| Plan Review Notes For Permit 06030125 |
| Permit Number |
06030125 |
|
| Review Stop |
B |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2006-03-08 00:00:00 | BUILDING REVIEW 3RD CHECKLIST: | | | 1- ENGINEER CALCULATIONS ON SHEET #6 OF | | | 6 SHOWS ATTACHMENTS FOR ZONE 1 AND ZONE | | | 3 TO BE THE SAME. ON THE OTHER HAND, | | | ZONE 2 SAYS THAT FASTENING IS GOOD TO A | | | MAXIMUM DESIGN PRESSURE OF -105PSF. | | | CLARIFY WHAT ARE THE MAXIMUM DESIGN | | | PRESSURES SUPOSSED TO BE RESISTED AT | | | ZONE 3.IF -105PSF IS THE MAXIMUM | | | DESIGN PRESSURE THAT THE ROOFING | | | MATERIAL CAN RESIST, THEN THIS PRODUCT | | | DOESN'T WORK FOR THE PROPOSED | | | INSTALLATION. | | | | | | JULIO GOMEZ | | | BUILDING PLANS EXAMINER. | | | (561)805-6712 |
|