| 2006-04-17 00:00:00 | 1) CONSTRUCTION DOCUMENTS SHALL BE OF |
| | SUFFICIENT CLARITY TO INDICATE THE |
| | LOCATION, NATURE AND EXTENT OF THE WORK |
| | PROPOSED AND SHOW IN DETAIL THAT IT WILL |
| | CONFORM TO THE PROVISIONS OF THIS CODE |
| | AND RELEVANT LAWS, ORDINANCES, RULES AND |
| | REGULATIONS, AS DETERMINED BY THE |
| | BUILDING OFFICIAL (SEE ALSO SECTION |
| | 106.3.5). |
| | |
| | 2) SUBMIT A WINDOW SCHEDULE OF ALL THE |
| | WINDOWS WHICH WILL BE CHANGED. INCLUDE |
| | IN THE SCHEDULE THE NUMBER OF WINDOWS, |
| | THE SIZES AND THE LOCATION OF EACH |
| | WINDOW. THIS INFORMATION SHALL BE ON A |
| | DRAWING LAYOUT OF THE BUILDING. |
| | |
| | 3) THE PRODUCT APPROVAL FOR THE WINDOWS |
| | HAS NOT BEEN APPROVED BY THE STATE AS OF |
| | TODAY. THIS PRODUCT IS STILL PENDING |
| | APPROVAL. ALSO THE STATE COVER SHEETS |
| | AND THE NOC DOES NOT MATCH EACH OTHER. |
| | SUBMIT AN APPROVED AND UPDATED PRODUCT |
| | FOR WINDOWS. |
| | |
| | 4) THE APPLICATION STATES METAL SIDING |
| | REPLACEMENT,HOWEVER THE PRODUCT APPROVAL |
| | SUBMITTED IS METAL ROOFING. IS THE ROOF |
| | BEING REPLACE OR IS IT THE METAL SIDING? |
| | IF IT IS THE METAL SIDING,SUBMIT THE |
| | PRODUCT APPROVAL FOR THE METAL SIDING. |
| | THE PRODUCT APPROVALS SHALL BE OF THE |
| | 2004 CODE VERSION. SUBMIT A DRAWING OF |
| | THE BUILDING SHOWING WHERE THE SIDING |
| | WILL BE REPLACED. IF IT'S THE ROOF BEING |
| | REPAIRED SEE THE ROOFING PROCEDURE IN |
| | PACKAGE. ALSO STATE IF THE PANELS WILL |
| | BE APPLIDE TO SOLID DECK. THE |
| | INFORMATION FOR THE METAL SIDING OR ROOF |
| | PANELS SHALL BE OF THE 2004 CODE |
| | VERSION. THE ROOFING INFORMATION NEEDS |
| | TO INDICATE THE DESIGN PRESSURES OF THE |
| | ROOF. |
| | |
| | NOTE: IF THE WORK MENTION IN THE |
| | APPLICATION EXCEEDS $25000, A LICENSED |
| | CONTRACTOR WILL HAVE TO PERFORM THAT |
| | WORK. |
| | |
| | MYRON JACOBS |
| | BUILDING PLAN REVIEWER |
| | TEL:(561)805-6726 |