| Plan Review Notes For Permit 06010340 |
| Permit Number |
06010340 |
|
| Review Stop |
B |
| Sequence Number |
3 |
|
| Notes |
| Date |
Text |
| 2006-02-02 00:00:00 | BUILDING REVIEW THIRD CHECKLIST: | | | 1- SAME COMMENT FROM SECOND CHECKLIST: | | | SELECTED FLAT ROOF SYSTEM IS LIMITED TO | | | A MAXIMUM DESIGN PRESSURE OF -45PSF AND | | | BY GENERAL LIMITATION #9, WHICH DOESN'T | | | ALLOW ADDITIONAL NAIL ENHANCING TO | | | INCREASE THE DESIGN PRESSURES. | | | | | | 2- A) ENGINEERED CALCULATIONS SUBMITTED | | | ARE NOT ALLOWED BECAUSE OF GENERAL | | | LIMITATION #9 OF ROOF ASSEMBLY SELECTED. | | | ENGINEERED CALCULATIONS CAN ONLY BE | | | PROVIDED WHEN GENERAL LIMITATION #7 | | | APPLIES. | | | | | | B) ENGINEER TO CLEARLY IDENTIFY EXACT | | | ROOF ASSEMBLY THAT IS REFERENCED IN THE | | | PRODUCT APPROVAL WHEN SUBMITTING THE | | | CALCULATIONS. | | | | | | JULIO GOMEZ | | | BUILDING PLANS EXAMINER | | | (561)805-6712 |
|