| Date |
Text |
| 2007-02-12 13:06:02 | |
| | |
| | NONCOMPLIANT |
| | |
| | PLEASE MAKE THE FOLLOWING CORRECTIONS FOR CODE |
| | COMPLIANCE AND RESUBMIT FOR REVIEW. |
| | |
| | 1}THE EQUIPMENT GROUNDING CONDUCTOR MUST COMPLY WITH |
| | 250.66. SEE NOTE #1 REGARDING THE SUM OF THE SERVICE |
| | ENTRANCE CONDUCTORS:SIZE OF LARGEST UNGROUNDED |
| | SERVICE-ENTRANCE CONDUCTOR OR EQUIVALENT AREA FOR |
| | PARALLEL CONDUCTORSA (AWG/KCMIL)-250 MCM LATERAL= #2 |
| | CU, OR PARALLEL 2/0 CONDUCTORS @0.137 X 2=0.274 |
| | EQUIVALENT 300 MCM, WHICH WOULD ALSOREQUIRE A #2 |
| | GEC. |
| | |
| | 2} THE GEC IS REQUIRED TO BE CONTINUOUS TO THE NEUTRAL |
| | BOND PER 250.64. IT HAS NOW BEEN REMOVED FROM THE METER |
| | AND TWO GEC'S HAVE BEEN INSTALLED IN THE DISCONNECTS, |
| | BREAKING THE CONTINUOUS BOND. THIS COULD BE RESOLVED BY |
| | PUTTING THE GEC IN THE METER ENCLOSURE. |
| | |
| | 3} THE #1/0 CONDUCTORS BEING RAN FROM THE METER TO THE |
| | 200 AMP DISCONNECTS ARE NOT IN COMPLIANCEWITH |
| | 310.15(B)(6) WHICH REQUIRE A 2/0 MINIMUM. SAME COMMENT |
| | FOR THE FEEDERS FROM THE DISCONNECT TO THE PANELS. |
| | |
| | 3} THE #6 EQUIPMENT GROUNDS BEING RAN TO THE |
| | DISCONNECTS FROM THE METER PARALLEL THE NEUTRAL AND |
| | MUST BE REMOVED.THEY ARE OK FROM THE DISCONNECTS TO THE |
| | PANELS. |
| | |
| | 4} THE 60 AMP POOL DISCONNECT IS LOCATED AT A SEPARATE |
| | STRUCTURE BY DEFINITION ARTICLE 100, AND THEREFORE |
| | NEEDS A GEC INSTALLED AT THAT LOCATION PER 250.32. THIS |
| | WAS REDLINED ON THE 4/06 PLAN. |
| | |
| | IF THERE ARE ANY QUESTIONS PLEASE CALL. |
| | |
| | BILL TROBAUGH |
| | ELECTRICAL PLANS EXAMINER |
| | CITY OF WEST PALM BEACH |
| | 561/805-6718 |