| | 1) 104.6.5 BUILDING PERMIT VALUATION. IF |
| | IN THE OPINION OF THE BUILDING OFFICIAL |
| | THE CLAIMED VALUATION OF BUILDING, |
| | ALTERATION, STRUCTURE, ELECTRICAL, |
| | GAS,MECHANICAL OR PLUMBING SYSTEMS |
| | APPEARS TO BE UNDERESTIMATED ON THE |
| | APPLICATION, THE PERMIT SHALL BE DENIED, |
| | UNLESS THE APPLICANT CAN SHOW DETAILED |
| | ESTIMATES AND/OR BONA FIDED SIGNED |
| | CONTRACTS (EX-CLUDING LAND VALUE) TO |
| | MEET THE APPROVAL OF THE BUILDING |
| | OFFICIAL. FOR PERMITTING |
| | PURPOSES, VALUATION FOR BUILDINGS AND |
| | SYSTEMS SHALL BE FOUND IN MARSHALL AND |
| | SWIFT OR THE SOUTHERN BUILDING CODE |
| | CONGRESS INTERNATIONAL VALUATION TABLES, |
| | LATEST EDITION, AND SHALL BE BASED ON |
| | TOTAL REPLACEMENT VALUE TO INCLUDE |
| | STRUCTURAL, ELECTRIC, PLUMBING, |
| | MECHANICAL, INTERIOR FINISH, NORMAL SITE |
| | WORK (EXCAVATION AND BACKFILL FOR |
| | BUILDINGS), ARCHITECTURAL AND DESIGN |
| | FEES, OVERHEAD AND PROFIT, EXCLUDING |
| | ONLY LAND VALUE. |
| | |
| | 2) A DOOR AND WINDOW SCHEDULE IS |
| | REQUIRED SHOWING THE SIZE AND TYE OF |
| | EACH DOOR AND WINDOW ETC.FBC 106.3.5 |
| | |
| | 3) EACH PRODUCT APPROVAL IS REQUIRED TO |
| | HAVE THE UP-DATED STATE COVER SHEET TO |
| | MATCH THE INSTALLATION INSTRUCTIONS OR |
| | NOA. THOSE PRODUCT APPROVALS WHICH ARE |
| | REGULATED BY DCA RULE 9B-72 SHALL BE |
| | REVIEWED AND APPROVED IN WRITING BY THE |
| | DESIGNER OF RECORD PRIOR TO SUBMITTAL |
| | FOR JURISDICTIONAL APPROVAL.WPB |
| | AMMENDMENT TO FBC 106.3.3 |
| | FOR INFORMATION PLEASE SEE THE STATE |
| | WEBSITE AT WWW.FLORIDABUILDING.ORG. |
| | PRODUCTS WITH STATEWIDE APPROVAL ARE |
| | REQUIRED TO BE SUBMITTED WITH A COVER |
| | SHEET THAT LISTS THE PRODUCT IDENTITY |
| | NUMBER FROM THE STATE. |
| | |
| | 4) ALL WINDOWS AND GLAZED DOORS WHICH |
| | ARE NON-INPACT SHALL HAVE HURRICANE |
| | PROTECTION. 1609.1.4 PROTECTION OF |
| | OPENINGS. IN WIND-BORNE DEBRIS REGIONS, |
| | EXTERIOR GLAZING THAT RECEIVES POSITIVE |
| | PRESSURE IN THE LOWER 60 FEET (18.3 M) |
| | IN BUILDINGS SHALL BE ASSUMED TO BE |
| | OPENINGS AND THE BALANCE OF GLAZED |
| | OPENINGS IN THE REST OF THE BUILDING |
| | SHALL BE ASSUMED TO BE ZERO UNLESS SUCH |
| | GLAZING THAT RECEIVES POSITIVE PRESSURE |
| | IS IMPACT RESISTANT OR PROTECTED WITH AN |
| | IMPACT RESISTANT COVERING MEETING THE |
| | REQUIREMENTS OF SSTD 12, ASTM E 1886 AND |
| | ASTM E 1996, OR MIAMI-DADE TAS 201, 202 |
| | AND 203 REFERENCED THEREIN AS FOLLOWS: 1 |
| | GLAZED OPENINGS LOCATED WITHIN 30 FEET |
| | (9.1 M) OF GRADE SHALL MEET THE |
| | REQUIREMENTS OF THE LARGE MISSILE TEST. |
| | 2.GLAZED OPENINGS LOCATED MORE THAN 30 |
| | FEET (9.1 M) ABOVE GRADE SHALL MEET THE |
| | PROVISIONS OF THE SMALL MISSILE TEST. |
| | |
| | 5) THE DISCRIPTION ON THE APPLICATION |
| | DOES NOT MENTION ANY ROOFING WORK. |
| | HOWEVER, THERE IS A SET OF PRODUCT |
| | APPROVAL IN THE PACKAGE FOR A MODIFIED |
| | ROOF SYSTEM. IF THE ROOF WILL BE |
| | REPAIRED INDICATE ON THE PERMIT |
| | APPLICATION THE SQUARE FOOTAGE OF THE |
| | ROOF. SELECT OR HI-LIGHT THE APPROVED |
| | SYSTEM WHICH WILL BE USED. SEE ROOFING |
| | PROCEDURE IN THE PACKAGE. NOTE: A DETAIL |
| | DEESCRIPTION OF THE WORK IS REQUIRED ON |
| | THE APPLICATION. THERE IS NO MENTION OF |
| | THE BUILDING BEING STUCCOED ON THE |
| | APPLICATION. PLEASE ALTER THE |
| | DESCRIPTION ON THE APPLICATION TO MATHC |
| | THE SCOPE OF WORK FOR OUR RECORDS. |
| | |
| | MYRON JACOBS |
| | BUILDING PLAN REVIEWER |
| | TEL:(561)805-6726 |
| | FAX:(561)805-6731 |