
| | ** PLEASE BE SURE TO COMPLETELY REMOVE |
| | ANY OLD/VOIDED SHEETS FROM SETS AND ONLY |
| | INSERT NEW REVISED SHEETS INTO COMPLETE |
| | SETS FOR REVIEW AND STAMPING. |
| | |
| | |
| | 1) NOTE: PLEASE SEE ADDRESSING FOR |
| | PROJECT SHOULD BE ON TITLE BLOCK FOR |
| | LOCATION OF PROJECT. |
| | FAC61G1-16.004, 61G15-23.002 |
| | |
| | 2) NOTE: PLEASE CLARIFY TITLE BLOCK ON |
| | COVER SHEETS AND ALL TRADE SHEETS. |
| | PLEASE ALSO SEE STUCTURAL, MECHANICAL |
| | AND PLUMBING SHEETS AS THESE DO NOT |
| | CONTAIN ANY TITLE BLOCKS FOR THE |
| | ENGINEERS OR ENGINEERING FIRMS AS LISTED |
| | ON COVER SHEETS. |
| | ** PLEASE SEE A PRINT OUT FROM THE |
| | STATE'S WEBSITE IS NOW ATTACHED TO |
| | NOTES, AS THE CERTIFICATE OF |
| | AUTHORIZATION NUMBER AS INDICATE ON |
| | TITLE BLOCKS FOR ARCHITECTURAL FIRM IS |
| | "NULL AND VOID" PER DEPARTMENT OF |
| | BUSINESS AND PROFESSIOAL REGULATION. |
| | PLEASE SEE ELECTRICAL SHEETS DO NOT |
| | INDICATE THIS AND LIST THE ENGINEER AS |
| | AN INDIVIDUAL? |
| | PLEASE SEE FAC 61G15-23.002, FS 471.023, |
| | IF ARCHITECTURAL FIRM IS OFFERING |
| | ENGIEERING SERVICES, PLEASE PROVIDE |
| | CERTIFICATE OF AUTHORIZATION FOR THIS. |
| | THE CA # WAS ADDED FOR ARCHITECTURAL |
| | FIRM AS REQUESTED ON PREVIOUS REVIEW |
| | HOWEVER AS NOTED ABOVE, SEEMS NOT BE |
| | ACTIVE. |
| | ** PLEASE SEE TITLE BLOCKS ARE MISSING |
| | THE PRINTED NAME AND LICENSE NUMBER THE |
| | ARCHITECT AS REQUIRED PER FAC |
| | 61G1-16.004 |
| | |
| | ** PLEASE BE SURE ALL THREE SETS ARE |
| | SIGNED, DATED AND SEALED AS REQUIRED |
| | UNDER FS 481.221,471.025, FAC |
| | 61G1-16,61G15-23.002 |
| | PLEASE SEE MANY SHEETS IN SOME SETS ARE |
| | NOT SIGNED OER SEALED. PLEASE ALSO SEE |
| | SOME ROLLS SUBMITTED ARE NOT SIGNED AND |
| | SEALED AT ALL?? |
| | *************************************** |
| | **THIS IS FOR ALL TRADES AND FOR ALL |
| | REVIEWS, WHETHER OR NOT COMMENT IS MADE |
| | BY OTHER REVIEWER(S). |
| | ************************************** |
| | |
| | 3) NOTE: PLEASE SEE FP SHEETS, AS SOME |
| | SHEETS IN SOME SETS ARE PHOTO-COPIES OF |
| | SIGNED AND SEALED PLANS. |
| | |
| | 4) NOTE: PLEASE KNOW, PLANS ARE NOW |
| | BEING SUBMITTED UNDER THE 2004 FBC, |
| | HOWEVER NO CHANGES IN ELECTRICAL DESIGN |
| | WERE MADE TO THE NEW 2004 CHAPTER 13. |
| | PLEASE SEE CHAPTER 13, 13-413.1ABC.1, |
| | PLEASE PROVIDE ALL WORST CASE CALCS, AND |
| | ADJUST AS NEEDED FOR LONGEST RUNS. |
| | PLEASE SEE 13-415.1.ABC.1.1, &.2, & .3 |
| | WHICH GREATLY AFFECT ELECTRICAL DESIGN. |
| | COULD NOT LOCATE ANY INFORMATION FOR |
| | THIS ON PLANS.? |
| | PLEASE SEE ALL OTHER CHANGES IN CHAPTER |
| | 13. FIXTURE TYPES, TANDEM WIRING ETC. |
| | |
| | 5)NOTE: PLEASE PROVIDE COMPLETE |
| | PHOTO-METRICS FOR ALL EGRESS |
| | AREAS/PATHS. |
| | PLEASE SEE NFPA-101 2003, 7.8.1.3, |
| | 7.9.2.2. PLEASE SEE STAIRS FOR EGRESS |
| | SHALL CONTAIN A MIN OF 10FT CANDLES AVG |
| | UNDER NORMAL CONDITIONS AND 1FT CANDLE |
| | AVG UNDER EM POWER. |
| | PLEASE SEE MIN REQUIRED FOR ALL OTHER |
| | PATHS SHALL BE 1FT CANDLE. |
| | PLEASE ALSO KNOW, AN EM BATTERY BACK UP |
| | FIXTURE OF SOME TYOE WILL BE REQUIRED IN |
| | THE MAIN ELECTRICAL ROOM. |
| | ** PLEASE SEE NOTES ON PLANS MENTIONS |
| | THE 10 FT CANDLES AT "WAIST LEVEL"? |
| | PLEASE SEE NFPA-101, AS THIS IS MEASURED |
| | AT THE WALKING SURFACE. |
| | |
| | 6) NOTE:PLEASE SEE THE FOLLWOING WAS |
| | ALSO NOTED ON PREVIOUS REVIEW NOTE #15. |
| | PLEASE SEE NO INFORMATION WAS SUBMITTED |
| | FOR THE FIRE PUMP, FIRE PUMP CONTROLLER. |
| | PLEASE KNOW, ALL PLANS AND INFORMATION |
| | FOR THIS SHALLBE SUBMITTED. |
| | PLANS NOW INDICATE A FIRE PUMP LOCATED |
| | IN A DETACHED BUIDLING? WHICH WILL FEED |
| | TWO DIFFERENT HOTELS. |
| | PLEASE KNOW, APPROVAL BY THE FIRE |
| | MARSHAL'S OFFICE SHALL FIRST BE OBTAINED |
| | FOR THIS SCENERIO. PLEASE ALSO KNOW, |
| | PERMIT FOR EITHER BUILDING CAN NOT BE |
| | PASSED FOR PERMITING UNTIL ALL |
| | INFORMATION, PLANS ETC FOR FIRE PUMP, |
| | FIRE PUMP CONTROLLER CAN BE REVIEWED. IF |
| | ELECTRICAL DRIVEN FIRE PUMP, PLEASE |
| | PROVIDE ALL INFORMATION. |
| | PLEASE SEE FP SEEMS TO INDICATE |
| | ELECTRICAL FIRE PUMP.PLEASE SEE THIS |
| | FIRE PUMP IS STILL BEING SHOWN BEING FED |
| | FROM THE MSB WHICH IS NOT PERMITTED AS |
| | STATED IN PREVIOUS NOTES. PLEASE SEE |
| | 695.4 NEC, NFPA-20 2002. |
| | PLEASE KNOW, THIS INFORMATION WILL BE |
| | REQUIRED UNDER THIS PERMIT. THE FIRE |
| | SPRINKLER AND FIRE ALARM ARE ALSO UNDER |
| | A SEPARATE PERMIT.MININUM INFORMATION IS |
| | REQUIRED FOR THE PERMIT ISSUANCE OF EACH |
| | HOTEL. |
| | |
| | 7) NOTE: PLEASE SEE PLANS ARE NOW |
| | INDICATING A BACK UP GENERATOR OF SOME |
| | SORT? IF ANY PART OF THIS SYSTEM IS |
| | GOING TO BE INSTALLED, PLEASE SUBMIT ALL |
| | INFORMATION FOR ATS, GENERATOR, |
| | ELECTRICAL RISER, SUB BASE FUEL ETC. |
| | PLEASE SEE TWO SEPARATE ATS'S ARE BEING |
| | SHOWN ON PLANS AT THIS TIME, HOWEVER |
| | THIS IS NOTBEING SHOWN WIRED INTO |
| | RISER? |
| | PLEASE KNOW, IF NO PART OF THIS SYSTEM |
| | IS GOING TO BE INSTALLED AT THIS TIME, |
| | PLEASE REMOVE FROM PLANS AS LONG AS ALL |
| | MIN LIFE SAFETY BACK UP SYSTEMS ARE |
| | PROVIDED BY OTHER MEANS. |
| | ** |
| | PLEASE SUBMIT ALL MANUFACTURE CUT |
| | SHEETS/SPEC FOR GEN, ATS'S, FIRE PUMP, |
| | FIRE PUMP CONTROLLER, AND ANY FUEL TANKS |
| | FOR ITEMS BEING INSTALLED. |
| | |
| | 8) NOTE: PLEASE SEE PANEL "P" ON SHOWS |
| | MCB AS REQUIRED, YET PANEL SCHEDULE |
| | SHOWS THIS PANEL AS "MLO". PLEASE KNOW, |
| | THIS PANEL IS NOT SHOWN ON PLANS AND |
| | COULD NOT BE LCOATED?? IS THIS IN A |
| | DETACHED STRUCTURE? PLEASE KNOW A MEANS |
| | OF DISCONNECT WILL BE REQUIRED PER |
| | 225.31 AND ALL GROUNDING SHALL BE |
| | INDICATED PER 250.32 |
| | |
| | 9) NOTE: PLEASE SEE GROUNDING ELECTRODE |
| | CONDUCTOR ON RISER IS SHOWN AS 1/0? |
| | PLEASE SEE MIN SHALL BE SIZED PER |
| | 250.66. PLEASE SEE GROUNDING DETAIL |
| | SUBMITTED INDICATE 1/0 AND 3/0?? |
| | PLEASE CORRELATE WITH MIN REQUIRED. |
| | |
| | 10) NOTE: PLEASE PROVIDE REFERENCES TO |
| | THE FOLLOWING CODES ON ELECTRICAL PLANS. |
| | NFPA-101 2003, NFPA-70 2002, NFPA-72 |
| | 2002, NFPA-110 2002, NFPA-20 2002. |
| | ** PLEASE SEE REPSONSE MENTIONS TO SEE |
| | COVER SHEET FOR CORRECTED CODES, HOWEVER |
| | PLEASE SEE COVER SHEETS REFERENCE A |
| | "2003" NEC? PLEASE SEE WE ARE UNDER 2002 |
| | AND A 2003 IS NOT IN ISSUE. (MISPRINT)? |
| | |
| | 10) NOTE: PLEASE INDICATE ALL ELECTRICAL |
| | PANELS ON ALL SHEETS FOR POWER.PLEASE |
| | SEE ELECTRICAL ROOMS ARE BEING SHOWN |
| | WITH EGRESS THORUGH "MAIDS CLOSETS". |
| | THIS WILL NOT BE PERMITTED. MAY NOT |
| | ACCESS ELECTRICAL ROOMS THROUGH STORAGE |
| | CLAOSETS OF ANY TYPE. |
| | PLEASE SEE ALL EGRESS SHALL CONTAIN A |
| | CLEAR AND UN-OBSTRUCTED PATH OF TRAVEL. |
| | 110.26,408.7,240.24 ETC |
| | |
| | 11) NOTE: PLEASE SEE PLANS FOR "LARGE |
| | SCALECOMMERCIAL AREA" ARE NOT |
| | COMPLETE. PLEASE SEE MISSING LAYOUT FOR |
| | AREAS LOCATED ON THE FIRST FLR.? |
| | PLEASE COMPLETE SETS AND PLANS. 215.5 |
| | |
| | 12) NOTE: PLEASE SEE 210.8B3 FOR |
| | KITCHENS, SEE ALL RECEPTS 15/20A 120 V |
| | SHALL BE GFI/GFI PROTECTED. |
| | PLEASE SEE MOST AREAS WERE DONE, HOWEVER |
| | PLEASE SEE ALL AREAS ARE REQUIRED. |
| | PREVIOUS REVIEW COMMENT. |
| | |
| | 13) NOTE: PLEASE SEE GUEST RMS WHICH ARE |
| | BEING NOTED AS SUITES/DWELLINGS AND |
| | ROOMS. |
| | PLEASE SEE 210.60,210.52 PLEASE ADJUST |
| | ALL CIRCUITING AND LOAD CALCULATIONS, |
| | PANELS ON PLANS. |
| | 215.5 |
| | |
| | 14) NOTE: PLEASE SUBMIT WIND LOAD |
| | CALCUALTIONS FOR SITE LIGHTING POLES AS |
| | REQUESTED ON PREVIOUS REVIEW. THIS COULD |
| | NOT BE LOCATED ON SITE LIGHTING PLANS? |
| | 215.5 |
| | |
| | 15) NOTE: PLEASE SEE A PREVIOUS NOTE |
| | MENTIONED THE USE OF A SHUNT TRIP |
| | BREAKER AND THE MCB STILL BEING REQUIRED |
| | TO HAVE A MANUAL MEANS OF DISCONNECT |
| | LOCATED ON THE OUTSIDE RATED RATED FOR |
| | THE LOAD SERVED. 230.76,230.79 ETC. |
| | PLEASE SEE PLANS SHALL INDICATE A |
| | MANUALS MEANS, ETC. |
| | ** PLEASE ALSO SEEPLANS INDICATE A |
| | "SERVICE MAIN" LOCATED OUTSIDE HOWEVER |
| | THIS IS NOT INCLUDED IN RISER? |
| | 215.5 |
| | |
| | 16) NOTE: PLEASE INDICATE PANELS AS |
| | "FEEDE-THRU" AS PANEL BOARDS SHALL NOT |
| | CONTAIN MORE THE 42 SPACES.408.15 |
| | PLEASE SEE ALL PANELS ON UPPER FLRS. |
| | |
| | 17) NOTE: PLEASE SEE A/C UNIT IN ROOMS |
| | CONSIDERED TO MEET DWELLING UNIT BEDRMS |
| | SHALL ALSO MEET 210.12B NEC. 2002 |
| | |
| | 18) NOTE: PLEASE SEE NOTES ON RISER AS |
| | THESE WILL BE AFFECTED BY REVISONS ON |
| | PLANS. |
| | |
| | 19) NOTE: PLEASE SEE FIRE REVIEW |
| | COMMENTS FOR STRETCHER ACCESSIBLE ELEV. |
| | |
| | 20) NOTE: PLEASE SUBMIT HP RATINGS OF |
| | ELEVATOR MOTORS, UNABLE TO VERIFY AT |
| | THIS TIME. NO HP RATING SOR SIZES |
| | SUBMITTED. |
| | 215.5 |
| | |
| | 21) NOTE: PLEASE SEE CIRCUITES FOR |
| | ELEVATOR EQUIPMENT DOES NOT CORRELATE |
| | WITH MSB>. |
| | 215.5 |
| | |
| | 22) NOTE: PLEASE ALSO CORRELATE |
| | SERVICE MAIN. |
| | PLEASE SEE RISER IDENTIFIES MAIN AS MSB |
| | AND SCHEDULE SHOWS MDP? |
| | PLEASE KEEP IN MIND THE PREVIOUS NOTE |
| | WIH RESPECT TO THE PLANS ALSO INDICATING |
| | A "MAIN SERVICE DISC" OUTSIDE? |
| | 215.5 |
| | |
| | 23) NOTE: PLEASE SEE A PANEL "EG" IS |
| | SHOWN ON PANEL SCHEDULES, HOWEVER NOT |
| | INFORMATION ON RISER FOR THIS?: |
| | PLEASE SEE THIS IS ALSO ON PLANS, |
| | HOWEVER THERE IS NOT ENOUGH INFORMATION |
| | FOR THIS PANEL, ATS ETC. |
| | 215.5 |
| | |
| | 24) NOTE: PLEASE SEE PANEL 1A SHOWS |
| | CIRCUITED TO MSB W/ 100A OCP, YET |
| | MSB/MDP LIST THIS WITH 125A OCP?? PLEASE |
| | CORRELATE. |
| | |
| | |
| | ** PLEASE KNOW, BASED ON THE PLANS AND |
| | INFORMATION SUBMITTED THERE MAY BE OTHER |
| | COMMENTS AS A COMPLETE REVIEW FOR CODE |
| | COMPLIANCE COULD NOT BE DONE AT THIS |
| | TIME. |
| | PLEASE BE SURE TO SEE ALL OF THE 2004 |
| | FBC CHAPTER 13 FOR ELECTRICAL CHANGES. |
| | |
| | ** PLEASE KNOW, ONE SET OF PLANS ARE |
| | BEING RETAINED. |
| | |
| | ** PLEASE SEE ANY OTHER COMMENTS FROM |
| | OTHER TRADES WHICH MAY AFFECT ELECTRICAL |
| | PLANS. |
| | |
| | PLEASE SUBMIT THE ABOVE INFORMATION FOR |
| | REVIEW. IF THERE ARE ANY QUESTIONS, |
| | PLEASE DO NOT HESITATE IN CONTACTING |
| | THIS OFFICE. |
| | |
| | DEWEY PALMER |
| | ELECTRICAL PLAN REVIEW |
| | 561-805-6717 |
| | [email protected] |