2006-03-02 00:00:00********* UNSAT *********
  
 1)NOTE: PLEASE SEE BLDG REVIEW COMMENTS
 AS DETAIL FOR SLAB SHALL BE SIGNED,
 DATED AND SEALED. FS 481.221, 471.023
  
 2)NOTE: PLEASE SEE CURRENT CODES NEED TO
 BE REFERENCED ON PLANS. PLEASE SEE THAT
 WE ARE CURRENLTY UNDER THE 2004 FBC,
 2003 NFPA-101, 2002 NFPA-110, 2002
 NFPA-70
  
 3)NOTE: PLEASE SEE BLDG REVIEW COMMENTS
 WITH RESPECT TO BFE.
 PLEASE SEE NFPA-110 7.2.3*
 PLEASE NOTE AND VERIFY THE LOCATION OF
 GENERATOR.
  
 4)NOTE: PLEASE SUBMIT ALL MANUFACTURE
 SPECS/CUT SHEETS FOR GEN, ATS, SUB BASE
 FUEL TANK, WP HOUSING.
 THE ONLY SPEC SUBMITTED WAS FOR THE
 GENERATOR WHICH INDICATES AND INDOOR
 UNIT. ASSUBMITTED, GEN IS SHOWN AS
 54KW/KVA, WHERE-AS THE PERMIT
 APPLICATION MENTIONS 60KW??
 PLEASE CORRELATE.
  
 5)NOTE: PLEASE SEE EXISTING MCB IS SHOWN
 ON ROOF???
 PLEASE VERIFY AS THIS IS NOT READILY
 ACCESSIBLE AS REQUIRED PER 230.70,PLEASE
 SEE MAINS ARE NOT GROUPED PER 230.72,
 225.34.
  
 6)NOTE: PLEASE SEE VALUATION IS BASED ON
 COMPLETE SCOPE PF WORK WHICH IS TO
 INCLUDE ALL LABOR AND MATERIALS, EVEN OF
 ANY EQUIPMENT IS OWNER SUPPLIED. VALUE
 AS SHOWN IS WAY LOW AND MAY BE ADJUSTED
 BY THIS OFFICE IF AN APPROPRIATE VALUE
 IS NOT INCREASED.
 THIS IS TO BE INCREASED WHEN
 RESUBMITTING PLANS AFTER ALL REVIEWS ARE
 COMPLETED.
  
 7)NOTE: PLEASE SUBMIT THE INTENDED LOADS
 FOR GENERATOR. GEN MUS BE SIZED FOR
 LOADS SERVED.
 220, 215.5
  
 ** PLEASE SEE COMMENTS FROM OTHER TRADES
 WHICH MAY AFFECT ELECTRICAL PLANS.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-805-6717
 [email protected]
2006-03-01 00:00:00IN ELEC FOR REVIEW.


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved