| 2006-04-10 00:00:00 | PROJECT: 1400 VILLAGE BLVD. BLDG.#7 |
| | |
| | SCOPE OF WORK: |
| | |
| | EXPLORATORY/SELECTIVE DEMOLITION AND |
| | REPAIR OF 3-STORY APARTMENT BUILDING AS |
| | PER SUBMITTED ENGINEERING |
| | PLANS/CALCULATIONS. |
| | |
| | PLAN REVIEW NOTES: |
| | |
| | 1)THE PROPOSED WORK/REPAIRS SHALL NOT |
| | MAKE THE BUILDING LESS CONFORMING TO THE |
| | BUILDING,MEP'S OR THE FIRE CODES OF THE |
| | JURISDICTION, OR TO ALTERNATIVE |
| | MATERIALS,DESIGN AND METHODS OF |
| | CONSTRUCTION, OR ANY PREVIOUSLY APPROVED |
| | PLANS, MODIFICATIONS,ALTERNATIVE METHODS |
| | OR COMPLIANCE ALTERNATIVES, THAN IT WAS |
| | BEFORE THE REPAIR WAS UNDERTAKEN AS PER |
| | THE FLORIDA EXISTING BUILDING CODE, |
| | SECTION 401.3. |
| | |
| | 2)407.3: DAMAGED BUILDINGS |
| | SHALL BE REPAIRED IN ACCORDANCE WITH |
| | THIS SECTION. |
| | 407.3.1: NEW STRUCTURAL FRAME MEMBERS |
| | USED IN THE REPAIR OF DAMAGED BUILDINGS, |
| | INCLUDING ANCHORAGE AND CONNECTIONS, |
| | SHALL COMPLY WITH THE FLORIDA BUILDING |
| | CODE,BUILDING. |
| | |
| | 3)407.3.2.1.1:EXTENT OF REPAIR. AFTER |
| | THE BUILDING IS REPAIRED THE EVALUATION |
| | AND ANALYSIS SHALL DEMONSTRATE THAT THE |
| | BUILDING ONCE REPAIRED, COMPLIES WITH |
| | THE WIND PROVISIONS OF THE FLORIDA |
| | BUILDING CODE, BUILDING. |
| | |
| | 4)OTHER UNCOVERED STRUCTURAL ELEMENTS. |
| | WHERE IN THE COURSE OF CONDUCTING |
| | REOAIRS OTHER UNCOVERED STRUCTURAL |
| | ELEMENTS ARE FOUND TO BE UNSOUND OR |
| | OTHERWISE STRUCTURALLY DEFICIENT, SUCH |
| | ELEMENTS SHALL BE MADE TO CONFORM TO THE |
| | REQUIREMENTS OF SECTION 407.3.2.1.1. |
| | |
| | 5)SUBMIT A LIFE SAFETY/SAFEGUARDS DURING |
| | CONSTRUCTION PLAN:FBC,EXISTING 1303.1. |
| | |
| | CONSTRUCTION EQUIPMENT AND MATERIALS |
| | SHALL BE STORED AND PLACED SO AS NOT TO |
| | ENDANGER THE PUBLIC FOT THE DURATION OF |
| | THE PROJECT AS PER FBC,EXISTING SECTION |
| | 1301.2. |
| | PROVIDE PEDESTRIAN PROTECTION AS PER FBC |
| | 1303.2 |
| | 1310.2 MAINTENANCE OF EXITS. REQUIRED |
| | MEANS OF EGRESS SHALL BE MAINTAINED AT |
| | ALL TIMES DURING |
| | CONSTRUCTION,DEMOLITION,REMODELING OR |
| | ALTERATIONS AND ADDTIONS TO ANY |
| | BUILDING. |
| | |
| | PROVISO: |
| | |
| | 1)REQUIRE CLARIFICATION OF THE |
| | FOLLOWING: |
| | |
| | A)INDICATE TWISTED STRAP TYPE |
| | TO BE UTILIZED;SEE SHEET 3,DETAIL |
| | S-2. |
| | |
| | B)MECHANICAL ATTACHMENT OF THE 2X |
| | BASE PLATE TO EXISTING CONCRETE |
| | SLAB:SEE DETAIL 2/S-2. |
| | |
| | C)PLAN INDICATES R-19 AND R-11 BATT |
| | INSULATION WITHIN THE FRAMED WALLS. |
| | |
| | |