| Date |
Text |
| 2006-02-10 00:00:00 | ********** UNSAT************ |
| | |
| | |
| | 1)NOTE: PLEASE SEE ANY PLANS CONTAINING |
| | A TITLE BLOCK AND SIGNATURE OF AN |
| | ENGINEER SHALL BEAR THE RAISED SEAL, AND |
| | DATE BY THE SAID ENGINEER. FS471.025 |
| | |
| | 2)NOTE: PLEASE SEE SPECS SUBMITTED DO |
| | NOT INDICATE THE USE OF AN ATS WITH A |
| | MCB . PLEASE SEE MAINS ARE NOT GROUPED |
| | PER 230.72,225.34 |
| | |
| | 3)NOTE: PLEASE SEE 250.6,250.24 THE |
| | "EQUIPMENT GROUNDING CONDUCTORS" ARE |
| | ONLY INSTALLED AFTER THE FIRST MEANS OF |
| | DISCONNECT. |
| | PLEASE SEE RISER SHOWS FROM METER ETC. |
| | 215.5 |
| | |
| | 4)NOTE: PLEASE SEE SITE PLANS DOES NOT |
| | INDOCATE THE NEW GEN DISCONNECT. |
| | PLEASE SEE THE RISER SEEMS TO INDICATE |
| | THE MEANS OF DISCONNECT REQUIRED IN |
| | 225.31 AT GENERATOR? |
| | PLEASE SEE IF GEN CONTAINS A CB , THEN |
| | ONLY A DISCONNECTING MEANS IS REQUIRED |
| | AT MAIN HOUSE AND NOT OCP, ALTHOUGH OCP |
| | IS PERMITTED. |
| | |
| | 5)NOTE: PLEASE SUBMIT TWO COMPLETE SETS |
| | OF PLANS AND SPECS FOR REVIEW AND |
| | STAMPING. |
| | PLEASE SEE ALL SHEETS WERE SUBMITTED |
| | LOOSELY AND NEED TO ATTACHED TOGETHER. |
| | |
| | 6)NOTE: PLEASE SEE THE NOTICE OF |
| | COMMENCMENT HAS SINCE EXPIRED PER FS |
| | 713.13(2). IF WORK HAS NOT COMMENCED |
| | WITHIN 90 DAYS OF RECORDING NOC, THE NOC |
| | SHALL BECOME VOID. |
| | |
| | |
| | |
| | ** PLEASE SUBMIT THE ABOVE INFORMATION |
| | FOR REVIEW. IF THERE ARE ANY QUESTIONS |
| | PLEASE CALL. |