| Date |
Text |
| 2006-06-19 00:00:00 | 1. CONSTRUCTION, DEMOLITION, AND |
| | RENOVATION TO COMPLY WITH NFPA 241. |
| | |
| | 2. SUITABLE ROADS ARE TO PROVIDED DURING |
| | CONSTRUCTION FOR FIRE AND PARAMEDICAL |
| | EQUIPMENT. |
| | |
| | 3. WET FIRE HYDRANTS ARE REQUIRED PRIOR |
| | TO, DURING, AND AFTER CONSTRUCTION. |
| | |
| | 4. PLEASE INDICATE HOW FIRE RESCUE |
| | ENTERS THROUGH THE ROLL GATE FENCE. WHAT |
| | SECURITY OR LOCKING ARRANGEMENTS WILL BE |
| | PRESENT AND IS A KNOX-BOX BEING |
| | PROPOSED. |
| | |
| | 5. PRIVATE FIRE SERVICE MAINS AND |
| | HYDRANTS SHALL COMPLY WITH NFPA 24. THE |
| | STANDARD FOR PRIVATE FIRE SERVICE MAINS |
| | AND THEIR APPURTENANCES. |
| | |
| | 6. NEW PRIVATE FIRE HYDRANTS TO COMPLY |
| | WITH UTILITY AND FIRE RESCUE STANDARDS. |
| | |
| | 7. FIRE HYDRANT # 8 SHOULD BE RELOCATED |
| | IN FRONT OF GATE OR FENCE OPENING. |
| | |
| | 8. ALL FIRE HYDRANTS SHALL BE PROVIDED |
| | WITH SEVEN AND HALF FEET CLEARANCE TO |
| | THE FRONT AND SIDES AND FOUR FEET TO THE |
| | REAR OF THEM. (PAGE C-21) |
| | |
| | 9. ALL PAVEMENT ROAD SYSTEMS SHALL BE |
| | CAPABLE OF SUPPORTING 32 TONS FOR FIRE |
| | EQUIPMENT. |
| | |
| | 10. ELECTRONIC SWITCHES, CHAIN AND LOCK |
| | ARE REQUIRED ON FIRE LINE BACKFLOW |
| | DEVICES. |
| | |
| | 11. SEPERATE PLANS AND PERMITS REQUIRED |
| | FOR FIRE SPRINKLER AND FIRE ALARM |
| | SYSTEM. |
| | |
| | 12. FIRE DEPARTMENT CONNECTIONS (FDC'S) |
| | SHALL BE LOCATED NO FARTHER THAN 150 |
| | FEET FROM FIRE HYDRANTS. |
| | |
| | 13. ALL FIRE DEPARTMENT CONNECTIONS |
| | (FDC'S) SHALL BE POSITIONED SO THEY |
| | CANNOT BE BLOCKED BY STORAGE, VESSELS, |
| | EQUIPMENT, ETC. |
| | |
| | 14. BUILDING ADDRESSES REQUIRED ON |
| | PROPER ELEVATIONS. A MINIMUM OF AT LEAST |
| | 6" HIGH NUMBERS WITH 1" WIDTH SHALL BE |
| | PROVIDED. |
| | |
| | 15. KNOX-BOXES WILL BE REQUIRED. |
| | |
| | 16. NO ILLUMINATED EXIT SIGNS OR |
| | EMERGENCY LIGHTS SHOWN FOR COVERED WORK |
| | SHED VESSEL AREAS. |
| | |
| | 17. PLEASE INDICATE ANY AND ALL |
| | HAZARDOUS MATERIALS PLANNED TO BE STORED |
| | AT THE NEW FACILITY. THESE MATERIALS |
| | INCLUDE FLAMMABLE AND COMBUSTIBLE |
| | LIQUIDS, CORROSIVES, OXIDIZERS, |
| | FLAMMABLE GASES, POSIONS, ETC. |
| | |
| | 18. WHERE WILL FLAMMABLE LIQUIDS, |
| | SOLVENTS, ETC. PLANNED TO BE STORED. |
| | |
| | 19. WHAT TYPE OF WORK IS PLANNED TO BE |
| | PERFORMED WHERE THE VESSELS ARE TO BE |
| | STORED. |
| | |
| | 20. NO FIRE RATED DOORS SHOWN ON DOOR |
| | SCHEDULE. IS THERE NO FIRE RATING FOR |
| | BAYS 15 AND 16 LOCATED DIRECTLY IN FRONT |
| | OF THE VESSEL FIT UP AREA. |
| | |
| | 21. WHERE IS THE FIBERGLASS AND GELCOAT |
| | MATERIALS PLANNED TO BE STORED OR |
| | UTILIZED. |
| | |
| | 22. NEW FIRE ALARM SYSTEM SHALL MEET THE |
| | REQUIREMENTS OF BEING MONITORED BY A |
| | LICENSED UL LISTED CENTRAL STATION |
| | APPROVED FOR CENTRAL STATION SERVICE. |
| | |
| | MIKE CARSILLO, CHIEF FIRE PREVENTION |
| | OFFICER |
| | 804-4709 |