| Date |
Text |
| 2006-01-24 00:00:00 | ********* UNSAT ********** |
| | |
| | 1)NOTE: PLEASE CORRELATE RISER DIAGRAM |
| | FOR POOL PANEL WITH POOL PANEL SCHEDULE. |
| | PLEASE SEE RISER INDICATES 100A OCP, AND |
| | FEEDERS FOR 100A ALSO, HOWEVER PLEASE |
| | SEE PANEL "B" SHOWS FEED AT 60A'S, AND |
| | POOL PANEL IS SHOWN AS 60A'S? |
| | 215.5 |
| | |
| | 2)NOTE: PLEASE SEE POOL PANEL SHOWS A |
| | "GAS" POOL HEATER NOW, AND SHOWS A 4KW |
| | LOAD AND SHOWN AT 125%? |
| | PLEASE SEE ORIGINAL PLANS CALLED FOR AN |
| | ELECTRICAL HEAT PUMP TYOE OF POOL HEATER |
| | WHICH REQUIRES THE CONTINUOUS LOADS AT |
| | 125% AND THE OCP AT 125%. IF THIS IS GAS |
| | THEN THE LOADSSHOULD BE ADJUSTED. THIS |
| | WOULD ALSO AFFECT HOW LARGE THE POOL |
| | PANEL WOULD NEED TO BE. PLEASE SEE NOTE |
| | #1 AND #2 FROM PREVIOUS REVIEW. |
| | 215.5 |
| | |
| | 3)NOTE: PLEASE LIST THE REQUIRED ARC |
| | FAULT PROTECTED CIRCUITS ON PANEL |
| | SCHEDULE. PLEASE SEE 2002 NEC 210.12 |
| | WHICH REQUIRES ARC FAULT PROTECTION FOR |
| | ALL "OUTLETS" IN BEDRMS. LTS, SD'S, |
| | RECEPTS, FANS ETC. |
| | PLEASE SEE THIS WAS NOT ACOMMENT ON |
| | PREVIOUS REVIEW,AS THIS WAS ON THE PLANS |
| | AND HAS NOW BEEN REMOVED. PLEASE SEE |
| | VOIDED ELECTRICAL SHEETS FROM FIRST |
| | REVIEW. |
| | |
| | 4)NOTE: PLEASE SEE OCP FOR AHU #2 ON |
| | PANEL "B" WAS ADJUSTED AND INCREASED TO |
| | MEET 424.3B , HOWEVER PLEASE SEE AWG IS |
| | STILL SHOWN AS #8. PLEASE SEE AWG SHOWN |
| | ON PANEL "A" FOR AHU #1 IS CORRECT. |
| | 310.16, 240.4 |
| | |
| | PLEASE SUBMIT THE ABOVE INFORMATION FOR |
| | REVIEW. IF THERE ARE ANY QUESTIONS, |
| | PLEASE DO NOT HESITATE IN CONTACTING |
| | THIS OFFICE. |
| | |
| | |
| | DEWEY PALMER |
| | ELECTRICAL PLAN REVIEW |
| | 561-805-6717 |
| | [email protected] |
| 2006-01-23 00:00:00 | IN ELEC FOR REVIEW |