| 2006-03-14 00:00:00 | ****** UNSAT ********** |
| | |
| | |
| | 1)NOTE: PLEASE SEE AN "EQUIPMENT |
| | GROUNDING CONDUCTOR" IS NOT INSTALLED |
| | UNTIL AFTER THE FIRST MEANS OF |
| | DISCONNECT. PLEASE SEE 250.6 THE |
| | GROUNDING OF ELECTRICAL SYSTEMS, CIRCUIT |
| | CONDUCTORS, SURGE ARRESTERS, AND |
| | CONDUCTIVE NON?CURRENT-CARRYING |
| | MATERIALS AND EQUIPMENT SHALL BE |
| | INSTALLED AND ARRANGED IN A MANNER THAT |
| | WILL PREVENT OBJECTIONABLE CURRENT OVER |
| | THE GROUNDING CONDUCTORS OR GROUNDING |
| | PATHS. |
| | |
| | 2)NOTE: PLEASE SEE PANEL SCHEDULE AND |
| | CONDUCTORS FOR SERVICESEEM TO INDICATE |
| | THAT THE SERVICE WILL BE A SINGLE PHASE |
| | INSTALLATION. PLEASE SEE ONLY THREE |
| | CONDUCTORS ARE COMING FROM METER TO MCB |
| | PANEL, YET LOAD CALCULATIONS MENTIONS |
| | THE SERVICE BEING 120/208V 3-PHASE. |
| | PLEASE SEE LOAD CALCUALTIONS ARE DONE TO |
| | SINGLE PHASE?? |
| | PLEASE CORRELATE ALL OF THE ABOVE. |
| | 215.5. IF 3-PHASE, PLEASE ADJUST CALCS |
| | AND CONDUCTORS. |
| | |
| | 3)NOTE: PLEASE SEE PLANS MENTIONS NEW |
| | CEILING LT, HOWEVER NO CEILING OR |
| | STRUCTURE COULD B E LOCATED. |
| | |
| | 4)NOTE: PLEASE SUBMIT SIGNED,DATED AND |
| | SEALED ENGINEERED WIND LOAD CALCULATIONS |
| | FOR POLES WITH LT FIXTURES. THESE ARE |
| | REQUIRED AT THIS TIME AND WILL BE |
| | REVIEWED BY THE STRUCTUAL PLANS |
| | REVIEWER. PLEASE SEE MIN NDESIGN SHALL |
| | MEET FBC 2004 140MPH. |
| | |
| | PLEASE SUBMIT THE ABOVE INFORMATION FOR |
| | REVIEW. IF THERE ARE ANY QUESTIONS, |
| | PLEASE DO NOT HESITATE IN CONTACTING |
| | THIS OFFICE. |
| | |
| | DEWEY PALMER |
| | ELECTRICAL PLAN REVIEW |
| | 561-805-6717 |