| 2006-08-14 00:00:00 | DENIED: |
| | ORIGINAL REVIEW BY RON REGUEIRO DATED |
| | 2/7/06.THE FOLLOWING COMMENTS NEED |
| | FURTHER CLARIFICATION: |
| | |
| | COMMENT 1:DUCT SMOKE DETECTOR SHALL BE |
| | INSTALLED IN THE SUPPLY AIR DUCT PER |
| | 2004 FMC 606.2.1.PLAN SHEET M-1 THE |
| | HVAC UNIT SCHEDULE NOTE 6 STILL |
| | INDICATES THE SMOKE DETECTOR IN THE |
| | RETURN AIR DUCT.PLEASE REVISE. |
| | |
| | COMMENT 2:OK |
| | COMMENT 3:OK |
| | |
| | COMMENT 4:PLAN SHEET M-3 THE GROUND |
| | FLOOR PLAN INDICATES THE SUPPLY, RETURN |
| | AND EF-2 DUCTS PENETRATING THE FLOOR |
| | CEILING ASSEMBLY.PLAN SHEET A7.1 & |
| | A9.0 INDICATE DUCTS IN A 1HR SHAFT |
| | ENCLOSURE AND SHALL COMPLY WITH 2004 FMC |
| | 607.5.5.1 OR SHOW COMPLIANCE WITH |
| | 2004 FMC 607.6.1, WHERE DUCTS PENETRATE |
| | A FIRE-RESISTANCE-RATED FLOOR/CEILING |
| | THAT CONNECTS MORE THAN 2 STORIES, A |
| | SHAFT ENCLOSURE IS NOT REQUIRED PROVIDED |
| | A FIRE DAMPER IS INSTALLED AT THE FLOOR |
| | PENETRATION. |
| | |
| | COMMENT 5:SEE ELECTRICAL COMMENTS. |
| | |
| | COMMENT 6:OK |
| | COMMENT 7:OK |
| | COMMENT 8:OK |
| | ***************NEW COMMENTS************* |
| | COMMENT 9:R/A REQUIRED FROM BEDROOM |
| | AREA (ROOM #213). SHOW COMPLIANCE WITH |
| | 2004 FMC 601.4. |
| | |
| | COMMENT 10: PLEASE CLARIFY SUPPLY, |
| | RETURN, & EF-1 DUCTS PENETRATING |
| | FLOOR/CEILING ASSEMBLY.PLAN SHEET A7.1 |
| | & A9.0 INDICATE DUCTS IN 1HR SHAFT. |
| | FIRE DAMPERS REQUIRED WHERE DUCTS |
| | PENETRATE THE SHAFT ENCLOSURE (2004 FMC |
| | 607.5.5.1. OR SHOW COMPLIANCE WITH 2004 |
| | FMC 601.4. (SEE COMMENT 4) |
| | |
| | IF YOU HAVE ANY QUESTIONS, PLEASE |
| | CONTACT PATTY KRAUSS AT (561)805-6719 OR |
| | E-MAIL [email protected]. |
| | |