| Plan Review Notes For Permit 06020258 |
| Permit Number |
06020258 |
|
| Review Stop |
E |
| Sequence Number |
3 |
|
| Notes |
| Date |
Text |
| 2007-04-23 09:21:17 | | | | | | | REVISION DENIED/INCOMPLETE INFORMATION. | | | | | | THE RISER NOW HAS TWO ATS SERVING TWO 200 AMP PANELS. | | | BECAUSE OF THE SYSTEM CHANGE THE FOLLOWING IS | | | REQUIRED. | | | | | | 1} PROVIDE A LOAD CALCULATION FOR THE | | | LOAD INTENDED TO BE SERVED. 215.5. THE RISER NOW HAS | | | TWO ATS SERVING TWO 200 AMP PANELS. | | | | | | 2} PROVIDE A PANEL SCHEDULE FOR THE | | | GENERATOR PANEL(S). 106.3.5.4 FBC AS | | | AMENDED. | | | | | | 3} THE PERMITTED GENERATOR WAS A 40 KW. THE REVISION | | | INDICATES A 45KW. IF A GENERATOR OTHER THAN THE ONE ON | | | THE PERMITTED SET OF PLANS IS TO BE INSTALLED, SUBMIT | | | SPECIFICATIONS FOR SAME, | | | | | | 4} PROVIDE SPECIFICATIONS FOR THE ADDED TRANSFER | | | SWITCH. | | | | | | 5} PLEASE LOCATE ALL SERVICE AND GENERATOR EQUIPMENT ON | | | A SITE PLAN, NOT THE SURVEY, METER ENCLOSURE, | | | DISCONNECTS, ATS AND PANELS, SO THAT COMPLIANCE WITH | | | ARTICLES 225 AND 230 CAN BE REVIEWED. | | | | | | 6} THE VALUE ON THE APPLICATION MUST | | | INCLUDE THE TOTAL COST OF LABOR AND | | | MATERIAL FOR THE GENERATOR, EQUIPMENT | | | (TRANSFER SWITCHES, PANELS ETC.) | | | AND PAD PER 108.3 FBC AS AMENDED. | | | INCREASE THE VALUE AT THE COUNTER WHEN RESUBMITTING, | | | AND GET A RECEIPT FROM THE | | | PERMIT CLERK. | | | | | | IF THERE ARE ANY QUESTIONS PLEASE CALL. | | | | | | BILL TROBAUGH | | | ELECTRICAL PLAN REVIEW | | | 561/805-6718 | | | [email protected] |
|