2006-12-20 14:56:40ONT: ROONEY CENTEX CONSTRUCTION
 TEL: (561)478-0381
  
  
 FL BLD CODE= 2004 FLORIDA BUILDING CODE
 * 2004 WEST PALM BEACH AMENDMENTS
 CHAPTER 1 OF FBC
  
 ACTION: BUILDING PROVISO
  
 -----NOTE-----
  
 THIS PERMIT APPLICATION IS FOR THE MTC
 (MARINE TECHNOLOGIES CENTER) BUILDING.
  
  
 1) BUILDING PROVISO: 109.3.10* IMPACT OF CONSTRUCTION.
 ALL
 CONSTRUCTION ACTIVITY REGULATED BY THIS
 CODE SHALL BE PERMORMED IN A MANNER SO
 AS NOT TO ADVERSLY IMPACT THE CONDITION
 OF ADJACENT PROPERTY, UNLESS SUCH
 ACTIVITY IS PERMITTED TO AFFECT SAID
 PROPERTY PURSUANT TO A CONSENT BY THE
 APPLICABLE PROPERTY OWNER, UNDER TERMS & CONDITIONS
 AGREEABLE TO THE APPLICABLE
 PROPERTY OWNER.THIS INCLUDES BUT IS NOT
 LIMITED TO THE CONTROL OF DUST, NOISE,
 WATER OR DRAINAGE RUN-OFF, DEBRIS, AND
 THE STORAGE OF CONSTRUCTION MATERIALS.
 NEW CONSTRUCTION ACTIVITY SHALL NOT
 ADVERSELY IMPACT HISTORICSURFACE WATER
 DRAINAGE FLOWS SERVING ADJACENT
 PROPERTIES, & MAY REQUIRE SPECIAL
 DRAINAGE DESIGNCOMPLYING WITH
 ENGINEERING STANDARDS TO PRESERVE THE
 POSITIVE PATTERNS OF THE AFFECTED SITES.ACCORDINGLY,
 DEVELOPERS,
 CONTRACTORS, AND OWNERS OF ALL NEW
 RESIDENTIAL DEVELOPMENET, INCLUDING
 ADDITIONS, POOLS, PATIOS, DRIVEWAYS,
 DECKS, OR SIMILAR ITEMS, ON EXISTING
 PROPERTIES RESULTING IN A DECREASE IN
 EXCESS OF 800SQ FT OF PERMEABLE LAND
 AREA ON ANY PARCELL SHALL AS A PERMIT
 CONDITION, PROVIDE A PROFESSIONALY
 PREPARED DRAINAGE PLAN CLEARLY
 INDICATING COMPLIANCE WITH THIS
 PARAGRAPH. UPON COMPLETION OF THE
 IMPROVEMENT, A CERTIFICATE FROM A
 LICENSED ENGINEER SHALL BE SUBMITTED TO
 THE INSPECTOR IN ORDER TO RECEIVE
 APPROVAL OF THE FINAL INSPECTION.
  
 2) BUILDING PROVISO: 109.3.10.1 HURICANE PROTECTION. IT
 SHALL BE UNLAWFUL FOR ANY PERSON TO
 ALLOW CONSTRUCTION RELATED MATERIALS
 EQUIPMENET AND DEBRIS TO REMAIN LOOSE OR
 OTHERWISE UNSECURED AT A CONSTRUCTION
 SITE FROM 24 HRS. AFTER A HURRICANE
 WATCH HAS BEEN ISSUED UNTIL THE
 HURRICANE WATCH OR WARNING HAS BEEN
 LIFTED. ALL SUCH CONSTRUCTION MATERIALS,
 EQUIPMENT AND DEBRIS SHALL BE EITHER
 REMOVED FROM THE CONSTRUCTION SITE OR
 SECURED IN SUCH A MANNER AS TO MINIMIZE
 THE DANGER OF SUCH CONSTRUCTION
 MATERIALS, EQUIPMENT AND DEBRIS CAUSING
 DAMAGE TO PERSONS OR PROPERTY FROM
 HIGHWINDS.
 ANY PERSONS WHO FAILS TO COMPLY TO
 REMOVE OR SECURE THE CONSTRUCTION
 MATERIALS EQUIPMENT AND DEBRIS WITHIN
 24 HRS AFTER A HURRICANE WATCH HAS BEEN
 ISSUED SHALL BE SUBJECT TO A FINE NOT TO
 EXCEED $500.00.
 IN ADDITION TO THE ABOVE, A LICENSED
 CONTRACTOR WHO VIOLATES THIS SECTION
 SHALL BE SUBJECT TO DISCIPLINE PURSUANT
 TO SECTION 113 OF THIS CHAPTER.
  
 3) THISPERMIT FOR THIS PROJECT WAS FOR UNITS 3 & 4
 ELECTRIC GEAR BUILDING ONLY.
  
 BUILDING PLAN REVIEW
 JIM WITMER
 TEL: (561)805-6715
 FAX: (561)659-8026


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved