Plan Review Notes
Plan Review Notes For Permit 05111159
Permit Number 05111159
Review Stop P
Sequence Number 2
Notes
Date Text
2006-04-19 00:00:00PAUL SCHMITZ
 [email protected]
 FBC 2004 PLUMBING CODE PLAN REVIEW
 FBC2004 FUEL GAS CODEPLAN REVIEW
 FBC 2004 CH 11, FL ACESSIBILITY CODE
 AMENDMENTS TO THE FLORIDA BUILDING CODE,
  
 CHAPT.1, ADMINISTRATION, 2004 EDITION
  
 UNSAT
 1)SHT CS, PREVIOUS NOTES NOT ADDRESSED.
 URINAL,EYE WASH AND BREAK ROOM SINKS NOT
 SHOWN ON BUILDING DATA FIXTURE COUNT.
  
 2)SHT A-2 SHOW LOCATION OF DRINKING
 FOUNTAIN.
 3) SHT A-4 DETAILS CORELATE DETAILS FOR
 THE LUNCH ROOM SINK AND COFFEE COUNTER
 SINK.
 4) SHT A-2 11-4.24 SINKS.NO DOORS ON
 CABINETS, SHOW CLEAR FLOOR SPACE.
 11-4.24.1 GENERAL.
 SINKS REQUIRED TO BE ACCESSIBLE BY
 SECTION 11-4.1 SHALL COMPLY WITH SECTION
 11-4.24.
 11-4.24.4 DEPTH.
 EACH SINK SHALL BE A MAXIMUM OF 6?
 INCHES (165 MM) DEEP.
 11-4.24.5 CLEAR FLOOR SPACE.
 A CLEAR FLOOR SPACE AT LEAST 30 INCHES
 BY 48 INCHES (760 MM BY 1219 MM)
 COMPLYING WITH SECTION 11-4.2.4 SHALL BE
 PROVIDED IN FRONT OF A SINK TO ALLOW
 FORWARD APPROACH. THE CLEAR FLOOR SPACE
 SHALL BE ON AN ACCESSIBLE ROUTE AND
 SHALL EXTEND A MAXIMUM OF 19 INCHES (485
 MM) UNDERNEATH THE SINK (SEE FIGURE
 11-32).
 11-4.24.7 FAUCETS.
 FAUCETS SHALL COMPLY WITH SECTION
 11-4.27.4. LEVER-OPERATED, PUSH-TYPE,
 TOUCH-TYPE, OR ELECTRONICALLY CONTROLLED
 MECHANISMS ARE ACCEPTABLE DESIGNS.
 5) SHT A-2 VENDING MACHINE.PROVIDE
 INFORMATION ON INDIRECT WASTE FOR
 VENDING MACHINES.
 6) SHT P-1 CORELATE PLUMBING FIXTURE
 SCHEDULE WITH FIXTURE LAYOUT.
 7) SHT P-1,2SHOW ACCESIBLELOCATION
 OF WATER HEATER.
 607.3 THERMAL EXPANSION CONTROL.
 A MEANS OF CONTROLLING INCREASED
 PRESSURE CAUSED BY THERMAL EXPANSION
 SHALL BE PROVIDED WHERE REQUIRED IN
 ACCORDANCE WITH SECTIONS 607.3.1 AND
 607.3.2.
 607.3.1 PRESSURE-REDUCING VALVE.
 FOR WATER SERVICE SYSTEM SIZES UP TO AND
 INCLUDING 2 INCHES (51 MM), A DEVICE FOR
 CONTROLLING PRESSURE SHALL BE INSTALLED
 WHERE, BECAUSE OF THERMAL EXPANSION, THE
 PRESSURE ON THE DOWNSTREAM SIDE OF A
 PRESSURE-REDUCING VALVE EXCEEDS THE
 PRESSURE-REDUCING VALVE SETTING.
 607.3.2 BACKFLOW PREVENTION DEVICE OR
 CHECK VALVE.
 WHERE A BACKFLOW PREVENTION DEVICE,
 CHECK VALVE OR OTHER DEVICE IS INSTALLED
 ON A WATER SUPPLY SYSTEM UTILIZING
 STORAGE WATER HEATING EQUIPMENT SUCH
 THAT THERMAL EXPANSION CAUSES AN
 INCREASE IN PRESSURE, A DEVICE FOR
 CONTROLLING PRESSURE SHALL BE INSTALLED.
 8)SHT P-2 WATER RISER
 SECTION 606 INSTALLATION OF THE BUILDING
 WATER DISTRIBUTION SYSTEM
 606.1 LOCATION OF FULL-OPEN VALVES.
 FULL-OPEN VALVES SHALL BE INSTALLED IN
 THE FOLLOWING LOCATIONS:
 1. ON THE BUILDING WATER SERVICE PIPE
 FROM THE PUBLIC WATER SUPPLY NEAR THE
 CURB.
 2. ON THE WATER DISTRIBUTION SUPPLY PIPE
 AT THE ENTRANCE INTO THE STRUCTURE.
 3. ON THE BASE OF EVERY WATER RISER PIPE
 IN OCCUPANCIES OTHER THAN
 MULTIPLE-FAMILY RESIDENTIAL OCCUPANCIES
 THAT ARE TWO STORIES OR LESS IN HEIGHT
 AND IN ONE- AND TWO-FAMILY RESIDENTIAL
 OCCUPANCIES.
 4. ON THE TOP OF EVERY WATER DOWN-FEED
 PIPE IN OCCUPANCIES OTHER THAN ONE- AND
 TWO-FAMILY RESIDENTIAL OCCUPANCIES.
 9) SHT P-2 WATER HAMMER ARRESTORS SHOWN
 AT TOP OF RISER IS NOT PER THE
 MANFACTURE INSTALLATION INSTRUCTIONS.
 SHOULD BE AT POINT OF SERVICE, OR
 BETWEEN THE LAST TWO FIXTURES.
 10) SHT P-2 WATER AND SANITARY RISRER IS
 NOT SHOWING ALL OFF THE FIXTURES.I COUNT
 AT LEAST 14 FIXTURES.
 END OF COMMENTS, QUESTIONS 561-805-6692
  